{"$schema":"https://seraphixsystems.com/data/schema/dossier.schema.json","generated":"2026-11-05T18:53:37+00:00","publisher":"Seraphix Systems NJ LLC","license":{"name":"CC BY 4.0","url":"https://creativecommons.org/licenses/by/4.0/","attribution":"Seraphix Systems"},"cik":"0001819989","slug":"cipher-digital","legal_name":"Cipher Digital Inc.","display_name":"Cipher Digital","former_names":["Cipher Mining Inc.","GOOD WORKS ACQUISITION CORP."],"role":"HOST","pilots":["pilot-01"],"planned_depth":"full","identity":{"state_of_incorporation":"Delaware","state_of_incorporation_source":"Form 10-Q cover, filed 2026-11-02","sic_description":"Finance Services","source_url":"https://data.sec.gov/submissions/CIK0001819989.json","checked":"2026-11-04"},"version":1,"corrections":[],"status":"FULL","located_states":["OH","TX"],"mw_stated":4327,"latest_record":"2026-11-02","url":"https://seraphixsystems.com/pilot-01/company/cipher-digital","edgar":"https://www.sec.gov/cgi-bin/browse-edgar?action=getcompany&CIK=0001819989","feed":"https://seraphixsystems.com/feeds/company/cipher-digital.json","filings_in_stream":[{"detail":"QUARTERLY REPORT","form":"10-Q","t":"2026-11-02T14:14:01.000Z","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000050/cifr-20260930.htm"},{"detail":"ITEM 2.02 · ITEM 7.01 · ITEM 9.01","form":"8-K","t":"2026-11-02T12:17:40.000Z","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000047/cifr-20261102.htm"},{"detail":"ITEM 1.01 · ITEM 2.03 · ITEM 3.02 · ITEM 7.01 · ITEM 9.01","form":"8-K","t":"2026-10-16T21:26:24.000Z","url":"https://www.sec.gov/Archives/edgar/data/1819989/000119312526424297/d313847d8k.htm"},{"detail":"ITEM 8.01 · ITEM 9.01","form":"8-K","t":"2026-10-14T11:49:45.000Z","url":"https://www.sec.gov/Archives/edgar/data/1819989/000119312526421035/d77312d8k.htm"},{"detail":"ITEM 7.01 · ITEM 8.01 · ITEM 9.01","form":"8-K","t":"2026-10-13T12:10:47.000Z","url":"https://www.sec.gov/Archives/edgar/data/1819989/000119312526419743/d134900d8k.htm"},{"detail":"ITEM 7.01 · ITEM 8.01 · ITEM 9.01","form":"8-K","t":"2026-09-25T12:04:27.000Z","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000043/cifr-20260924.htm"},{"detail":"QUARTERLY REPORT","form":"10-Q","t":"2026-08-04T13:07:07.000Z","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000041/cifr-20260630.htm"},{"detail":"ITEM 2.02 · ITEM 7.01 · ITEM 9.01","form":"8-K","t":"2026-08-04T11:37:42.000Z","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000038/cifr-20260804.htm"}],"records":[{"id":"SX-07-A-0001","url":"https://seraphixsystems.com/r/SX-07-A-0001","json":"https://seraphixsystems.com/r/SX-07-A-0001.json","label":"RECORD SX 07-A // SITES // FILED 2026-11-02","scope":"entity","entity":{"cik":"0001819989","legal_name":"Cipher Digital Inc.","display_name":"Cipher Digital","url":"https://seraphixsystems.com/pilot-01/company/cipher-digital"},"state":"TX","section":"sites","tag":"COMPANY DISCLOSURE","instrument":"SITE","primary_pending":false,"claim":"Black Pearl Facility -- 300 MW -- Wink, Texas -- bitcoin mining through February 2026; phased delivery to an HPC tenant commenced August 2026","quote":"The Company has a 300 MW data center in Wink, Texas that draws power from the power grid (the “Black Pearl Facility”) that was used for bitcoin mining through February 2026, and in August 2026 commenced phased delivery to an HPC tenant.","fields":{"location":"Wink, Texas","mw":300,"site":"Black Pearl Facility","state":"TX","status":"operating (HPC phased delivery)"},"basis":"regulator_hosted_filing","basis_label":"REGULATOR-HOSTED FILING","source":{"title":"Cipher Digital Inc. — 10-Q Note 1","locator":"10-Q Note 1, Nature of operations","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000050/cifr-20260930.htm"},"also":[],"primary":{"title":"Cipher Digital Inc. — 10-Q Note 1","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000050/cifr-20260930.htm"},"dates":{"occurred":null,"reported":null,"source_published":"2026-11-02","first_seen":null,"ingested":"2026-11-04","corrected":null},"record_date":"2026-11-02","lifecycle":"active","version":1,"versions":[{"version":1,"claim":"Black Pearl Facility -- 300 MW -- Wink, Texas -- bitcoin mining through February 2026; phased delivery to an HPC tenant commenced August 2026","current":true,"url":"https://seraphixsystems.com/r/SX-07-A-0001/v1","json":"https://seraphixsystems.com/r/SX-07-A-0001/v1.json"}],"cite":{"publisher":"Seraphix Systems","record_id":"SX-07-A-0001","url":"https://seraphixsystems.com/r/SX-07-A-0001","version":1,"title":"RECORD SX 07-A // SITES // FILED 2026-11-02","text":"Seraphix Systems, \"SX-07-A-0001\", v1, https://seraphixsystems.com/r/SX-07-A-0001, retrieved [date].","published":"2026-11-05"},"history":[{"filed":"2026-08-04","form":"10-Q","quote":"The Company also has a 300 MW data center in Wink, Texas that draws power from the power grid (the \"Black Pearl Facility\") that was previously used for bitcoin mining.","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000041/cifr-20260630.htm","publisher":"SEC EDGAR"},{"filed":"2026-02-24","form":"10-K","quote":"Our Black Pearl data center is our wholly-owned 300 MW facility located in Wink, Texas.","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm","publisher":"SEC EDGAR"},{"filed":"2026-02-24","form":"10-K","quote":"The Black Pearl Facility has received approvals for 300 MW of interconnection and has entered into agreements necessary to participate in the ERCOT market.","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm","publisher":"SEC EDGAR"},{"filed":"2026-02-24","form":"10-K","quote":"The Company and its wholly-owned subsidiary, Cipher Black Pearl LLC (\"Black Pearl\"), assumed a lease for an approximately 75 acre plot of land in Winkler County, Texas in December 2023, for the purpose of constructing a data center, and ancillary infrastructure to construct the Black Pearl Facility.","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm","publisher":"SEC EDGAR"},{"filed":"2026-02-24","form":"10-K","quote":"and a 300 MW data center in Wink, Texas that draws power from the power grid (the \"Black Pearl Facility\")","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm","publisher":"SEC EDGAR"}],"gate":{"passed":true,"hash_verified":true,"source":"intel pipeline gate"},"published":"2026-11-05"},{"id":"SX-07-A-0002","url":"https://seraphixsystems.com/r/SX-07-A-0002","json":"https://seraphixsystems.com/r/SX-07-A-0002.json","label":"RECORD SX 07-A // SITES // FILED 2026-11-02","scope":"entity","entity":{"cik":"0001819989","legal_name":"Cipher Digital Inc.","display_name":"Cipher Digital","url":"https://seraphixsystems.com/pilot-01/company/cipher-digital"},"state":null,"section":"sites","tag":"COMPANY DISCLOSURE","instrument":"SITE","primary_pending":false,"claim":"Barber Lake Facility -- 300 MW -- for Fluidstack USA II Inc. -- company expects phased commencement in Q4 2026","quote":"the 300 MW Barber Lake Facility for Fluidstack USA II Inc. (“Fluidstack”), expecting phased commencement in the fourth quarter of 2026","fields":{"location":"not stated in source","mw":300,"site":"Barber Lake Facility","state":null,"status":"under construction"},"basis":"regulator_hosted_filing","basis_label":"REGULATOR-HOSTED FILING","source":{"title":"Cipher Digital Inc. — 10-Q Note 1","locator":"10-Q Note 1, Nature of operations","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000050/cifr-20260930.htm"},"also":[],"primary":{"title":"Cipher Digital Inc. — 10-Q Note 1","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000050/cifr-20260930.htm"},"dates":{"occurred":null,"reported":null,"source_published":"2026-11-02","first_seen":null,"ingested":"2026-11-04","corrected":null},"record_date":"2026-11-02","lifecycle":"active","version":1,"versions":[{"version":1,"claim":"Barber Lake Facility -- 300 MW -- for Fluidstack USA II Inc. -- company expects phased commencement in Q4 2026","current":true,"url":"https://seraphixsystems.com/r/SX-07-A-0002/v1","json":"https://seraphixsystems.com/r/SX-07-A-0002/v1.json"}],"cite":{"publisher":"Seraphix Systems","record_id":"SX-07-A-0002","url":"https://seraphixsystems.com/r/SX-07-A-0002","version":1,"title":"RECORD SX 07-A // SITES // FILED 2026-11-02","text":"Seraphix Systems, \"SX-07-A-0002\", v1, https://seraphixsystems.com/r/SX-07-A-0002, retrieved [date].","published":"2026-11-05"},"expectation":"company-stated","history":[{"filed":"2026-02-24","form":"10-K","quote":"244 MW of gross capacity will be allocated to Fluidstack in Barber Lake Phase I","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm","publisher":"SEC EDGAR"},{"filed":"2026-02-24","form":"10-K","quote":"Cipher Barber Lake has received approvals for 300 MW of interconnection without any restrictions on the load profile and has entered into agreements necessary to participate in the Electric Reliability Council of Texas (\"ERCOT\") market.","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm","publisher":"SEC EDGAR"},{"filed":"2026-02-24","form":"10-K","quote":"and the remaining 56 MW will be allocated to Fluidstack in Barber Lake Phase II","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm","publisher":"SEC EDGAR"}],"gate":{"passed":true,"hash_verified":true,"source":"intel pipeline gate"},"published":"2026-11-05"},{"id":"SX-07-A-0003","url":"https://seraphixsystems.com/r/SX-07-A-0003","json":"https://seraphixsystems.com/r/SX-07-A-0003.json","label":"RECORD SX 07-A // SITES // FILED 2026-11-02","scope":"entity","entity":{"cik":"0001819989","legal_name":"Cipher Digital Inc.","display_name":"Cipher Digital","url":"https://seraphixsystems.com/pilot-01/company/cipher-digital"},"state":null,"section":"sites","tag":"COMPANY DISCLOSURE","instrument":"SITE","primary_pending":false,"claim":"Stingray Facility -- 100 MW -- company expects commencement in 2027","quote":"the 100 MW Stingray data center (the “Stingray Facility”) expecting commencement in 2027","fields":{"location":"not stated in source","mw":100,"site":"Stingray Facility","state":null,"status":"under construction"},"basis":"regulator_hosted_filing","basis_label":"REGULATOR-HOSTED FILING","source":{"title":"Cipher Digital Inc. — 10-Q Note 1","locator":"10-Q Note 1, Nature of operations","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000050/cifr-20260930.htm"},"also":[],"primary":{"title":"Cipher Digital Inc. — 10-Q Note 1","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000050/cifr-20260930.htm"},"dates":{"occurred":null,"reported":null,"source_published":"2026-11-02","first_seen":null,"ingested":"2026-11-04","corrected":null},"record_date":"2026-11-02","lifecycle":"active","version":1,"versions":[{"version":1,"claim":"Stingray Facility -- 100 MW -- company expects commencement in 2027","current":true,"url":"https://seraphixsystems.com/r/SX-07-A-0003/v1","json":"https://seraphixsystems.com/r/SX-07-A-0003/v1.json"}],"cite":{"publisher":"Seraphix Systems","record_id":"SX-07-A-0003","url":"https://seraphixsystems.com/r/SX-07-A-0003","version":1,"title":"RECORD SX 07-A // SITES // FILED 2026-11-02","text":"Seraphix Systems, \"SX-07-A-0003\", v1, https://seraphixsystems.com/r/SX-07-A-0003, retrieved [date].","published":"2026-11-05"},"expectation":"company-stated","history":[{"filed":"2026-02-24","form":"10-K","quote":"Our Stingray site (the \"Stingray Site\") is located in West Texas. The Stingray Site has conditional ERCOT interconnection approval of up to 100 MW.","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm","publisher":"SEC EDGAR"}],"gate":{"passed":true,"hash_verified":true,"source":"intel pipeline gate"},"published":"2026-11-05"},{"id":"SX-07-A-0004","url":"https://seraphixsystems.com/r/SX-07-A-0004","json":"https://seraphixsystems.com/r/SX-07-A-0004.json","label":"RECORD SX 07-A // SITES // FILED 2026-11-02","scope":"entity","entity":{"cik":"0001819989","legal_name":"Cipher Digital Inc.","display_name":"Cipher Digital","url":"https://seraphixsystems.com/pilot-01/company/cipher-digital"},"state":"TX","section":"sites","tag":"COMPANY DISCLOSURE","instrument":"SITE","primary_pending":false,"claim":"Odessa Facility -- 207 MW -- Odessa, Texas -- wholly owned bitcoin mining data center","quote":"The Company also operates one wholly owned bitcoin mining data center, a 207 MW site located in Odessa, Texas that draws fixed priced power from a power purchase agreement with its electricity provider (the “Odessa Facility”).","fields":{"location":"Odessa, Texas","mw":207,"site":"Odessa Facility","state":"TX","status":"operating (bitcoin mining)"},"basis":"regulator_hosted_filing","basis_label":"REGULATOR-HOSTED FILING","source":{"title":"Cipher Digital Inc. — 10-Q Note 1","locator":"10-Q Note 1, Nature of operations","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000050/cifr-20260930.htm"},"also":[],"primary":{"title":"Cipher Digital Inc. — 10-Q Note 1","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000050/cifr-20260930.htm"},"dates":{"occurred":null,"reported":null,"source_published":"2026-11-02","first_seen":null,"ingested":"2026-11-04","corrected":null},"record_date":"2026-11-02","lifecycle":"active","version":1,"versions":[{"version":1,"claim":"Odessa Facility -- 207 MW -- Odessa, Texas -- wholly owned bitcoin mining data center","current":true,"url":"https://seraphixsystems.com/r/SX-07-A-0004/v1","json":"https://seraphixsystems.com/r/SX-07-A-0004/v1.json"}],"cite":{"publisher":"Seraphix Systems","record_id":"SX-07-A-0004","url":"https://seraphixsystems.com/r/SX-07-A-0004","version":1,"title":"RECORD SX 07-A // SITES // FILED 2026-11-02","text":"Seraphix Systems, \"SX-07-A-0004\", v1, https://seraphixsystems.com/r/SX-07-A-0004, retrieved [date].","published":"2026-11-05"},"history":[{"filed":"2026-11-02","form":"10-Q","quote":"we currently operate approximately 207 MW of capacity at one bitcoin mining data center in Texas","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000050/cifr-20260930.htm","publisher":"SEC EDGAR"},{"filed":"2026-08-04","form":"10-Q","quote":"The Company operates one wholly owned bitcoin mining data center, a 207 MW site located in Odessa, Texas that draws fixed priced power from a power purchase agreement with its electricity provider (the \"Odessa Facility\").","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000041/cifr-20260630.htm","publisher":"SEC EDGAR"},{"filed":"2026-05-05","form":"10-Q","quote":"The Company operates one wholly-owned bitcoin mining data center, a 207 MW site located in Odessa, Texas that draws fixed priced power from a power purchase agreement with its electricity provider (the \"Odessa Facility\").","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000028/cifr-20260331.htm","publisher":"SEC EDGAR"},{"filed":"2026-02-24","form":"10-K","quote":"Our Odessa data center (the \"Odessa Facility\") is our wholly-owned 207 MW facility located in Odessa, Texas.","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm","publisher":"SEC EDGAR"},{"filed":"2026-02-24","form":"10-K","quote":"The Company operates two wholly-owned bitcoin mining data centers, a 207 MW site located in Odessa, Texas that draws fixed priced power from a power purchase agreement with its electricity provider (the \"Odessa Facility\") and a 300 MW data center in Wink, Texas that draws power from the power grid (the \"Black Pearl Facility\")","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm","publisher":"SEC EDGAR"},{"filed":"2026-02-24","form":"10-K","quote":"we currently operate approximately 207 MW of power at one bitcoin mining data center in Texas","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm","publisher":"SEC EDGAR"}],"gate":{"passed":true,"hash_verified":true,"source":"intel pipeline gate"},"published":"2026-11-05"},{"id":"SX-07-A-0005","url":"https://seraphixsystems.com/r/SX-07-A-0005","json":"https://seraphixsystems.com/r/SX-07-A-0005.json","label":"RECORD SX 07-A // SITES // FILED 2026-11-02","scope":"entity","entity":{"cik":"0001819989","legal_name":"Cipher Digital Inc.","display_name":"Cipher Digital","url":"https://seraphixsystems.com/pilot-01/company/cipher-digital"},"state":null,"section":"sites","tag":"COMPANY DISCLOSURE","instrument":"SITE","primary_pending":false,"claim":"Seven additional sites expected to be built out for HPC","quote":"The Company’s portfolio as of September 30, 2026 also consists of seven additional sites expected to be built out for HPC.","fields":{"location":"not stated in source","mw":null,"site":"7 additional sites","state":null,"status":"development"},"basis":"regulator_hosted_filing","basis_label":"REGULATOR-HOSTED FILING","source":{"title":"Cipher Digital Inc. — 10-Q Note 1","locator":"10-Q Note 1, Nature of operations","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000050/cifr-20260930.htm"},"also":[],"primary":{"title":"Cipher Digital Inc. — 10-Q Note 1","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000050/cifr-20260930.htm"},"dates":{"occurred":null,"reported":null,"source_published":"2026-11-02","first_seen":null,"ingested":"2026-11-04","corrected":null},"record_date":"2026-11-02","lifecycle":"active","version":1,"versions":[{"version":1,"claim":"Seven additional sites expected to be built out for HPC","current":true,"url":"https://seraphixsystems.com/r/SX-07-A-0005/v1","json":"https://seraphixsystems.com/r/SX-07-A-0005/v1.json"}],"cite":{"publisher":"Seraphix Systems","record_id":"SX-07-A-0005","url":"https://seraphixsystems.com/r/SX-07-A-0005","version":1,"title":"RECORD SX 07-A // SITES // FILED 2026-11-02","text":"Seraphix Systems, \"SX-07-A-0005\", v1, https://seraphixsystems.com/r/SX-07-A-0005, retrieved [date].","published":"2026-11-05"},"expectation":"company-stated","gate":{"passed":true,"hash_verified":true,"source":"intel pipeline gate"},"published":"2026-11-05"},{"id":"SX-07-A-0064","url":"https://seraphixsystems.com/r/SX-07-A-0064","json":"https://seraphixsystems.com/r/SX-07-A-0064.json","label":"RECORD SX 07-A // SITES // FILED 2026-11-02","scope":"entity","entity":{"cik":"0001819989","legal_name":"Cipher Digital Inc.","display_name":"Cipher Digital","url":"https://seraphixsystems.com/pilot-01/company/cipher-digital"},"state":"TX","section":"sites","tag":"COMPANY DISCLOSURE","instrument":"SITE","primary_pending":false,"claim":"Colchis Site -- Texas -- development (potential 1 GW site)","quote":"the Company purchased 53% of the equity in Colchis LLC (\"Colchis\"), a joint venture of a potential 1 GW site in Texas, the \"Colchis Site","fields":{"location":"Texas","mw":null,"site":"Colchis Site","state":"TX","status":"development (potential 1 GW site)"},"basis":"regulator_hosted_filing","basis_label":"REGULATOR-HOSTED FILING","source":{"title":"Cipher Digital Inc. — 10-Q Note 7. INVESTMENTS IN JOINT VENTURES (normalized-text offset 95222)","locator":"10-Q Note 7. INVESTMENTS IN JOINT VENTURES (normalized-text offset 95222)","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000050/cifr-20260930.htm"},"also":[],"primary":{"title":"Cipher Digital Inc. — 10-Q Note 7. INVESTMENTS IN JOINT VENTURES (normalized-text offset 95222)","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000050/cifr-20260930.htm"},"dates":{"occurred":null,"reported":null,"source_published":"2026-11-02","first_seen":null,"ingested":"2026-11-04","corrected":null},"record_date":"2026-11-02","lifecycle":"active","version":1,"versions":[{"version":1,"claim":"Colchis Site -- Texas -- development (potential 1 GW site)","current":true,"url":"https://seraphixsystems.com/r/SX-07-A-0064/v1","json":"https://seraphixsystems.com/r/SX-07-A-0064/v1.json"}],"cite":{"publisher":"Seraphix Systems","record_id":"SX-07-A-0064","url":"https://seraphixsystems.com/r/SX-07-A-0064","version":1,"title":"RECORD SX 07-A // SITES // FILED 2026-11-02","text":"Seraphix Systems, \"SX-07-A-0064\", v1, https://seraphixsystems.com/r/SX-07-A-0064, retrieved [date].","published":"2026-11-05"},"history":[{"filed":"2026-02-24","form":"10-K","quote":"In October 2025, the Company purchased 53% of the equity in Colchis LLC (\"Colchis\"), a joint venture of a potential 1 GW site in Texas, the \"Colchis Site.","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm","publisher":"SEC EDGAR"}],"gate":{"passed":true,"hash_verified":true,"source":"intel pipeline gate"},"published":"2026-11-05"},{"id":"SX-07-A-0316","url":"https://seraphixsystems.com/r/SX-07-A-0316","json":"https://seraphixsystems.com/r/SX-07-A-0316.json","label":"RECORD SX 07-A // SITES // FILED 2026-02-24","scope":"entity","entity":{"cik":"0001819989","legal_name":"Cipher Digital Inc.","display_name":"Cipher Digital","url":"https://seraphixsystems.com/pilot-01/company/cipher-digital"},"state":"OH","section":"sites","tag":"COMPANY DISCLOSURE","instrument":"SITE","primary_pending":false,"claim":"Ulysses Site -- 200 MW -- Ohio -- development (acquired a 200 MW data center site in Ohio)","quote":"we acquired a 200 MW data center site in Ohio, referred to as Ulysses (the \"Ulysses Site\")","fields":{"location":"Ohio","mw":200,"site":"Ulysses Site","state":"OH","status":"development (acquired a 200 MW data center site in Ohio)"},"basis":"regulator_hosted_filing","basis_label":"REGULATOR-HOSTED FILING","source":{"title":"Cipher Digital Inc. — 10-K Item 1. Business (normalized-text offset 47587)","locator":"10-K Item 1. Business (normalized-text offset 47587)","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm"},"also":[],"primary":{"title":"Cipher Digital Inc. — 10-K Item 1. Business (normalized-text offset 47587)","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm"},"dates":{"occurred":null,"reported":null,"source_published":"2026-02-24","first_seen":null,"ingested":"2026-11-04","corrected":null},"record_date":"2026-02-24","lifecycle":"active","version":1,"versions":[{"version":1,"claim":"Ulysses Site -- 200 MW -- Ohio -- development (acquired a 200 MW data center site in Ohio)","current":true,"url":"https://seraphixsystems.com/r/SX-07-A-0316/v1","json":"https://seraphixsystems.com/r/SX-07-A-0316/v1.json"}],"cite":{"publisher":"Seraphix Systems","record_id":"SX-07-A-0316","url":"https://seraphixsystems.com/r/SX-07-A-0316","version":1,"title":"RECORD SX 07-A // SITES // FILED 2026-02-24","text":"Seraphix Systems, \"SX-07-A-0316\", v1, https://seraphixsystems.com/r/SX-07-A-0316, retrieved [date].","published":"2026-11-05"},"gate":{"passed":true,"hash_verified":true,"source":"intel pipeline gate"},"published":"2026-11-05"},{"id":"SX-07-A-0319","url":"https://seraphixsystems.com/r/SX-07-A-0319","json":"https://seraphixsystems.com/r/SX-07-A-0319.json","label":"RECORD SX 07-A // SITES // FILED 2026-02-24","scope":"entity","entity":{"cik":"0001819989","legal_name":"Cipher Digital Inc.","display_name":"Cipher Digital","url":"https://seraphixsystems.com/pilot-01/company/cipher-digital"},"state":"TX","section":"sites","tag":"COMPANY DISCLOSURE","instrument":"SITE","primary_pending":false,"claim":"McLennan Site -- 500 MW -- central Texas -- development (estimated energization in 2028)","quote":"referred to as McLennan (the \"McLennan Site\"), located in central Texas. The McLennan Site has targeted capacity of up to 500 MW and estimated energization in 2028","fields":{"location":"central Texas","mw":500,"site":"McLennan Site","state":"TX","status":"development (estimated energization in 2028)"},"basis":"regulator_hosted_filing","basis_label":"REGULATOR-HOSTED FILING","source":{"title":"Cipher Digital Inc. — 10-K Item 1. Business (normalized-text offset 49188)","locator":"10-K Item 1. Business (normalized-text offset 49188)","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm"},"also":[],"primary":{"title":"Cipher Digital Inc. — 10-K Item 1. Business (normalized-text offset 49188)","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm"},"dates":{"occurred":null,"reported":null,"source_published":"2026-02-24","first_seen":null,"ingested":"2026-11-04","corrected":null},"record_date":"2026-02-24","lifecycle":"active","version":1,"versions":[{"version":1,"claim":"McLennan Site -- 500 MW -- central Texas -- development (estimated energization in 2028)","current":true,"url":"https://seraphixsystems.com/r/SX-07-A-0319/v1","json":"https://seraphixsystems.com/r/SX-07-A-0319/v1.json"}],"cite":{"publisher":"Seraphix Systems","record_id":"SX-07-A-0319","url":"https://seraphixsystems.com/r/SX-07-A-0319","version":1,"title":"RECORD SX 07-A // SITES // FILED 2026-02-24","text":"Seraphix Systems, \"SX-07-A-0319\", v1, https://seraphixsystems.com/r/SX-07-A-0319, retrieved [date].","published":"2026-11-05"},"expectation":"company-stated","gate":{"passed":true,"hash_verified":true,"source":"intel pipeline gate"},"published":"2026-11-05"},{"id":"SX-07-A-0320","url":"https://seraphixsystems.com/r/SX-07-A-0320","json":"https://seraphixsystems.com/r/SX-07-A-0320.json","label":"RECORD SX 07-A // SITES // FILED 2026-02-24","scope":"entity","entity":{"cik":"0001819989","legal_name":"Cipher Digital Inc.","display_name":"Cipher Digital","url":"https://seraphixsystems.com/pilot-01/company/cipher-digital"},"state":"TX","section":"sites","tag":"COMPANY DISCLOSURE","instrument":"SITE","primary_pending":false,"claim":"Mikeska Site -- 500 MW -- West Texas -- development (estimated energization in 2028)","quote":"referred to as Mikeska (the \"Mikeska Site\"), located in West Texas. The Mikeska Site has targeted capacity of up to 500 MW and estimated energization in 2028","fields":{"location":"West Texas","mw":500,"site":"Mikeska Site","state":"TX","status":"development (estimated energization in 2028)"},"basis":"regulator_hosted_filing","basis_label":"REGULATOR-HOSTED FILING","source":{"title":"Cipher Digital Inc. — 10-K Item 1. Business (normalized-text offset 49763)","locator":"10-K Item 1. Business (normalized-text offset 49763)","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm"},"also":[],"primary":{"title":"Cipher Digital Inc. — 10-K Item 1. Business (normalized-text offset 49763)","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm"},"dates":{"occurred":null,"reported":null,"source_published":"2026-02-24","first_seen":null,"ingested":"2026-11-04","corrected":null},"record_date":"2026-02-24","lifecycle":"active","version":1,"versions":[{"version":1,"claim":"Mikeska Site -- 500 MW -- West Texas -- development (estimated energization in 2028)","current":true,"url":"https://seraphixsystems.com/r/SX-07-A-0320/v1","json":"https://seraphixsystems.com/r/SX-07-A-0320/v1.json"}],"cite":{"publisher":"Seraphix Systems","record_id":"SX-07-A-0320","url":"https://seraphixsystems.com/r/SX-07-A-0320","version":1,"title":"RECORD SX 07-A // SITES // FILED 2026-02-24","text":"Seraphix Systems, \"SX-07-A-0320\", v1, https://seraphixsystems.com/r/SX-07-A-0320, retrieved [date].","published":"2026-11-05"},"expectation":"company-stated","gate":{"passed":true,"hash_verified":true,"source":"intel pipeline gate"},"published":"2026-11-05"},{"id":"SX-07-A-0321","url":"https://seraphixsystems.com/r/SX-07-A-0321","json":"https://seraphixsystems.com/r/SX-07-A-0321.json","label":"RECORD SX 07-A // SITES // FILED 2026-02-24","scope":"entity","entity":{"cik":"0001819989","legal_name":"Cipher Digital Inc.","display_name":"Cipher Digital","url":"https://seraphixsystems.com/pilot-01/company/cipher-digital"},"state":"TX","section":"sites","tag":"COMPANY DISCLOSURE","instrument":"SITE","primary_pending":false,"claim":"Milsing Site -- 500 MW -- East Texas -- development (estimated energization between 2028 and 2029)","quote":"referred to as Milsing (the \"Milsing Site\"), located in East Texas. The Milsing Site has targeted capacity of up to 500 MW and estimated energization between 2028 and 2029","fields":{"location":"East Texas","mw":500,"site":"Milsing Site","state":"TX","status":"development (estimated energization between 2028 and 2029)"},"basis":"regulator_hosted_filing","basis_label":"REGULATOR-HOSTED FILING","source":{"title":"Cipher Digital Inc. — 10-K Item 1. Business (normalized-text offset 50240)","locator":"10-K Item 1. Business (normalized-text offset 50240)","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm"},"also":[],"primary":{"title":"Cipher Digital Inc. — 10-K Item 1. Business (normalized-text offset 50240)","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm"},"dates":{"occurred":null,"reported":null,"source_published":"2026-02-24","first_seen":null,"ingested":"2026-11-04","corrected":null},"record_date":"2026-02-24","lifecycle":"active","version":1,"versions":[{"version":1,"claim":"Milsing Site -- 500 MW -- East Texas -- development (estimated energization between 2028 and 2029)","current":true,"url":"https://seraphixsystems.com/r/SX-07-A-0321/v1","json":"https://seraphixsystems.com/r/SX-07-A-0321/v1.json"}],"cite":{"publisher":"Seraphix Systems","record_id":"SX-07-A-0321","url":"https://seraphixsystems.com/r/SX-07-A-0321","version":1,"title":"RECORD SX 07-A // SITES // FILED 2026-02-24","text":"Seraphix Systems, \"SX-07-A-0321\", v1, https://seraphixsystems.com/r/SX-07-A-0321, retrieved [date].","published":"2026-11-05"},"expectation":"company-stated","gate":{"passed":true,"hash_verified":true,"source":"intel pipeline gate"},"published":"2026-11-05"},{"id":"SX-07-A-0489","url":"https://seraphixsystems.com/r/SX-07-A-0489","json":"https://seraphixsystems.com/r/SX-07-A-0489.json","label":"RECORD SX 07-A // SITES // FILED 2026-11-02","scope":"entity","entity":{"cik":"0001819989","legal_name":"Cipher Digital Inc.","display_name":"Cipher Digital","url":"https://seraphixsystems.com/pilot-01/company/cipher-digital"},"state":"TX","section":"sites","tag":"COMPANY DISCLOSURE","instrument":"company-stated","primary_pending":false,"claim":"1 additional HPC data center facility under a March 2026 hyperscaler lease at one of the Company's existing sites in Texas; phased delivery expected to begin in 2027 (10-Q Note 12, filed 2026-11-02)","quote":"In March 2026, the Company, through a wholly owned subsidiary, entered into a data center lease agreement with an investment grade hyperscaler tenant for the development, construction and lease of an additional HPC data center facility at one of the Company's existing sites in Texas. The initial term of the lease is 15 years, with multiple extension options at the tenant's election. The Company is responsible for construction of the facility, with phased delivery expected to begin in 2027.","fields":{"level":"company","location":"Texas","mw":null,"site":null,"site_count":1,"state":"TX","status":"development, construction and lease (phased delivery expected to begin in 2027)"},"basis":"regulator_hosted_filing","basis_label":"REGULATOR-HOSTED FILING","source":{"title":"Cipher Digital Inc. — 10-Q Note 12. LEASES (normalized-text offset 102871)","locator":"10-Q Note 12. LEASES (normalized-text offset 102871)","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000050/cifr-20260930.htm"},"also":[],"primary":{"title":"Cipher Digital Inc. — 10-Q Note 12. LEASES (normalized-text offset 102871)","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000050/cifr-20260930.htm"},"dates":{"occurred":null,"reported":null,"source_published":"2026-11-02","first_seen":null,"ingested":"2026-11-04","corrected":null},"record_date":"2026-11-02","lifecycle":"active","version":1,"versions":[{"version":1,"claim":"1 additional HPC data center facility under a March 2026 hyperscaler lease at one of the Company's existing sites in Texas; phased delivery expected to begin in 2027 (10-Q Note 12, filed 2026-11-02)","current":true,"url":"https://seraphixsystems.com/r/SX-07-A-0489/v1","json":"https://seraphixsystems.com/r/SX-07-A-0489/v1.json"}],"cite":{"publisher":"Seraphix Systems","record_id":"SX-07-A-0489","url":"https://seraphixsystems.com/r/SX-07-A-0489","version":1,"title":"RECORD SX 07-A // SITES // FILED 2026-11-02","text":"Seraphix Systems, \"SX-07-A-0489\", v1, https://seraphixsystems.com/r/SX-07-A-0489, retrieved [date].","published":"2026-11-05"},"history":[{"filed":"2026-08-04","form":"10-Q","quote":"the development, construction, and lease of an additional HPC data center facility at one of the Company's existing sites in Texas","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000041/cifr-20260630.htm","publisher":"SEC EDGAR"},{"filed":"2026-05-05","form":"10-Q","quote":"the development, construction, and lease of an additional HPC data center facility at one of the Company's existing sites in Texas","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000028/cifr-20260331.htm","publisher":"SEC EDGAR"}],"gate":{"passed":true,"hash_verified":true,"source":"intel pipeline gate"},"published":"2026-11-05"},{"id":"SX-07-A-0490","url":"https://seraphixsystems.com/r/SX-07-A-0490","json":"https://seraphixsystems.com/r/SX-07-A-0490.json","label":"RECORD SX 07-A // SITES // FILED 2026-11-02","scope":"entity","entity":{"cik":"0001819989","legal_name":"Cipher Digital Inc.","display_name":"Cipher Digital","url":"https://seraphixsystems.com/pilot-01/company/cipher-digital"},"state":"TX","section":"sites","tag":"COMPANY DISCLOSURE","instrument":"SITE","primary_pending":false,"claim":"Reveille Facility -- LaSalle, Texas -- land lease (up to 52 acres) assumed October 2024 for the purpose of constructing a data center","quote":"The Company, through its wholly owned subsidiary, Cipher Reveille LLC, assumed a lease for up to 52 acres of land in LaSalle, Texas, in October 2024 for the purpose of constructing a data center, and ancillary infrastructure.","fields":{"location":"LaSalle, Texas","mw":null,"site":"Reveille Facility","state":"TX","status":"land lease assumed October 2024 for the purpose of constructing a data center"},"basis":"regulator_hosted_filing","basis_label":"REGULATOR-HOSTED FILING","source":{"title":"Cipher Digital Inc. — 10-Q Note 12. LEASES (normalized-text offset 107606)","locator":"10-Q Note 12. LEASES (normalized-text offset 107606)","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000050/cifr-20260930.htm"},"also":[],"primary":{"title":"Cipher Digital Inc. — 10-Q Note 12. LEASES (normalized-text offset 107606)","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000050/cifr-20260930.htm"},"dates":{"occurred":null,"reported":null,"source_published":"2026-11-02","first_seen":null,"ingested":"2026-11-04","corrected":null},"record_date":"2026-11-02","lifecycle":"active","version":1,"versions":[{"version":1,"claim":"Reveille Facility -- LaSalle, Texas -- land lease (up to 52 acres) assumed October 2024 for the purpose of constructing a data center","current":true,"url":"https://seraphixsystems.com/r/SX-07-A-0490/v1","json":"https://seraphixsystems.com/r/SX-07-A-0490/v1.json"}],"cite":{"publisher":"Seraphix Systems","record_id":"SX-07-A-0490","url":"https://seraphixsystems.com/r/SX-07-A-0490","version":1,"title":"RECORD SX 07-A // SITES // FILED 2026-11-02","text":"Seraphix Systems, \"SX-07-A-0490\", v1, https://seraphixsystems.com/r/SX-07-A-0490, retrieved [date].","published":"2026-11-05"},"history":[{"filed":"2026-08-04","form":"10-Q","quote":"The Company and its wholly owned subsidiary, Cipher Reveille LLC (\"Reveille\"), assumed a lease for up to 52 acres of land in LaSalle, Texas, in October 2024 for the purpose of constructing a data center, and ancillary infrastructure to construct the Reveille Facility.","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000041/cifr-20260630.htm","publisher":"SEC EDGAR"},{"filed":"2026-05-05","form":"10-Q","quote":"The Company and its wholly-owned subsidiary, Cipher Reveille LLC (\"Reveille\"), assumed a lease for up to 52 acres of land in LaSalle, Texas, in October 2024 for the purpose of constructing a data center, and ancillary infrastructure to construct the Reveille Facility.","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000028/cifr-20260331.htm","publisher":"SEC EDGAR"},{"filed":"2026-02-24","form":"10-K","quote":"Our Reveille site (\"Reveille\" or the \"Reveille Site\") is located in Cotulla, Texas. The Reveille Site has ERCOT interconnection approval of up to 70 MW, with the possibility for expansion.","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm","publisher":"SEC EDGAR"},{"filed":"2026-02-24","form":"10-K","quote":"a wholly-owned site in LaSalle, Texas (the \"Reveille Facility\")","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm","publisher":"SEC EDGAR"}],"gate":{"passed":true,"hash_verified":true,"source":"intel pipeline gate"},"published":"2026-11-05"},{"id":"SX-07-A-0491","url":"https://seraphixsystems.com/r/SX-07-A-0491","json":"https://seraphixsystems.com/r/SX-07-A-0491.json","label":"RECORD SX 07-A // SITES // FILED 2026-11-02","scope":"entity","entity":{"cik":"0001819989","legal_name":"Cipher Digital Inc.","display_name":"Cipher Digital","url":"https://seraphixsystems.com/pilot-01/company/cipher-digital"},"state":null,"section":"sites","tag":"COMPANY DISCLOSURE","instrument":"company-stated","primary_pending":false,"claim":"Currently developing 700 MW of HPC data center facilities across three sites for hyperscaler tenants (10-Q MD&A, filed 2026-11-02)","quote":"We are currently developing 700 MW of HPC data center facilities across three sites for hyperscaler tenants","fields":{"level":"company","location":"not stated in source","mw":700,"site":null,"site_count":3,"state":null,"status":"currently developing (for hyperscaler tenants)"},"basis":"regulator_hosted_filing","basis_label":"REGULATOR-HOSTED FILING","source":{"title":"Cipher Digital Inc. — 10-Q Item 2. Management's Discussion and Analysis of Financial Condition and Results of Operations (normalized-text offset 171482)","locator":"10-Q Item 2. Management's Discussion and Analysis of Financial Condition and Results of Operations (normalized-text offset 171482)","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000050/cifr-20260930.htm"},"also":[],"primary":{"title":"Cipher Digital Inc. — 10-Q Item 2. Management's Discussion and Analysis of Financial Condition and Results of Operations (normalized-text offset 171482)","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000050/cifr-20260930.htm"},"dates":{"occurred":null,"reported":null,"source_published":"2026-11-02","first_seen":null,"ingested":"2026-11-04","corrected":null},"record_date":"2026-11-02","lifecycle":"active","version":1,"versions":[{"version":1,"claim":"Currently developing 700 MW of HPC data center facilities across three sites for hyperscaler tenants (10-Q MD&A, filed 2026-11-02)","current":true,"url":"https://seraphixsystems.com/r/SX-07-A-0491/v1","json":"https://seraphixsystems.com/r/SX-07-A-0491/v1.json"}],"cite":{"publisher":"Seraphix Systems","record_id":"SX-07-A-0491","url":"https://seraphixsystems.com/r/SX-07-A-0491","version":1,"title":"RECORD SX 07-A // SITES // FILED 2026-11-02","text":"Seraphix Systems, \"SX-07-A-0491\", v1, https://seraphixsystems.com/r/SX-07-A-0491, retrieved [date].","published":"2026-11-05"},"history":[{"filed":"2026-02-24","form":"10-K","quote":"We are currently developing 600 MW of HPC data center facilities across two sites for hyperscaler tenants","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm","publisher":"SEC EDGAR"},{"filed":"2026-02-24","form":"10-K","quote":"We are currently developing 600 megawatts (\"MW\") of HPC data center facilities across two sites for hyperscaler tenants","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm","publisher":"SEC EDGAR"}],"gate":{"passed":true,"hash_verified":true,"source":"intel pipeline gate"},"published":"2026-11-05"},{"id":"SX-07-A-0492","url":"https://seraphixsystems.com/r/SX-07-A-0492","json":"https://seraphixsystems.com/r/SX-07-A-0492.json","label":"RECORD SX 07-A // SITES // FILED 2026-11-02","scope":"entity","entity":{"cik":"0001819989","legal_name":"Cipher Digital Inc.","display_name":"Cipher Digital","url":"https://seraphixsystems.com/pilot-01/company/cipher-digital"},"state":null,"section":"sites","tag":"COMPANY DISCLOSURE","instrument":"company-stated","primary_pending":false,"claim":"Grid pipeline of approximately 3.4 GW across six sites in Texas and one additional site in Ohio (10-Q MD&A, filed 2026-11-02)","quote":"We also maintain a grid pipeline of approximately 3.4 GW across six sites in Texas and one additional site in Ohio.","fields":{"level":"company","location":"Texas; Ohio","mw":null,"site":null,"site_count":{"Ohio":1,"Texas":6},"state":null,"status":"grid pipeline"},"basis":"regulator_hosted_filing","basis_label":"REGULATOR-HOSTED FILING","source":{"title":"Cipher Digital Inc. — 10-Q Item 2. Management's Discussion and Analysis of Financial Condition and Results of Operations (normalized-text offset 171693)","locator":"10-Q Item 2. Management's Discussion and Analysis of Financial Condition and Results of Operations (normalized-text offset 171693)","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000050/cifr-20260930.htm"},"also":[],"primary":{"title":"Cipher Digital Inc. — 10-Q Item 2. Management's Discussion and Analysis of Financial Condition and Results of Operations (normalized-text offset 171693)","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000050/cifr-20260930.htm"},"dates":{"occurred":null,"reported":null,"source_published":"2026-11-02","first_seen":null,"ingested":"2026-11-04","corrected":null},"record_date":"2026-11-02","lifecycle":"active","version":1,"versions":[{"version":1,"claim":"Grid pipeline of approximately 3.4 GW across six sites in Texas and one additional site in Ohio (10-Q MD&A, filed 2026-11-02)","current":true,"url":"https://seraphixsystems.com/r/SX-07-A-0492/v1","json":"https://seraphixsystems.com/r/SX-07-A-0492/v1.json"}],"cite":{"publisher":"Seraphix Systems","record_id":"SX-07-A-0492","url":"https://seraphixsystems.com/r/SX-07-A-0492","version":1,"title":"RECORD SX 07-A // SITES // FILED 2026-11-02","text":"Seraphix Systems, \"SX-07-A-0492\", v1, https://seraphixsystems.com/r/SX-07-A-0492, retrieved [date].","published":"2026-11-05"},"history":[{"filed":"2026-11-02","form":"10-Q","quote":"and one additional site in Ohio","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000050/cifr-20260930.htm","publisher":"SEC EDGAR"},{"filed":"2026-08-04","form":"10-Q","quote":"We also maintain a pipeline of approximately 4.4 GW across seven sites in Texas","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000041/cifr-20260630.htm","publisher":"SEC EDGAR"},{"filed":"2026-05-05","form":"10-Q","quote":"We also maintain a pipeline of approximately 3.3 GW across six sites in Texas","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000028/cifr-20260331.htm","publisher":"SEC EDGAR"},{"filed":"2026-02-24","form":"10-K","quote":"We also maintain a pipeline of approximately 3.4 GW across seven sites in Texas","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm","publisher":"SEC EDGAR"}],"gate":{"passed":true,"hash_verified":true,"source":"intel pipeline gate"},"published":"2026-11-05"},{"id":"SX-07-A-0503","url":"https://seraphixsystems.com/r/SX-07-A-0503","json":"https://seraphixsystems.com/r/SX-07-A-0503.json","label":"RECORD SX 07-A // SITES // FILED 2026-08-04","scope":"entity","entity":{"cik":"0001819989","legal_name":"Cipher Digital Inc.","display_name":"Cipher Digital","url":"https://seraphixsystems.com/pilot-01/company/cipher-digital"},"state":"TX","section":"sites","tag":"COMPANY DISCLOSURE","instrument":"company-stated","primary_pending":false,"claim":"Option agreement (July 23, 2026) to acquire a 900 MW site in Texas (10-Q, filed 2026-08-04)","quote":"On July 23, 2026, we entered into an option agreement to acquire a 900 MW site in Texas.","fields":{"level":"company","location":"Texas","mw":900,"site":null,"site_count":1,"state":"TX","status":"option agreement to acquire (July 23, 2026)"},"basis":"regulator_hosted_filing","basis_label":"REGULATOR-HOSTED FILING","source":{"title":"Cipher Digital Inc. — 10-Q Item 2. Management's Discussion and Analysis of Financial Condition and Results of Operations (normalized-text offset 154831)","locator":"10-Q Item 2. Management's Discussion and Analysis of Financial Condition and Results of Operations (normalized-text offset 154831)","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000041/cifr-20260630.htm"},"also":[],"primary":{"title":"Cipher Digital Inc. — 10-Q Item 2. Management's Discussion and Analysis of Financial Condition and Results of Operations (normalized-text offset 154831)","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000041/cifr-20260630.htm"},"dates":{"occurred":null,"reported":null,"source_published":"2026-08-04","first_seen":null,"ingested":"2026-11-04","corrected":null},"record_date":"2026-08-04","lifecycle":"active","version":1,"versions":[{"version":1,"claim":"Option agreement (July 23, 2026) to acquire a 900 MW site in Texas (10-Q, filed 2026-08-04)","current":true,"url":"https://seraphixsystems.com/r/SX-07-A-0503/v1","json":"https://seraphixsystems.com/r/SX-07-A-0503/v1.json"}],"cite":{"publisher":"Seraphix Systems","record_id":"SX-07-A-0503","url":"https://seraphixsystems.com/r/SX-07-A-0503","version":1,"title":"RECORD SX 07-A // SITES // FILED 2026-08-04","text":"Seraphix Systems, \"SX-07-A-0503\", v1, https://seraphixsystems.com/r/SX-07-A-0503, retrieved [date].","published":"2026-11-05"},"history":[{"filed":"2026-08-04","form":"10-Q","quote":"the Company entered into an option agreement to acquire a 900 MW site in Texas","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000041/cifr-20260630.htm","publisher":"SEC EDGAR"}],"gate":{"passed":true,"hash_verified":true,"source":"intel pipeline gate"},"published":"2026-11-05"},{"id":"SX-07-A-0514","url":"https://seraphixsystems.com/r/SX-07-A-0514","json":"https://seraphixsystems.com/r/SX-07-A-0514.json","label":"RECORD SX 07-A // SITES // FILED 2026-02-24","scope":"entity","entity":{"cik":"0001819989","legal_name":"Cipher Digital Inc.","display_name":"Cipher Digital","url":"https://seraphixsystems.com/pilot-01/company/cipher-digital"},"state":null,"section":"sites","tag":"COMPANY DISCLOSURE","instrument":"SITE","primary_pending":false,"claim":"Alborz Facility -- 40 MW bitcoin mining data center (WindHQ JV) -- 49% equity interest held from 2022; interest sold February 19, 2026","quote":"WindHQ Joint Venture (\"JV\") Sites From 2022 through February 2026, we had 49% equity interests in three 40 MW bitcoin mining data centers, each of which was partially-owned through a joint venture with WindHQ LLC (\"WindHQ\"); the Alborz data center (the \"Alborz Facility\"), the Bear data center (the \"Bear Facility\"), and the Chief data center (the \"Chief Facility\"). We had a 49% membership interest in Alborz LLC, which owns the Alborz Facility, a 49% membership interest in Bear LLC, which owns the Bear Facility, and a 49% membership interest in Chief Mountain LLC, which owns the Chief Facility. On February 19, 2026, we sold our 49% interests in our WindHQ JV sites to Canaan U.S. Inc.","fields":{"location":"not stated in source","mw":40,"site":"Alborz Facility","state":null,"status":"49% JV equity interest held 2022 through February 2026; sold February 19, 2026"},"basis":"regulator_hosted_filing","basis_label":"REGULATOR-HOSTED FILING","source":{"title":"Cipher Digital Inc. — 10-K Item 1. Business (normalized-text offset 52021)","locator":"10-K Item 1. Business (normalized-text offset 52021)","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm"},"also":[],"primary":{"title":"Cipher Digital Inc. — 10-K Item 1. Business (normalized-text offset 52021)","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm"},"dates":{"occurred":null,"reported":null,"source_published":"2026-02-24","first_seen":null,"ingested":"2026-11-04","corrected":null},"record_date":"2026-02-24","lifecycle":"active","version":1,"versions":[{"version":1,"claim":"Alborz Facility -- 40 MW bitcoin mining data center (WindHQ JV) -- 49% equity interest held from 2022; interest sold February 19, 2026","current":true,"url":"https://seraphixsystems.com/r/SX-07-A-0514/v1","json":"https://seraphixsystems.com/r/SX-07-A-0514/v1.json"}],"cite":{"publisher":"Seraphix Systems","record_id":"SX-07-A-0514","url":"https://seraphixsystems.com/r/SX-07-A-0514","version":1,"title":"RECORD SX 07-A // SITES // FILED 2026-02-24","text":"Seraphix Systems, \"SX-07-A-0514\", v1, https://seraphixsystems.com/r/SX-07-A-0514, retrieved [date].","published":"2026-11-05"},"gate":{"passed":true,"hash_verified":true,"source":"intel pipeline gate"},"published":"2026-11-05"},{"id":"SX-07-A-0515","url":"https://seraphixsystems.com/r/SX-07-A-0515","json":"https://seraphixsystems.com/r/SX-07-A-0515.json","label":"RECORD SX 07-A // SITES // FILED 2026-02-24","scope":"entity","entity":{"cik":"0001819989","legal_name":"Cipher Digital Inc.","display_name":"Cipher Digital","url":"https://seraphixsystems.com/pilot-01/company/cipher-digital"},"state":null,"section":"sites","tag":"COMPANY DISCLOSURE","instrument":"SITE","primary_pending":false,"claim":"Bear Facility -- 40 MW bitcoin mining data center (WindHQ JV) -- 49% equity interest held from 2022; interest sold February 19, 2026","quote":"WindHQ Joint Venture (\"JV\") Sites From 2022 through February 2026, we had 49% equity interests in three 40 MW bitcoin mining data centers, each of which was partially-owned through a joint venture with WindHQ LLC (\"WindHQ\"); the Alborz data center (the \"Alborz Facility\"), the Bear data center (the \"Bear Facility\"), and the Chief data center (the \"Chief Facility\"). We had a 49% membership interest in Alborz LLC, which owns the Alborz Facility, a 49% membership interest in Bear LLC, which owns the Bear Facility, and a 49% membership interest in Chief Mountain LLC, which owns the Chief Facility. On February 19, 2026, we sold our 49% interests in our WindHQ JV sites to Canaan U.S. Inc.","fields":{"location":"not stated in source","mw":40,"site":"Bear Facility","state":null,"status":"49% JV equity interest held 2022 through February 2026; sold February 19, 2026"},"basis":"regulator_hosted_filing","basis_label":"REGULATOR-HOSTED FILING","source":{"title":"Cipher Digital Inc. — 10-K Item 1. Business (normalized-text offset 52021)","locator":"10-K Item 1. Business (normalized-text offset 52021)","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm"},"also":[],"primary":{"title":"Cipher Digital Inc. — 10-K Item 1. Business (normalized-text offset 52021)","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm"},"dates":{"occurred":null,"reported":null,"source_published":"2026-02-24","first_seen":null,"ingested":"2026-11-04","corrected":null},"record_date":"2026-02-24","lifecycle":"active","version":1,"versions":[{"version":1,"claim":"Bear Facility -- 40 MW bitcoin mining data center (WindHQ JV) -- 49% equity interest held from 2022; interest sold February 19, 2026","current":true,"url":"https://seraphixsystems.com/r/SX-07-A-0515/v1","json":"https://seraphixsystems.com/r/SX-07-A-0515/v1.json"}],"cite":{"publisher":"Seraphix Systems","record_id":"SX-07-A-0515","url":"https://seraphixsystems.com/r/SX-07-A-0515","version":1,"title":"RECORD SX 07-A // SITES // FILED 2026-02-24","text":"Seraphix Systems, \"SX-07-A-0515\", v1, https://seraphixsystems.com/r/SX-07-A-0515, retrieved [date].","published":"2026-11-05"},"gate":{"passed":true,"hash_verified":true,"source":"intel pipeline gate"},"published":"2026-11-05"},{"id":"SX-07-A-0516","url":"https://seraphixsystems.com/r/SX-07-A-0516","json":"https://seraphixsystems.com/r/SX-07-A-0516.json","label":"RECORD SX 07-A // SITES // FILED 2026-02-24","scope":"entity","entity":{"cik":"0001819989","legal_name":"Cipher Digital Inc.","display_name":"Cipher Digital","url":"https://seraphixsystems.com/pilot-01/company/cipher-digital"},"state":null,"section":"sites","tag":"COMPANY DISCLOSURE","instrument":"SITE","primary_pending":false,"claim":"Chief Facility -- 40 MW bitcoin mining data center (WindHQ JV) -- 49% equity interest held from 2022; interest sold February 19, 2026","quote":"WindHQ Joint Venture (\"JV\") Sites From 2022 through February 2026, we had 49% equity interests in three 40 MW bitcoin mining data centers, each of which was partially-owned through a joint venture with WindHQ LLC (\"WindHQ\"); the Alborz data center (the \"Alborz Facility\"), the Bear data center (the \"Bear Facility\"), and the Chief data center (the \"Chief Facility\"). We had a 49% membership interest in Alborz LLC, which owns the Alborz Facility, a 49% membership interest in Bear LLC, which owns the Bear Facility, and a 49% membership interest in Chief Mountain LLC, which owns the Chief Facility. On February 19, 2026, we sold our 49% interests in our WindHQ JV sites to Canaan U.S. Inc.","fields":{"location":"not stated in source","mw":40,"site":"Chief Facility","state":null,"status":"49% JV equity interest held 2022 through February 2026; sold February 19, 2026"},"basis":"regulator_hosted_filing","basis_label":"REGULATOR-HOSTED FILING","source":{"title":"Cipher Digital Inc. — 10-K Item 1. Business (normalized-text offset 52021)","locator":"10-K Item 1. Business (normalized-text offset 52021)","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm"},"also":[],"primary":{"title":"Cipher Digital Inc. — 10-K Item 1. Business (normalized-text offset 52021)","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm"},"dates":{"occurred":null,"reported":null,"source_published":"2026-02-24","first_seen":null,"ingested":"2026-11-04","corrected":null},"record_date":"2026-02-24","lifecycle":"active","version":1,"versions":[{"version":1,"claim":"Chief Facility -- 40 MW bitcoin mining data center (WindHQ JV) -- 49% equity interest held from 2022; interest sold February 19, 2026","current":true,"url":"https://seraphixsystems.com/r/SX-07-A-0516/v1","json":"https://seraphixsystems.com/r/SX-07-A-0516/v1.json"}],"cite":{"publisher":"Seraphix Systems","record_id":"SX-07-A-0516","url":"https://seraphixsystems.com/r/SX-07-A-0516","version":1,"title":"RECORD SX 07-A // SITES // FILED 2026-02-24","text":"Seraphix Systems, \"SX-07-A-0516\", v1, https://seraphixsystems.com/r/SX-07-A-0516, retrieved [date].","published":"2026-11-05"},"gate":{"passed":true,"hash_verified":true,"source":"intel pipeline gate"},"published":"2026-11-05"},{"id":"SX-07-B-0004","url":"https://seraphixsystems.com/r/SX-07-B-0004","json":"https://seraphixsystems.com/r/SX-07-B-0004.json","label":"RECORD SX 07-B // POWER // FILED 2026-02-24","scope":"entity","entity":{"cik":"0001819989","legal_name":"Cipher Digital Inc.","display_name":"Cipher Digital","url":"https://seraphixsystems.com/pilot-01/company/cipher-digital"},"state":null,"section":"power","tag":"COMPANY DISCLOSURE","instrument":null,"primary_pending":false,"claim":"Luminant Power Agreement (power purchase agreement entered June 2021, amended and restated August 23, 2023) for the supply of electric power to the Odessa Facility: access until at least July 2027 at approximately 2.7 c/kWh (2.8 c/kWh from October 2025); take-or-pay for at least 66.7% of the full 207 MW capacity each year (10-K, filed 2026-02-24)","quote":"In June 2021, we entered into a power purchase agreement with Luminant for the supply of electric power to the Odessa Facility, which was subsequently amended and restated, most recently on August 23, 2023 (as amended, the \"Luminant Power Agreement\"), pursuant to which we have access, until at least July 2027, to a cost of electricity of approximately 2.7 c/kWh, subject to certain increases related to certain tariffs, price increased in October 2025 to 2.8 c/kWh. The Luminant Power Agreement provides for a take or pay arrangement, whereby, Luminant will supply, and we are obligated to accept and pay for, a total electrical power capacity equal to at least 66.7% of the full 207 MW capacity each year at a predetermined MWh rate","fields":{"agreement":"power purchase agreement","counterparty":"Luminant","location":"not stated in source","mw":207,"site":"Odessa Facility (served)","state":null,"status":"in effect until at least July 2027"},"basis":"regulator_hosted_filing","basis_label":"REGULATOR-HOSTED FILING","source":{"title":"Cipher Digital Inc. — 10-K Item 1. Business (normalized-text offset 62404)","locator":"10-K Item 1. Business (normalized-text offset 62404)","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm"},"also":[],"primary":{"title":"Cipher Digital Inc. — 10-K Item 1. Business (normalized-text offset 62404)","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm"},"dates":{"occurred":null,"reported":null,"source_published":"2026-02-24","first_seen":null,"ingested":"2026-11-04","corrected":null},"record_date":"2026-02-24","lifecycle":"active","version":1,"versions":[{"version":1,"claim":"Luminant Power Agreement (power purchase agreement entered June 2021, amended and restated August 23, 2023) for the supply of electric power to the Odessa Facility: access until at least July 2027 at approximately 2.7 c/kWh (2.8 c/kWh from October 2025); take-or-pay for at least 66.7% of the full 207 MW capacity each year (10-K, filed 2026-02-24)","current":true,"url":"https://seraphixsystems.com/r/SX-07-B-0004/v1","json":"https://seraphixsystems.com/r/SX-07-B-0004/v1.json"}],"cite":{"publisher":"Seraphix Systems","record_id":"SX-07-B-0004","url":"https://seraphixsystems.com/r/SX-07-B-0004","version":1,"title":"RECORD SX 07-B // POWER // FILED 2026-02-24","text":"Seraphix Systems, \"SX-07-B-0004\", v1, https://seraphixsystems.com/r/SX-07-B-0004, retrieved [date].","published":"2026-11-05"},"gate":{"passed":true,"hash_verified":true,"source":"intel pipeline gate"},"published":"2026-11-05"},{"id":"SX-07-B-0005","url":"https://seraphixsystems.com/r/SX-07-B-0005","json":"https://seraphixsystems.com/r/SX-07-B-0005.json","label":"RECORD SX 07-B // POWER // FILED 2026-11-02","scope":"entity","entity":{"cik":"0001819989","legal_name":"Cipher Digital Inc.","display_name":"Cipher Digital","url":"https://seraphixsystems.com/pilot-01/company/cipher-digital"},"state":null,"section":"power","tag":"COMPANY DISCLOSURE","instrument":null,"primary_pending":false,"claim":"Odessa Facility -- supply of a fixed amount of electric power from Luminant under the Luminant Power Agreement (entered June 23, 2021; term of five years, subject to certain early termination exemptions)","quote":"On June 23, 2021, the Company entered into a power purchase agreement with Luminant, which was subsequently amended on July 9, 2021, and further amended on February 28, 2022, August 26, 2022, and August 23, 2023 (as amended, the “Luminant Power Agreement”), for the supply of a fixed amount of electric power to the Odessa Facility at a fixed price for a term of five years, subject to certain early termination exemptions.","fields":{"agreement":"Luminant Power Agreement","counterparty":"Luminant","site":"Odessa Facility","term":"five years"},"basis":"regulator_hosted_filing","basis_label":"REGULATOR-HOSTED FILING","source":{"title":"Cipher Digital Inc. — 10-Q Note 4","locator":"10-Q Note 4, Derivative assets","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000050/cifr-20260930.htm"},"also":[],"primary":{"title":"Cipher Digital Inc. — 10-Q Note 4","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000050/cifr-20260930.htm"},"dates":{"occurred":"2021-06-23","reported":null,"source_published":"2026-11-02","first_seen":null,"ingested":"2026-11-04","corrected":null},"record_date":"2026-11-02","lifecycle":"active","version":1,"versions":[{"version":1,"claim":"Odessa Facility -- supply of a fixed amount of electric power from Luminant under the Luminant Power Agreement (entered June 23, 2021; term of five years, subject to certain early termination exemptions)","current":true,"url":"https://seraphixsystems.com/r/SX-07-B-0005/v1","json":"https://seraphixsystems.com/r/SX-07-B-0005/v1.json"}],"cite":{"publisher":"Seraphix Systems","record_id":"SX-07-B-0005","url":"https://seraphixsystems.com/r/SX-07-B-0005","version":1,"title":"RECORD SX 07-B // POWER // FILED 2026-11-02","text":"Seraphix Systems, \"SX-07-B-0005\", v1, https://seraphixsystems.com/r/SX-07-B-0005, retrieved [date].","published":"2026-11-05"},"gate":{"passed":true,"hash_verified":true,"source":"intel pipeline gate"},"published":"2026-11-05"},{"id":"SX-07-B-0006","url":"https://seraphixsystems.com/r/SX-07-B-0006","json":"https://seraphixsystems.com/r/SX-07-B-0006.json","label":"RECORD SX 07-B // POWER // FILED 2026-11-02","scope":"entity","entity":{"cik":"0001819989","legal_name":"Cipher Digital Inc.","display_name":"Cipher Digital","url":"https://seraphixsystems.com/pilot-01/company/cipher-digital"},"state":"TX","section":"power","tag":"COMPANY DISCLOSURE","instrument":null,"primary_pending":false,"claim":"Black Pearl Facility -- 300 MW data center in Wink, Texas -- draws power from the power grid","quote":"The Company has a 300 MW data center in Wink, Texas that draws power from the power grid (the “Black Pearl Facility”)","fields":{"location":"Wink, Texas","mw":300,"site":"Black Pearl Facility","state":"TX","supply":"power grid"},"basis":"regulator_hosted_filing","basis_label":"REGULATOR-HOSTED FILING","source":{"title":"Cipher Digital Inc. — 10-Q Note 1","locator":"10-Q Note 1, Nature of operations","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000050/cifr-20260930.htm"},"also":[],"primary":{"title":"Cipher Digital Inc. — 10-Q Note 1","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1819989/000181998926000050/cifr-20260930.htm"},"dates":{"occurred":null,"reported":null,"source_published":"2026-11-02","first_seen":null,"ingested":"2026-11-04","corrected":null},"record_date":"2026-11-02","lifecycle":"active","version":1,"versions":[{"version":1,"claim":"Black Pearl Facility -- 300 MW data center in Wink, Texas -- draws power from the power grid","current":true,"url":"https://seraphixsystems.com/r/SX-07-B-0006/v1","json":"https://seraphixsystems.com/r/SX-07-B-0006/v1.json"}],"cite":{"publisher":"Seraphix Systems","record_id":"SX-07-B-0006","url":"https://seraphixsystems.com/r/SX-07-B-0006","version":1,"title":"RECORD SX 07-B // POWER // FILED 2026-11-02","text":"Seraphix Systems, \"SX-07-B-0006\", v1, https://seraphixsystems.com/r/SX-07-B-0006, retrieved [date].","published":"2026-11-05"},"gate":{"passed":true,"hash_verified":true,"source":"intel pipeline gate"},"published":"2026-11-05"}],"checked":"2026-11-05T18:53:36Z","max_age_minutes":1440,"sections":{"sites":{"record_ids":["SX-07-A-0001","SX-07-A-0002","SX-07-A-0003","SX-07-A-0004","SX-07-A-0005","SX-07-A-0064","SX-07-A-0316","SX-07-A-0319","SX-07-A-0320","SX-07-A-0321","SX-07-A-0489","SX-07-A-0490","SX-07-A-0491","SX-07-A-0492","SX-07-A-0503","SX-07-A-0514","SX-07-A-0515","SX-07-A-0516"]},"power":{"record_ids":["SX-07-B-0004","SX-07-B-0005","SX-07-B-0006"]}},"coverage":{"status":"OBSERVED","last_good_check":"2026-11-05T18:45:08Z"},"_coverage":{"status":"OBSERVED","last_good_check":"2026-11-05T18:53:36Z"}}