{"$schema":"https://seraphixsystems.com/data/schema/record.schema.json","generated":"2026-11-05T18:53:37+00:00","publisher":"Seraphix Systems NJ LLC","license":{"name":"CC BY 4.0","url":"https://creativecommons.org/licenses/by/4.0/","attribution":"Seraphix Systems"},"id":"SX-07-A-0056","url":"https://seraphixsystems.com/r/SX-07-A-0056","json":"https://seraphixsystems.com/r/SX-07-A-0056.json","label":"RECORD SX 07-A // SITES // FILED 2026-10-07","scope":"entity","entity":{"cik":"0001144879","legal_name":"Applied Digital Corp.","display_name":"Applied Digital","url":"https://seraphixsystems.com/pilot-01/company/applied-digital"},"state":null,"section":"sites","tag":"COMPANY DISCLOSURE","instrument":"SITE","primary_pending":false,"claim":"Our two buildings at our Polaris Forge 3 campus -- 300 MW -- under construction","quote":"Our two buildings at our Polaris Forge 3 campus, with an aggregate 300MW capacity, are currently under construction.","fields":{"location":"not stated in source","mw":300,"site":"Our two buildings at our Polaris Forge 3 campus","state":null,"status":"under construction"},"basis":"regulator_hosted_filing","basis_label":"REGULATOR-HOSTED FILING","source":{"title":"Applied Digital Corp. — 10-Q Item 2. Management's Discussion and Analysis of Financial Condition and Results of Operations Forward-Looking Statements This Quarterly Report (normalized-text offset 154307)","locator":"10-Q Item 2. Management's Discussion and Analysis of Financial Condition and Results of Operations Forward-Looking Statements This Quarterly Report (normalized-text offset 154307)","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1144879/000114487926000059/apld-20260831.htm"},"also":[],"primary":{"title":"Applied Digital Corp. — 10-Q Item 2. Management's Discussion and Analysis of Financial Condition and Results of Operations Forward-Looking Statements This Quarterly Report (normalized-text offset 154307)","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1144879/000114487926000059/apld-20260831.htm"},"dates":{"occurred":null,"reported":null,"source_published":"2026-10-07","first_seen":null,"ingested":"2026-11-04","corrected":null},"record_date":"2026-10-07","lifecycle":"active","version":1,"versions":[{"version":1,"claim":"Our two buildings at our Polaris Forge 3 campus -- 300 MW -- under construction","current":true,"url":"https://seraphixsystems.com/r/SX-07-A-0056/v1","json":"https://seraphixsystems.com/r/SX-07-A-0056/v1.json"}],"cite":{"publisher":"Seraphix Systems","record_id":"SX-07-A-0056","url":"https://seraphixsystems.com/r/SX-07-A-0056","version":1,"title":"RECORD SX 07-A // SITES // FILED 2026-10-07","text":"Seraphix Systems, \"SX-07-A-0056\", v1, https://seraphixsystems.com/r/SX-07-A-0056, retrieved [date].","published":"2026-11-05"},"history":[{"filed":"2026-07-29","form":"10-K","quote":"Polaris Forge 1, Polaris Forge 2, and Polaris Forge 3 in our northern region","url":"https://www.sec.gov/Archives/edgar/data/1144879/000114487926000048/apld-20260531.htm","publisher":"SEC EDGAR"},{"filed":"2026-07-29","form":"10-K","quote":"Polaris Forge 3 is a 300 MW critical IT load data center campus located in our northern United States region, currently under construction across two buildings.","url":"https://www.sec.gov/Archives/edgar/data/1144879/000114487926000048/apld-20260531.htm","publisher":"SEC EDGAR"},{"filed":"2026-07-29","form":"10-K","quote":"deliver a combined 300MW of critical IT load to support the second hyperscaler's AI and HPC infrastructure at Polaris Forge 3","url":"https://www.sec.gov/Archives/edgar/data/1144879/000114487926000048/apld-20260531.htm","publisher":"SEC EDGAR"},{"filed":"2026-07-29","form":"10-K","quote":"to deliver a combined 300MW of critical IT load to support the second hyperscaler's AI and HPC infrastructure at Polaris Forge 3","url":"https://www.sec.gov/Archives/edgar/data/1144879/000114487926000048/apld-20260531.htm","publisher":"SEC EDGAR"}],"gate":{"passed":true,"hash_verified":true,"source":"intel pipeline gate"},"published":"2026-11-05"}