# SX-07-A-0001: Cipher Digital

> Black Pearl Facility -- 300 MW -- Wink, Texas -- bitcoin mining through February 2026; phased delivery to an HPC tenant commenced August 2026

- **Record:** https://seraphixsystems.com/r/SX-07-A-0001
- **Label:** RECORD SX 07-A // SITES // FILED 2026-11-02
- **Tag:** COMPANY DISCLOSURE
- **Basis:** REGULATOR-HOSTED FILING
- **Review tier:** reviewed
- **Company:** Cipher Digital Inc. (SEC CIK 0001819989) https://seraphixsystems.com/pilot-01/company/cipher-digital
- **State:** TX
- **Section:** sites
- **Instrument:** SITE
- **Source:** [Cipher Digital Inc. — 10-Q Note 1](https://www.sec.gov/Archives/edgar/data/1819989/000181998926000050/cifr-20260930.htm) · SEC EDGAR · 10-Q Note 1, Nature of operations
- **Source date:** 2026-11-02
- **Record date:** 2026-11-02
- **Published by Seraphix:** 2026-11-05
- **Version:** v1
- **Primary document:** [Cipher Digital Inc. — 10-Q Note 1](https://www.sec.gov/Archives/edgar/data/1819989/000181998926000050/cifr-20260930.htm)

## Verbatim quote

> The Company has a 300 MW data center in Wink, Texas that draws power from the power grid (the “Black Pearl Facility”) that was used for bitcoin mining through February 2026, and in August 2026 commenced phased delivery to an HPC tenant.

## Fields

- location: Wink, Texas
- mw: 300
- site: Black Pearl Facility
- state: TX
- status: operating (HPC phased delivery)

## Other dated filings stating this (newest first)

- 2026-08-04 · 10-Q · https://www.sec.gov/Archives/edgar/data/1819989/000181998926000041/cifr-20260630.htm
  > The Company also has a 300 MW data center in Wink, Texas that draws power from the power grid (the "Black Pearl Facility") that was previously used for bitcoin mining.
- 2026-02-24 · 10-K · https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm
  > Our Black Pearl data center is our wholly-owned 300 MW facility located in Wink, Texas.
- 2026-02-24 · 10-K · https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm
  > The Black Pearl Facility has received approvals for 300 MW of interconnection and has entered into agreements necessary to participate in the ERCOT market.
- 2026-02-24 · 10-K · https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm
  > The Company and its wholly-owned subsidiary, Cipher Black Pearl LLC ("Black Pearl"), assumed a lease for an approximately 75 acre plot of land in Winkler County, Texas in December 2023, for the purpose of constructing a data center, and ancillary infrastructure to construct the Black Pearl Facility.
- 2026-02-24 · 10-K · https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/cifr-20251231.htm
  > and a 300 MW data center in Wink, Texas that draws power from the power grid (the "Black Pearl Facility")

## Versions

- v1 (current): Black Pearl Facility -- 300 MW -- Wink, Texas -- bitcoin mining through February 2026; phased delivery to an HPC tenant commenced August 2026 · https://seraphixsystems.com/r/SX-07-A-0001/v1