{"$schema":"https://seraphixsystems.com/data/schema/record.schema.json","generated":"2026-11-05T18:53:37+00:00","publisher":"Seraphix Systems NJ LLC","license":{"name":"CC BY 4.0","url":"https://creativecommons.org/licenses/by/4.0/","attribution":"Seraphix Systems"},"id":"SX-07-A-0193","url":"https://seraphixsystems.com/r/SX-07-A-0193","json":"https://seraphixsystems.com/r/SX-07-A-0193.json","label":"RECORD SX 07-A // SITES // FILED 2026-05-08","scope":"entity","entity":{"cik":"0001878848","legal_name":"IREN Ltd","display_name":"IREN","url":"https://seraphixsystems.com/pilot-01/company/iren"},"state":null,"section":"sites","tag":"COMPANY DISCLOSURE","instrument":"SITE","primary_pending":false,"claim":"Childress campus -- operating (currently supporting Bitcoin mining operations)","quote":"the retrofit and repurposing of certain air-cooled data centers currently supporting Bitcoin mining operations at the Childress campus","fields":{"location":"not stated in source","mw":null,"site":"Childress campus","state":null,"status":"operating (currently supporting Bitcoin mining operations)"},"basis":"regulator_hosted_filing","basis_label":"REGULATOR-HOSTED FILING","source":{"title":"IREN Ltd — 10-Q Item 1A. Risk (normalized-text offset 140861)","locator":"10-Q Item 1A. Risk (normalized-text offset 140861)","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1878848/000187884826000026/iren-20260331.htm"},"also":[],"primary":{"title":"IREN Ltd — 10-Q Item 1A. Risk (normalized-text offset 140861)","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1878848/000187884826000026/iren-20260331.htm"},"dates":{"occurred":null,"reported":null,"source_published":"2026-05-08","first_seen":null,"ingested":"2026-11-04","corrected":null},"record_date":"2026-05-08","lifecycle":"active","version":1,"versions":[{"version":1,"claim":"Childress campus -- operating (currently supporting Bitcoin mining operations)","current":true,"url":"https://seraphixsystems.com/r/SX-07-A-0193/v1","json":"https://seraphixsystems.com/r/SX-07-A-0193/v1.json"}],"cite":{"publisher":"Seraphix Systems","record_id":"SX-07-A-0193","url":"https://seraphixsystems.com/r/SX-07-A-0193","version":1,"title":"RECORD SX 07-A // SITES // FILED 2026-05-08","text":"Seraphix Systems, \"SX-07-A-0193\", v1, https://seraphixsystems.com/r/SX-07-A-0193, retrieved [date].","published":"2026-11-05"},"history":[{"filed":"2026-08-27","form":"10-K","quote":"Childress, Texas, United States 750MW","url":"https://www.sec.gov/Archives/edgar/data/1878848/000187884826000052/iren-20260630.htm","publisher":"SEC EDGAR"},{"filed":"2026-08-27","form":"10-K","quote":"Furthermore, our Childress site is located in the Panhandle region of Texas, which generates significant renewable energy.","url":"https://www.sec.gov/Archives/edgar/data/1878848/000187884826000052/iren-20260630.htm","publisher":"SEC EDGAR"},{"filed":"2026-08-27","form":"10-K","quote":"In particular, our Childress Site is located in a remote rural part of Texas with a narrow pool of local qualified labor and limited housing and accommodation options.","url":"https://www.sec.gov/Archives/edgar/data/1878848/000187884826000052/iren-20260630.htm","publisher":"SEC EDGAR"},{"filed":"2026-08-27","form":"10-K","quote":"we will provide Microsoft Corporation with dedicated GPU services at \"Horizon\" data center facilities located in Childress, Texas over a five-year average term","url":"https://www.sec.gov/Archives/edgar/data/1878848/000187884826000052/iren-20260630.htm","publisher":"SEC EDGAR"},{"filed":"2026-05-08","form":"10-Q","quote":"We have seven data center sites with executed grid connection agreements, letters of agreement or equivalents, representing 4,510MW of total power capacity: three in Texas, United States, namely Childress (750MW), Sweetwater 1 (1,400MW) and Sweetwater 2 (600MW), one in Oklahoma (1,600MW), United States, and three in British Columbia, Canada, namely Canal Flats (30MW), Mackenzie (80MW) and Prince George (50MW)","url":"https://www.sec.gov/Archives/edgar/data/1878848/000187884826000026/iren-20260331.htm","publisher":"SEC EDGAR"},{"filed":"2026-05-08","form":"10-Q","quote":"data center facilities located in Childress, Texas","url":"https://www.sec.gov/Archives/edgar/data/1878848/000187884826000026/iren-20260331.htm","publisher":"SEC EDGAR"},{"filed":"2026-05-08","form":"10-Q","quote":"provide dedicated GPU services in tranches at data center facilities located in Childress, Texas","url":"https://www.sec.gov/Archives/edgar/data/1878848/000187884826000026/iren-20260331.htm","publisher":"SEC EDGAR"},{"filed":"2026-05-08","form":"10-Q","quote":"the Group's data center facilities located in Childress, Texas","url":"https://www.sec.gov/Archives/edgar/data/1878848/000187884826000026/iren-20260331.htm","publisher":"SEC EDGAR"},{"filed":"2026-05-08","form":"10-Q","quote":"the development of data center infrastructure at Childress, Texas","url":"https://www.sec.gov/Archives/edgar/data/1878848/000187884826000026/iren-20260331.htm","publisher":"SEC EDGAR"},{"filed":"2026-02-05","form":"10-Q","quote":"One recent focus area has been on implementing power cost optimization initiatives at our Childress site in Texas, which enable the transition between Bitcoin mining and energy trading to optimize profitability.","url":"https://www.sec.gov/Archives/edgar/data/1878848/000187884826000015/iren-20251231.htm","publisher":"SEC EDGAR"},{"filed":"2026-02-05","form":"10-Q","quote":"Our 750MW Childress site has been operating since April 2023","url":"https://www.sec.gov/Archives/edgar/data/1878848/000187884826000015/iren-20251231.htm","publisher":"SEC EDGAR"},{"filed":"2026-02-05","form":"10-Q","quote":"We are advancing the design of direct-to-chip liquid cooling systems, including to support an initial IT load of up to 200MW (based on rack density of 200kW, subject to customer requirements) liquid-cooled deployment at Childress.","url":"https://www.sec.gov/Archives/edgar/data/1878848/000187884826000015/iren-20251231.htm","publisher":"SEC EDGAR"}],"gate":{"passed":true,"hash_verified":true,"source":"intel pipeline gate"},"published":"2026-11-05"}