{"notice":"Live since 2026-11-13 -- each milestone shows only what a public record states","state":"TX","generated":"2026-11-13","rule":"A milestone is shown only when its source links the site to the tracked company: the company's own SEC filing names the site, or the permit holder is the company's subsidiary listed in its Exhibit 21 (filing cited). A name match alone never counts. 'No public source found' means no checked source shows the milestone; 'Not confirmed' means a source exists but its link to the company is not yet proven, so nothing from it is shown. Nothing is inferred.","sources":{"ERCOT public report (for planning purposes only)":"ERCOT public report, website Terms of Use; ERCOT states it is for planning purposes only.","SEC EDGAR filing":"U.S. SEC EDGAR, public domain; the company's own statement.","TCEQ public query":"Texas Commission on Environmental Quality public queries (Central Registry, NSR Air Permits)."},"counts_note":"Counts are computed by Seraphix from the rows below; they are not source figures.","counts":{"milestones_none":14,"milestones_shown":41,"milestones_unconfirmed":5,"sites":20},"total":20,"sites":[{"cik":"0001819989","company":"Cipher Digital","county":"Mitchell","county_basis":"TCEQ Central Registry RN112273891, held by the company's Exhibit 21 subsidiary CIPHER BARBER LAKE LLC","location":"near Colorado City, Texas","milestones":{"energized":{"date":"second quarter of 2025","date_basis":"date phrase adjacent to the milestone phrase in the quote","match_basis":"site name 'Barber Lake' in Cipher Digital's own filing (CIK 0001819989)","quote_or_field":"The increase in the three months ended June 30, 2025 is driven primarily by additional power costs from the energization of the Black Pearl and Barber Lake facilities in the second quarter of 2025.","source_filed":"2025-08-07","source_form":"10-Q","source_label":"SEC EDGAR filing","source_url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998925000081/cifr-20250630.htm","state":"shown","status":"energized (issuer statement)"},"interconnection":{"date":null,"match_basis":"site name 'Barber Lake' in Cipher Digital's own filing (CIK 0001819989)","quote_or_field":"Cipher Barber Lake has received approvals for 300 MW of interconnection without any restrictions on the load profile and has entered into agreements necessary to participate in the Electric Reliability Council of Texas (“ERCOT”) market.","source_filed":"2026-02-24","source_form":"10-K","source_label":"SEC EDGAR filing","source_url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm","state":"shown","status":"approved/executed (issuer statement)"},"permit":{"date":"2026-01-20","date_basis":"TCEQ NSR project complete date (first registration of this permit number)","match_basis":"TCEQ customer 'CIPHER BARBER LAKE LLC' = Ex.21 subsidiary 'Cipher Barber Lake LLC' (https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/exh211subsidiariesasof1231.htm); site term 'Barber Lake' in RE name/location","quote_or_field":"TCEQ NSR permit 182754 type PBR (30 TAC 106.511) status EFFECTIVE; project 403704 'PBR NEW REGISTRATION' INITIAL received 01/20/2026 complete 01/20/2026; customer CIPHER BARBER LAKE LLC; RN RN112273891 'BARBER LAKE DATA CENTER PROJECT', MITCHELL County","source_label":"TCEQ public query","source_url":"https://www2.tceq.texas.gov/airperm/index.cfm?fuseaction=airpermits.project_report&proj_id=403704","state":"shown","status":"air permit issued"}},"mw":300,"mw_source":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000050/cifr-20260930.htm","record_ids":["SX-07-A-0002"],"site":"Barber Lake Facility","slug":"barber-lake-facility","page_url":"https://seraphixsystems.com/pilot-01/state/tx/sites#barber-lake-facility","json_url":"https://seraphixsystems.com/api/v1/tx-sites/barber-lake-facility","record_urls":["https://seraphixsystems.com/r/SX-07-A-0002"]},{"cik":"0001819989","company":"Cipher Digital","county":null,"county_basis":null,"location":"Wink, Texas","milestones":{"energized":{"date":null,"date_basis":"date phrase adjacent to the milestone phrase in the quote","match_basis":"site name 'Black Pearl' in Cipher Digital's own filing (CIK 0001819989)","quote_or_field":"The Company has a 300 MW data center in Wink, Texas that draws power from the power grid (the “Black Pearl Facility”) that was used for bitcoin mining through February 2026, and in August 2026 commenced phased delivery to an HPC tenant.","source_filed":"2026-11-02","source_form":"10-Q","source_label":"SEC EDGAR filing","source_url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000050/cifr-20260930.htm","state":"shown","status":"energized (issuer statement)"},"interconnection":{"date":null,"match_basis":"site name 'Black Pearl' in Cipher Digital's own filing (CIK 0001819989)","quote_or_field":"The Black Pearl Facility has received approvals for 300 MW of interconnection and has entered into agreements necessary to participate in the ERCOT market.","source_filed":"2026-02-24","source_form":"10-K","source_label":"SEC EDGAR filing","source_url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm","state":"shown","status":"approved/executed (issuer statement)"},"permit":{"state":"unconfirmed"}},"mw":300,"mw_source":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000050/cifr-20260930.htm","record_ids":["SX-07-A-0001","SX-07-B-0006"],"site":"Black Pearl Facility","slug":"black-pearl-facility","page_url":"https://seraphixsystems.com/pilot-01/state/tx/sites#black-pearl-facility","json_url":"https://seraphixsystems.com/api/v1/tx-sites/black-pearl-facility","record_urls":["https://seraphixsystems.com/r/SX-07-A-0001","https://seraphixsystems.com/r/SX-07-B-0006"]},{"cik":"0001819989","company":"Cipher Digital","county":null,"county_basis":null,"location":"Texas","milestones":{"energized":{"date":"in 2028","date_basis":"date phrase adjacent to the milestone phrase in the quote","match_basis":"site name 'Colchis' in Cipher Digital's own filing (CIK 0001819989)","quote_or_field":"The Colchis Site includes a fully executed direct interconnection agreement with American Electric Power (“AEP”) for a dual interconnection facility targeting energization in 2028 and options to buy approximately 620 acres of land adjacent to an existing substation.","source_filed":"2026-02-24","source_form":"10-K","source_label":"SEC EDGAR filing","source_url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm","state":"shown","status":"targeted (issuer statement)"},"interconnection":{"date":null,"match_basis":"site name 'Colchis' in Cipher Digital's own filing (CIK 0001819989)","quote_or_field":"The Colchis Site includes a fully executed direct interconnection agreement with American Electric Power (“AEP”) for a dual interconnection facility targeting energization in 2028 and options to buy approximately 620 acres of land adjacent to an existing substation.","source_filed":"2026-02-24","source_form":"10-K","source_label":"SEC EDGAR filing","source_url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm","state":"shown","status":"approved/executed (issuer statement)"},"permit":{"state":"none"}},"mw":null,"mw_source":null,"record_ids":["SX-07-A-0064"],"site":"Colchis Site","slug":"colchis-site","page_url":"https://seraphixsystems.com/pilot-01/state/tx/sites#colchis-site","json_url":"https://seraphixsystems.com/api/v1/tx-sites/colchis-site","record_urls":["https://seraphixsystems.com/r/SX-07-A-0064"]},{"cik":"0001819989","company":"Cipher Digital","county":null,"county_basis":null,"location":"central Texas","milestones":{"energized":{"date":"in 2028","date_basis":"date phrase adjacent to the milestone phrase in the quote","match_basis":"site name 'McLennan Site' in Cipher Digital's own filing (CIK 0001819989)","quote_or_field":"The McLennan Site has targeted capacity of up to 500 MW and estimated energization in 2028.","source_filed":"2026-02-24","source_form":"10-K","source_label":"SEC EDGAR filing","source_url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm","state":"shown","status":"targeted (issuer statement)"},"interconnection":{"date":null,"match_basis":"site name 'McLennan' in Cipher Digital's own filing (CIK 0001819989)","quote_or_field":"Studied Load Conditional Classification : McLennan (500 MW (1))","source_filed":"2026-11-02","source_form":"8-K","source_label":"SEC EDGAR filing","source_url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000047/cipherdigital_businessup.htm","state":"shown","status":"ERCOT Batch Zero: conditional studied load classification (issuer statement)"},"permit":{"state":"none"}},"mw":500,"mw_source":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm","record_ids":["SX-07-A-0319"],"site":"McLennan Site","slug":"mclennan-site","page_url":"https://seraphixsystems.com/pilot-01/state/tx/sites#mclennan-site","json_url":"https://seraphixsystems.com/api/v1/tx-sites/mclennan-site","record_urls":["https://seraphixsystems.com/r/SX-07-A-0319"]},{"cik":"0001819989","company":"Cipher Digital","county":null,"county_basis":null,"location":"West Texas","milestones":{"energized":{"date":"in 2028","date_basis":"date phrase adjacent to the milestone phrase in the quote","match_basis":"site name 'Mikeska' in Cipher Digital's own filing (CIK 0001819989)","quote_or_field":"The Mikeska Site has targeted capacity of up to 500 MW and estimated energization in 2028.","source_filed":"2026-02-24","source_form":"10-K","source_label":"SEC EDGAR filing","source_url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm","state":"shown","status":"targeted (issuer statement)"},"interconnection":{"date":null,"match_basis":"site name 'Mikeska' in Cipher Digital's own filing (CIK 0001819989)","quote_or_field":"Studied Load (PCLR (2)) Conditional Classification : Mikeska (500 MW (1))","source_filed":"2026-11-02","source_form":"8-K","source_label":"SEC EDGAR filing","source_url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000047/cipherdigital_businessup.htm","state":"shown","status":"ERCOT Batch Zero: conditional studied load classification with PCLR designation (issuer statement)"},"permit":{"state":"none"}},"mw":500,"mw_source":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm","record_ids":["SX-07-A-0320"],"site":"Mikeska Site","slug":"mikeska-site","page_url":"https://seraphixsystems.com/pilot-01/state/tx/sites#mikeska-site","json_url":"https://seraphixsystems.com/api/v1/tx-sites/mikeska-site","record_urls":["https://seraphixsystems.com/r/SX-07-A-0320"]},{"cik":"0001819989","company":"Cipher Digital","county":null,"county_basis":null,"location":"East Texas","milestones":{"energized":{"date":"between 2028 and 2029","date_basis":"date phrase adjacent to the milestone phrase in the quote","match_basis":"site name 'Milsing' in Cipher Digital's own filing (CIK 0001819989)","quote_or_field":"The Milsing Site has targeted capacity of up to 500 MW and estimated energization between 2028 and 2029.","source_filed":"2026-02-24","source_form":"10-K","source_label":"SEC EDGAR filing","source_url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm","state":"shown","status":"targeted (issuer statement)"},"interconnection":{"state":"none"},"permit":{"state":"none"}},"mw":500,"mw_source":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm","record_ids":["SX-07-A-0321"],"site":"Milsing Site","slug":"milsing-site","page_url":"https://seraphixsystems.com/pilot-01/state/tx/sites#milsing-site","json_url":"https://seraphixsystems.com/api/v1/tx-sites/milsing-site","record_urls":["https://seraphixsystems.com/r/SX-07-A-0321"]},{"cik":"0001819989","company":"Cipher Digital","county":null,"county_basis":null,"location":"Odessa, Texas","milestones":{"energized":{"date":null,"date_basis":"date phrase adjacent to the milestone phrase in the quote","match_basis":"site name 'Odessa Facility' in Cipher Digital's own filing (CIK 0001819989)","quote_or_field":"The Company also operates one wholly owned bitcoin mining data center, a 207 MW site located in Odessa, Texas that draws fixed priced power from a power purchase agreement with its electricity provider (the “Odessa Facility”).","source_filed":"2026-11-02","source_form":"10-Q","source_label":"SEC EDGAR filing","source_url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000050/cifr-20260930.htm","state":"shown","status":"energized (issuer statement)"},"interconnection":{"date":null,"match_basis":"site name 'Odessa Facility' in Cipher Digital's own filing (CIK 0001819989)","quote_or_field":"The Luminant Lease Agreement leases a plot of land to the Company for the data center, ancillary infrastructure and electrical system (the “Interconnection Electrical Facilities” or “substation”) of the Odessa Facility.","source_filed":"2026-11-02","source_form":"10-Q","source_label":"SEC EDGAR filing","source_url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000050/cifr-20260930.htm","state":"shown","status":"mentioned (issuer statement)"},"permit":{"state":"none"}},"mw":207,"mw_source":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000050/cifr-20260930.htm","record_ids":["SX-07-A-0004"],"site":"Odessa Facility","slug":"odessa-facility","page_url":"https://seraphixsystems.com/pilot-01/state/tx/sites#odessa-facility","json_url":"https://seraphixsystems.com/api/v1/tx-sites/odessa-facility","record_urls":["https://seraphixsystems.com/r/SX-07-A-0004"]},{"cik":"0001819989","company":"Cipher Digital","county":null,"county_basis":null,"location":"LaSalle, Texas","milestones":{"energized":{"date":"for 2027","date_basis":"date phrase adjacent to the milestone phrase in the quote","match_basis":"site name 'Reveille' in Cipher Digital's own filing (CIK 0001819989)","quote_or_field":"Completed acquisition of Reveille data center site, which includes approvals for 70 MW and potential to expand to 200 MW, with energization targeted for 2027","source_filed":"2024-10-31","source_form":"8-K","source_label":"SEC EDGAR filing","source_url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998924000026/cifr-20241031xex991.htm","state":"shown","status":"targeted (issuer statement)"},"interconnection":{"date":null,"match_basis":"site name 'Reveille' in Cipher Digital's own filing (CIK 0001819989)","quote_or_field":"The Reveille Site has ERCOT interconnection approval of up to 70 MW, with the possibility for expansion.","source_filed":"2026-02-24","source_form":"10-K","source_label":"SEC EDGAR filing","source_url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm","state":"shown","status":"approved/executed (issuer statement)"},"permit":{"state":"none"}},"mw":null,"mw_source":null,"record_ids":["SX-07-A-0490"],"site":"Reveille Facility","slug":"reveille-facility","page_url":"https://seraphixsystems.com/pilot-01/state/tx/sites#reveille-facility","json_url":"https://seraphixsystems.com/api/v1/tx-sites/reveille-facility","record_urls":["https://seraphixsystems.com/r/SX-07-A-0490"]},{"cik":"0001839341","company":"Core Scientific","county":null,"county_basis":null,"location":"Austin, Texas","milestones":{"energized":{"date":"second quarter of 2024","date_basis":"date phrase adjacent to the milestone phrase in the quote","match_basis":"site name 'Austin, Texas' in Core Scientific's own filing (CIK 0001839341)","quote_or_field":"In addition, lease operations at our Austin, Texas data center, which commenced in the second quarter of 2024, contributed to higher colocation revenue.","source_filed":null,"source_form":"record source","source_label":"SEC EDGAR filing","source_url":"https://www.sec.gov/Archives/edgar/data/1839341/000162828026013305/core-20251231.htm","state":"shown","status":"energized (issuer statement)"},"interconnection":{"date":null,"match_basis":"site name 'Austin' in Core Scientific's own filing (CIK 0001839341)","quote_or_field":"Power for the Austin Campus is supplied by Austin Energy under Austin Energy’s general tariff structure.","source_filed":"2026-04-21","source_form":"8-K","source_label":"SEC EDGAR filing","source_url":"https://www.sec.gov/Archives/edgar/data/1839341/000119312526165121/d149019dex992.htm","state":"shown","status":"utility service in place: Austin Energy general tariff (issuer statement)"},"permit":{"state":"none"}},"mw":null,"mw_source":null,"record_ids":["SX-07-A-0254"],"site":"Austin, Texas","slug":"austin-texas","page_url":"https://seraphixsystems.com/pilot-01/state/tx/sites#austin-texas","json_url":"https://seraphixsystems.com/api/v1/tx-sites/austin-texas","record_urls":["https://seraphixsystems.com/r/SX-07-A-0254"]},{"cik":"0001839341","company":"Core Scientific","county":"Ward","county_basis":"the record's own location text","location":"Ward County, Texas","milestones":{"energized":{"state":"none"},"interconnection":{"state":"none"},"permit":{"state":"none"}},"mw":null,"mw_source":null,"record_ids":["SX-07-A-0513"],"site":"Cedarvale Facility","slug":"cedarvale-facility","page_url":"https://seraphixsystems.com/pilot-01/state/tx/sites#cedarvale-facility","json_url":"https://seraphixsystems.com/api/v1/tx-sites/cedarvale-facility","record_urls":["https://seraphixsystems.com/r/SX-07-A-0513"]},{"cik":"0001839341","company":"Core Scientific","county":null,"county_basis":null,"location":"Texas","milestones":{"energized":{"date":null,"match_basis":"site name 'Cottonwood 1' in Core Scientific's own filing (CIK 0001839341)","quote_or_field":"Pecos, TX 250MW (Cottonwood 1 & 2) • Greenfield Buildout in 2022 • Campus has (2) phases – COT1 and COT2 • Core Scientific Leased • COT1 - (1) Operational Building totaling 50MW of energized capacity (~15k miners) with expansion capacity of additional 200MW","source_filed":"2024-06-12","source_form":"8-K","source_label":"SEC EDGAR filing","source_url":"https://www.sec.gov/Archives/edgar/data/1839341/000162828024027821/corescientificinvestorda.htm","state":"shown","status":"energized: 50MW energized capacity at COT1 (issuer statement)"},"interconnection":{"date":null,"match_basis":"site name 'Cottonwood' in Core Scientific's own filing (CIK 0001839341)","quote_or_field":"The table below summarizes the contracted capacity in megawatts (“MW”) by facility location and electric utility provider as of December 31, 2024: Electric Utility Providers Contracted Power Capacity (MW) Facility Location Tennessee Valley Authority 150 Calvert City, Kentucky (\"Calvert\") Murphy Electric Power Board 35 Marble, North Carolina (\"Marble 1\") Duke Energy 68 Marble, North Carolina (\"Marble 2\") Dalton Utilities 53 Dalton, Georgia (\"Dalton 1 & 2\") Dalton Utilities 142 Dalton, Georgia (\"Dalton 3\") Nodak Electric Cooperative, Inc. 100 Grand Forks, North Dakota (\"Grand Forks\") Denton Municipal Electric 391 Denton, Texas (\"Denton\") Texas New-Mexico Power 253 Pecos, Texas (\"Cottonwood”)","source_filed":"2025-02-27","source_form":"10-K","source_label":"SEC EDGAR filing","source_url":"https://www.sec.gov/Archives/edgar/data/1839341/000162828025008302/core-20241231.htm","state":"shown","status":"utility contract in place: Texas-New Mexico Power, 253 MW contracted capacity (issuer statement; Cottonwood campus-level)"},"permit":{"state":"none"}},"mw":null,"mw_source":null,"record_ids":["SX-07-A-0512"],"site":"Cottonwood 1 facility","slug":"cottonwood-1-facility","page_url":"https://seraphixsystems.com/pilot-01/state/tx/sites#cottonwood-1-facility","json_url":"https://seraphixsystems.com/api/v1/tx-sites/cottonwood-1-facility","record_urls":["https://seraphixsystems.com/r/SX-07-A-0512"]},{"cik":"0001839341","company":"Core Scientific","county":null,"county_basis":null,"location":"Denton, Texas","milestones":{"energized":{"date":"prior to March 25, 2022","date_basis":"date phrase adjacent to the milestone phrase in the quote","match_basis":"site name 'Denton' in Core Scientific's own filing (CIK 0001839341)","quote_or_field":"Denton, Texas: The site’s existing 297 Megawatts of electrical power has been conditionally approved by the Electric Reliability Council of Texas (“ERCOT”) as “Base Load, Pathway (a)” (“longstanding existing load”) based on its status as load energized prior to March 25, 2022 and is not subject to Batch Zero allocation process.","source_filed":"2026-09-10","source_form":"8-K","source_label":"SEC EDGAR filing","source_url":"https://www.sec.gov/Archives/edgar/data/1839341/000183934126000023/core-20260910.htm","state":"shown","status":"energized (issuer statement)"},"interconnection":{"date":null,"match_basis":"site name 'Denton' in Core Scientific's own filing (CIK 0001839341)","quote_or_field":"Denton, Texas: The site’s existing 297 Megawatts of electrical power has been conditionally approved by the Electric Reliability Council of Texas (“ERCOT”) as “Base Load, Pathway (a)” (“longstanding existing load”) based on its status as load energized prior to March 25, 2022 and is not subject to Batch Zero allocation process.","source_filed":"2026-09-10","source_form":"8-K","source_label":"SEC EDGAR filing","source_url":"https://www.sec.gov/Archives/edgar/data/1839341/000183934126000023/core-20260910.htm","state":"shown","status":"ERCOT conditional approval: Base Load, Pathway (a), 297 MW (issuer statement)"},"permit":{"state":"unconfirmed"}},"mw":null,"mw_source":null,"record_ids":["SX-07-A-0217"],"site":"Denton, Texas","slug":"denton-texas","page_url":"https://seraphixsystems.com/pilot-01/state/tx/sites#denton-texas","json_url":"https://seraphixsystems.com/api/v1/tx-sites/denton-texas","record_urls":["https://seraphixsystems.com/r/SX-07-A-0217"]},{"cik":"0001839341","company":"Core Scientific","county":"Hunt","county_basis":"named in the site name ('Hunt County, Texas')","location":"Hunt County, Texas; Texas","milestones":{"energized":{"state":"none"},"interconnection":{"date":null,"match_basis":"site name 'Hunt County' in Core Scientific's own filing (CIK 0001839341)","quote_or_field":"On May 5, 2026, we closed on the acquisition of land and related electrical power in Hunt County, Texas for approximately $233 million in cash, which is expected to support approximately 430 MW of gross power capacity, with an approved ERCOT interconnection ramp schedule.","source_filed":"2026-11-05","source_form":"10-Q","source_label":"SEC EDGAR filing","source_url":"https://www.sec.gov/Archives/edgar/data/1839341/000183934126000030/core-20260930.htm","state":"shown","status":"approved/executed (issuer statement)"},"permit":{"state":"unconfirmed"}},"mw":430,"mw_source":"https://www.sec.gov/Archives/edgar/data/1839341/000183934126000014/core-20260630.htm","record_ids":["SX-07-A-0179","SX-07-A-0557"],"site":"Hunt County, Texas","slug":"hunt-county-texas","page_url":"https://seraphixsystems.com/pilot-01/state/tx/sites#hunt-county-texas","json_url":"https://seraphixsystems.com/api/v1/tx-sites/hunt-county-texas","record_urls":["https://seraphixsystems.com/r/SX-07-A-0179","https://seraphixsystems.com/r/SX-07-A-0557"]},{"cik":"0001839341","company":"Core Scientific","county":null,"county_basis":null,"location":"Pecos, TX; Pecos, Texas","milestones":{"energized":{"date":"after March 25, 2022 and before July 10, 2026","date_basis":"date phrase adjacent to the milestone phrase in the quote","match_basis":"site name 'Pecos' in Core Scientific's own filing (CIK 0001839341)","quote_or_field":"Pecos, Texas: The existing 300 Megawatts of electrical power has been conditionally approved in Batch Zero as “Base Load, Pathway (b)” (“existing load energized after March 25, 2022 and before July 10, 2026”).","source_filed":"2026-09-10","source_form":"8-K","source_label":"SEC EDGAR filing","source_url":"https://www.sec.gov/Archives/edgar/data/1839341/000183934126000023/core-20260910.htm","state":"shown","status":"energized (issuer statement)"},"interconnection":{"date":null,"match_basis":"site name 'Pecos' in Core Scientific's own filing (CIK 0001839341)","quote_or_field":"Pecos, Texas: The existing 300 Megawatts of electrical power has been conditionally approved in Batch Zero as “Base Load, Pathway (b)” (“existing load energized after March 25, 2022 and before July 10, 2026”).","source_filed":"2026-09-10","source_form":"8-K","source_label":"SEC EDGAR filing","source_url":"https://www.sec.gov/Archives/edgar/data/1839341/000183934126000023/core-20260910.htm","state":"shown","status":"ERCOT Batch Zero conditional approval: Base Load, Pathway (b), 300 MW (issuer statement)"},"permit":{"state":"unconfirmed"}},"mw":null,"mw_source":null,"record_ids":["SX-07-A-0172","SX-07-B-0003"],"site":"Pecos, TX","slug":"pecos-tx","page_url":"https://seraphixsystems.com/pilot-01/state/tx/sites#pecos-tx","json_url":"https://seraphixsystems.com/api/v1/tx-sites/pecos-tx","record_urls":["https://seraphixsystems.com/r/SX-07-A-0172","https://seraphixsystems.com/r/SX-07-B-0003"]},{"cik":"0001878848","company":"IREN","county":"Childress","county_basis":"TCEQ Central Registry RN111563557, held by the company's Exhibit 21 subsidiary IE US DEVELOPMENT HOLDINGS 3 INC","location":"Childress, Texas","milestones":{"energized":{"date":"August 2026","date_basis":"date phrase adjacent to the milestone phrase in the quote","match_basis":"site name 'Horizon 1' in IREN's own filing (CIK 0001878848)","quote_or_field":"Recent Developments Customer Delivery Horizon 1 was delivered to and accepted by Microsoft in August 2026 and remains in service.","source_filed":"2026-11-05","source_form":"10-Q","source_label":"SEC EDGAR filing","source_url":"https://www.sec.gov/Archives/edgar/data/1878848/000187884826000066/iren-20260930.htm","state":"shown","status":"energized (issuer statement)"},"interconnection":{"date":null,"match_basis":"site name 'Childress' in IREN's own filing (CIK 0001878848)","quote_or_field":"We have three data center sites in Texas, United States with executed grid connection agreements, namely Childress, Sweetwater 1 and Sweetwater 2.","source_filed":"2025-08-28","source_form":"10-K","source_label":"SEC EDGAR filing","source_url":"https://www.sec.gov/Archives/edgar/data/1878848/000187884825000063/iren-20250630.htm","state":"shown","status":"approved/executed: grid connection agreement for the Childress campus (issuer statement; campus-level)"},"permit":{"date":"2026-09-21","match_basis":"state order covers all permits sought by data centers in TX; this site's own evidence shows the permit sought and not granted","permit_sought":{"ex21_filing":"https://www.sec.gov/Archives/edgar/data/1878848/000187884826000052/iren-20260630xex211.htm","holder":"IE US DEVELOPMENT HOLDINGS 3 INC","holder_link":"TCEQ customer 'IE US DEVELOPMENT HOLDINGS 3 INC' = Ex.21 subsidiary 'IE US Development Holdings 3 Inc.' (https://www.sec.gov/Archives/edgar/data/1878848/000187884826000052/iren-20260630xex211.htm)","programs_pending":["AIROP 4951 PENDING (since 2022-08-31)"],"registry":"TCEQ Central Registry RN111563557","registry_url":"https://www15.tceq.texas.gov/crpub/index.cfm?fuseaction=regent.validateRE&re_ref_num_txt=RN111563557"},"quote_or_field":"For example, on September 21, 2026, the Governor of Texas directed the Texas Commission on Environmental Quality (“TCEQ”) to halt all permits sought by data centers in Texas until completion of ERCOT’s audit of data centers in its interconnection queues.","source_filed":"2026-11-02","source_form":"10-Q","source_label":"SEC EDGAR filing","source_url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000050/cifr-20260930.htm","state":"shown","status":"halted by state order"}},"mw":null,"mw_source":null,"record_ids":["SX-07-A-0497"],"site":"Horizon 1","slug":"horizon-1","page_url":"https://seraphixsystems.com/pilot-01/state/tx/sites#horizon-1","json_url":"https://seraphixsystems.com/api/v1/tx-sites/horizon-1","record_urls":["https://seraphixsystems.com/r/SX-07-A-0497"]},{"cik":"0001878848","company":"IREN","county":"Childress","county_basis":"TCEQ Central Registry RN111563557, held by the company's Exhibit 21 subsidiary IE US DEVELOPMENT HOLDINGS 3 INC","location":"Childress, Texas","milestones":{"energized":{"date":"calendar Q4 2026","date_basis":"date phrase adjacent to the milestone phrase in the quote","match_basis":"site name 'Horizon 2' in IREN's own filing (CIK 0001878848)","quote_or_field":"While Horizon 1 was delivered to, and accepted by, Microsoft in August 2026, Horizon 2-4 is targeted for delivery in phases in calendar Q4 2026, with grace periods under the Microsoft Agreement for delivery extending from mid-Q4 2026 to the beginning of Q2 2027.","source_filed":"2026-08-27","source_form":"10-K","source_label":"SEC EDGAR filing","source_url":"https://www.sec.gov/Archives/edgar/data/1878848/000187884826000052/iren-20260630.htm","state":"shown","status":"targeted (issuer statement)"},"interconnection":{"date":null,"match_basis":"site name 'Childress' in IREN's own filing (CIK 0001878848)","quote_or_field":"We have three data center sites in Texas, United States with executed grid connection agreements, namely Childress, Sweetwater 1 and Sweetwater 2.","source_filed":"2025-08-28","source_form":"10-K","source_label":"SEC EDGAR filing","source_url":"https://www.sec.gov/Archives/edgar/data/1878848/000187884825000063/iren-20250630.htm","state":"shown","status":"approved/executed: grid connection agreement for the Childress campus (issuer statement; campus-level)"},"permit":{"date":"2026-09-21","match_basis":"state order covers all permits sought by data centers in TX; this site's own evidence shows the permit sought and not granted","permit_sought":{"ex21_filing":"https://www.sec.gov/Archives/edgar/data/1878848/000187884826000052/iren-20260630xex211.htm","holder":"IE US DEVELOPMENT HOLDINGS 3 INC","holder_link":"TCEQ customer 'IE US DEVELOPMENT HOLDINGS 3 INC' = Ex.21 subsidiary 'IE US Development Holdings 3 Inc.' (https://www.sec.gov/Archives/edgar/data/1878848/000187884826000052/iren-20260630xex211.htm)","programs_pending":["AIROP 4951 PENDING (since 2022-08-31)"],"registry":"TCEQ Central Registry RN111563557","registry_url":"https://www15.tceq.texas.gov/crpub/index.cfm?fuseaction=regent.validateRE&re_ref_num_txt=RN111563557"},"quote_or_field":"For example, on September 21, 2026, the Governor of Texas directed the Texas Commission on Environmental Quality (“TCEQ”) to halt all permits sought by data centers in Texas until completion of ERCOT’s audit of data centers in its interconnection queues.","source_filed":"2026-11-02","source_form":"10-Q","source_label":"SEC EDGAR filing","source_url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000050/cifr-20260930.htm","state":"shown","status":"halted by state order"}},"mw":null,"mw_source":null,"record_ids":["SX-07-A-0498"],"site":"Horizon 2","slug":"horizon-2","page_url":"https://seraphixsystems.com/pilot-01/state/tx/sites#horizon-2","json_url":"https://seraphixsystems.com/api/v1/tx-sites/horizon-2","record_urls":["https://seraphixsystems.com/r/SX-07-A-0498"]},{"cik":"0001878848","company":"IREN","county":"Childress","county_basis":"TCEQ Central Registry RN111563557, held by the company's Exhibit 21 subsidiary IE US DEVELOPMENT HOLDINGS 3 INC","location":"Childress, Texas","milestones":{"energized":{"date":"calendar Q4 2026","date_basis":"date phrase adjacent to the milestone phrase in the quote","match_basis":"site name 'Horizon 2-4' in IREN's own filing (CIK 0001878848)","quote_or_field":"While Horizon 1 was delivered to, and accepted by, Microsoft in August 2026, Horizon 2-4 is targeted for delivery in phases in calendar Q4 2026, with grace periods under the Microsoft Agreement for delivery extending from mid-Q4 2026 to the beginning of Q2 2027.","source_filed":"2026-08-27","source_form":"10-K","source_label":"SEC EDGAR filing","source_url":"https://www.sec.gov/Archives/edgar/data/1878848/000187884826000052/iren-20260630.htm","state":"shown","status":"targeted (issuer statement)"},"interconnection":{"date":null,"match_basis":"site name 'Childress' in IREN's own filing (CIK 0001878848)","quote_or_field":"We have three data center sites in Texas, United States with executed grid connection agreements, namely Childress, Sweetwater 1 and Sweetwater 2.","source_filed":"2025-08-28","source_form":"10-K","source_label":"SEC EDGAR filing","source_url":"https://www.sec.gov/Archives/edgar/data/1878848/000187884825000063/iren-20250630.htm","state":"shown","status":"approved/executed: grid connection agreement for the Childress campus (issuer statement; campus-level)"},"permit":{"date":"2026-09-21","match_basis":"state order covers all permits sought by data centers in TX; this site's own evidence shows the permit sought and not granted","permit_sought":{"ex21_filing":"https://www.sec.gov/Archives/edgar/data/1878848/000187884826000052/iren-20260630xex211.htm","holder":"IE US DEVELOPMENT HOLDINGS 3 INC","holder_link":"TCEQ customer 'IE US DEVELOPMENT HOLDINGS 3 INC' = Ex.21 subsidiary 'IE US Development Holdings 3 Inc.' (https://www.sec.gov/Archives/edgar/data/1878848/000187884826000052/iren-20260630xex211.htm)","programs_pending":["AIROP 4951 PENDING (since 2022-08-31)"],"registry":"TCEQ Central Registry RN111563557","registry_url":"https://www15.tceq.texas.gov/crpub/index.cfm?fuseaction=regent.validateRE&re_ref_num_txt=RN111563557"},"quote_or_field":"For example, on September 21, 2026, the Governor of Texas directed the Texas Commission on Environmental Quality (“TCEQ”) to halt all permits sought by data centers in Texas until completion of ERCOT’s audit of data centers in its interconnection queues.","source_filed":"2026-11-02","source_form":"10-Q","source_label":"SEC EDGAR filing","source_url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000050/cifr-20260930.htm","state":"shown","status":"halted by state order"}},"mw":null,"mw_source":null,"record_ids":["SX-07-A-0499"],"site":"Horizon 3","slug":"horizon-3","page_url":"https://seraphixsystems.com/pilot-01/state/tx/sites#horizon-3","json_url":"https://seraphixsystems.com/api/v1/tx-sites/horizon-3","record_urls":["https://seraphixsystems.com/r/SX-07-A-0499"]},{"cik":"0001878848","company":"IREN","county":"Childress","county_basis":"TCEQ Central Registry RN111563557, held by the company's Exhibit 21 subsidiary IE US DEVELOPMENT HOLDINGS 3 INC","location":"Childress, Texas","milestones":{"energized":{"date":"calendar Q4 2026","date_basis":"date phrase adjacent to the milestone phrase in the quote","match_basis":"site name 'Horizon 2-4' in IREN's own filing (CIK 0001878848)","quote_or_field":"While Horizon 1 was delivered to, and accepted by, Microsoft in August 2026, Horizon 2-4 is targeted for delivery in phases in calendar Q4 2026, with grace periods under the Microsoft Agreement for delivery extending from mid-Q4 2026 to the beginning of Q2 2027.","source_filed":"2026-08-27","source_form":"10-K","source_label":"SEC EDGAR filing","source_url":"https://www.sec.gov/Archives/edgar/data/1878848/000187884826000052/iren-20260630.htm","state":"shown","status":"targeted (issuer statement)"},"interconnection":{"date":null,"match_basis":"site name 'Childress' in IREN's own filing (CIK 0001878848)","quote_or_field":"We have three data center sites in Texas, United States with executed grid connection agreements, namely Childress, Sweetwater 1 and Sweetwater 2.","source_filed":"2025-08-28","source_form":"10-K","source_label":"SEC EDGAR filing","source_url":"https://www.sec.gov/Archives/edgar/data/1878848/000187884825000063/iren-20250630.htm","state":"shown","status":"approved/executed: grid connection agreement for the Childress campus (issuer statement; campus-level)"},"permit":{"date":"2026-09-21","match_basis":"state order covers all permits sought by data centers in TX; this site's own evidence shows the permit sought and not granted","permit_sought":{"ex21_filing":"https://www.sec.gov/Archives/edgar/data/1878848/000187884826000052/iren-20260630xex211.htm","holder":"IE US DEVELOPMENT HOLDINGS 3 INC","holder_link":"TCEQ customer 'IE US DEVELOPMENT HOLDINGS 3 INC' = Ex.21 subsidiary 'IE US Development Holdings 3 Inc.' (https://www.sec.gov/Archives/edgar/data/1878848/000187884826000052/iren-20260630xex211.htm)","programs_pending":["AIROP 4951 PENDING (since 2022-08-31)"],"registry":"TCEQ Central Registry RN111563557","registry_url":"https://www15.tceq.texas.gov/crpub/index.cfm?fuseaction=regent.validateRE&re_ref_num_txt=RN111563557"},"quote_or_field":"For example, on September 21, 2026, the Governor of Texas directed the Texas Commission on Environmental Quality (“TCEQ”) to halt all permits sought by data centers in Texas until completion of ERCOT’s audit of data centers in its interconnection queues.","source_filed":"2026-11-02","source_form":"10-Q","source_label":"SEC EDGAR filing","source_url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000050/cifr-20260930.htm","state":"shown","status":"halted by state order"}},"mw":null,"mw_source":null,"record_ids":["SX-07-A-0500"],"site":"Horizon 4","slug":"horizon-4","page_url":"https://seraphixsystems.com/pilot-01/state/tx/sites#horizon-4","json_url":"https://seraphixsystems.com/api/v1/tx-sites/horizon-4","record_urls":["https://seraphixsystems.com/r/SX-07-A-0500"]},{"cik":"0001878848","company":"IREN","county":null,"county_basis":null,"location":"Texas, United States","milestones":{"energized":{"date":null,"match_basis":"site name 'Sweetwater 1' in IREN's own filing (CIK 0001878848)","quote_or_field":"We energized the Sweetwater 1 substation on schedule, advanced the Horizon 1-4 liquid-cooled data centers at Childress in support of our $9.7bn contract with Microsoft, and continued transitioning existing data centers from ASICs to GPUs for higher- value AI Cloud workloads.","source_filed":"2026-05-08","source_form":"8-K","source_label":"SEC EDGAR filing","source_url":"https://www.sec.gov/Archives/edgar/data/1878848/000187884826000025/irenreportsq3fy26results.htm","state":"shown","status":"substation energized (issuer statement)"},"interconnection":{"date":null,"match_basis":"site name 'Sweetwater 1' in IREN's own filing (CIK 0001878848)","quote_or_field":"We have three data center sites in Texas, United States with executed grid connection agreements, namely Childress, Sweetwater 1 and Sweetwater 2.","source_filed":"2025-08-28","source_form":"10-K","source_label":"SEC EDGAR filing","source_url":"https://www.sec.gov/Archives/edgar/data/1878848/000187884825000063/iren-20250630.htm","state":"shown","status":"approved/executed: grid connection agreement (issuer statement)"},"permit":{"state":"none"}},"mw":1400,"mw_source":"https://www.sec.gov/Archives/edgar/data/1878848/000187884826000052/iren-20260630.htm","record_ids":["SX-07-A-0531"],"site":"Sweetwater 1","slug":"sweetwater-1","page_url":"https://seraphixsystems.com/pilot-01/state/tx/sites#sweetwater-1","json_url":"https://seraphixsystems.com/api/v1/tx-sites/sweetwater-1","record_urls":["https://seraphixsystems.com/r/SX-07-A-0531"]},{"cik":"0001878848","company":"IREN","county":null,"county_basis":null,"location":"Texas, United States","milestones":{"energized":{"date":"fourth quarter of calendar year 2027","date_basis":"date phrase adjacent to the milestone phrase in the quote","match_basis":"site name 'Sweetwater 2' in IREN's own filing (CIK 0001878848)","quote_or_field":"We are targeting connection to the Electric Reliability Council of Texas (“ERCOT”) grid and a substation energization date in the second quarter of calendar year 2026 for Sweetwater 1 and the fourth quarter of calendar year 2027 for Sweetwater 2.","source_filed":"2026-02-05","source_form":"10-Q","source_label":"SEC EDGAR filing","source_url":"https://www.sec.gov/Archives/edgar/data/1878848/000187884826000015/iren-20251231.htm","state":"shown","status":"targeted: substation energization (issuer statement)"},"interconnection":{"date":"March 17, 2025","date_basis":"date phrase adjacent to the milestone phrase in the quote","match_basis":"site name 'Sweetwater 2' in IREN's own filing (CIK 0001878848)","quote_or_field":"On March 17, 2025, IREN Limited (the “Company”) released a press release announcing the signing of a 600MW grid connection agreement with AEP Texas Inc. in relation to its Sweetwater 2 project in West Texas.","source_filed":"2025-03-17","source_form":"6-K","source_label":"SEC EDGAR filing","source_url":"https://www.sec.gov/Archives/edgar/data/1878848/000187884825000013/irenlimited-6ksweetwater2m.htm","state":"shown","status":"approved/executed: 600MW grid connection agreement with AEP Texas Inc. (issuer statement)"},"permit":{"state":"unconfirmed"}},"mw":600,"mw_source":"https://www.sec.gov/Archives/edgar/data/1878848/000187884826000052/iren-20260630.htm","record_ids":["SX-07-A-0532"],"site":"Sweetwater 2","slug":"sweetwater-2","page_url":"https://seraphixsystems.com/pilot-01/state/tx/sites#sweetwater-2","json_url":"https://seraphixsystems.com/api/v1/tx-sites/sweetwater-2","record_urls":["https://seraphixsystems.com/r/SX-07-A-0532"]}],"cite":"Seraphix Systems, Seraphix Company Intelligence, https://seraphixsystems.com, retrieved 2026-11-24. CC BY 4.0. Cite each record by its record_url."}