{"$schema":"https://seraphixsystems.com/data/schema/record.schema.json","generated":"2026-11-05T18:53:37+00:00","publisher":"Seraphix Systems NJ LLC","license":{"name":"CC BY 4.0","url":"https://creativecommons.org/licenses/by/4.0/","attribution":"Seraphix Systems"},"id":"SX-07-A-0505","url":"https://seraphixsystems.com/r/SX-07-A-0505","json":"https://seraphixsystems.com/r/SX-07-A-0505.json","label":"RECORD SX 07-A // SITES // FILED 2026-07-29","scope":"entity","entity":{"cik":"0001144879","legal_name":"Applied Digital Corp.","display_name":"Applied Digital","url":"https://seraphixsystems.com/pilot-01/company/applied-digital"},"state":"ND","section":"sites","tag":"COMPANY DISCLOSURE","instrument":"SITE","primary_pending":false,"claim":"Polaris Forge 1 -- Ellendale, North Dakota -- campus being developed in phases","quote":"Polaris Forge 1 Our flagship HPC campus, located in Ellendale, North Dakota, is being developed in phases.","fields":{"location":"Ellendale, North Dakota","mw":null,"site":"Polaris Forge 1","state":"ND","status":"being developed in phases"},"basis":"regulator_hosted_filing","basis_label":"REGULATOR-HOSTED FILING","source":{"title":"Applied Digital Corp. — 10-K Item 1. Business Overview Our Business (normalized-text offset 48646)","locator":"10-K Item 1. Business Overview Our Business (normalized-text offset 48646)","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1144879/000114487926000048/apld-20260531.htm"},"also":[],"primary":{"title":"Applied Digital Corp. — 10-K Item 1. Business Overview Our Business (normalized-text offset 48646)","publisher":"SEC EDGAR","url":"https://www.sec.gov/Archives/edgar/data/1144879/000114487926000048/apld-20260531.htm"},"dates":{"occurred":null,"reported":null,"source_published":"2026-07-29","first_seen":null,"ingested":"2026-11-04","corrected":null},"record_date":"2026-07-29","lifecycle":"active","version":1,"versions":[{"version":1,"claim":"Polaris Forge 1 -- Ellendale, North Dakota -- campus being developed in phases","current":true,"url":"https://seraphixsystems.com/r/SX-07-A-0505/v1","json":"https://seraphixsystems.com/r/SX-07-A-0505/v1.json"}],"cite":{"publisher":"Seraphix Systems","record_id":"SX-07-A-0505","url":"https://seraphixsystems.com/r/SX-07-A-0505","version":1,"title":"RECORD SX 07-A // SITES // FILED 2026-07-29","text":"Seraphix Systems, \"SX-07-A-0505\", v1, https://seraphixsystems.com/r/SX-07-A-0505, retrieved [date].","published":"2026-11-05"},"history":[{"filed":"2026-07-29","form":"10-K","quote":"APLD ComputeCo intends to use the net proceeds from the offering to fund a portion of the construction and associated expenses of its 100 MW and 150 MW data centers, ELN-02 and ELN-03, respectively (the \"Ellendale Facilities\")","url":"https://www.sec.gov/Archives/edgar/data/1144879/000114487926000048/apld-20260531.htm","publisher":"SEC EDGAR"},{"filed":"2026-07-29","form":"10-K","quote":"Polaris Forge 1 CoreWeave 400 MW 15 years ~$11.0B 2H25–1H27","url":"https://www.sec.gov/Archives/edgar/data/1144879/000114487926000048/apld-20260531.htm","publisher":"SEC EDGAR"},{"filed":"2026-07-29","form":"10-K","quote":"Polaris Forge 1, Polaris Forge 2, and Polaris Forge 3 in our northern region","url":"https://www.sec.gov/Archives/edgar/data/1144879/000114487926000048/apld-20260531.htm","publisher":"SEC EDGAR"},{"filed":"2026-07-29","form":"10-K","quote":"The first lease is for the full capacity of Building 2, the Company's 100 MW data center, which was completed and became operational in November 2025.","url":"https://www.sec.gov/Archives/edgar/data/1144879/000114487926000048/apld-20260531.htm","publisher":"SEC EDGAR"},{"filed":"2026-07-29","form":"10-K","quote":"The second lease is for the full capacity of Building 3, a 150 MW data center that is also under construction and is expected to become operational during the calendar year 2026.","url":"https://www.sec.gov/Archives/edgar/data/1144879/000114487926000048/apld-20260531.htm","publisher":"SEC EDGAR"},{"filed":"2026-07-29","form":"10-K","quote":"at the Company's 400MW Ellendale, North Dakota campus (\"Polaris Forge 1\")","url":"https://www.sec.gov/Archives/edgar/data/1144879/000114487926000048/apld-20260531.htm","publisher":"SEC EDGAR"},{"filed":"2026-07-29","form":"10-K","quote":"fund the continued construction and development of its Polaris Forge I data center in Ellendale, North Dakota","url":"https://www.sec.gov/Archives/edgar/data/1144879/000114487926000048/apld-20260531.htm","publisher":"SEC EDGAR"},{"filed":"2026-07-29","form":"10-K","quote":"fund the continued construction and development of our Polaris Forge 1 data center campus in Ellendale, North Dakota","url":"https://www.sec.gov/Archives/edgar/data/1144879/000114487926000048/apld-20260531.htm","publisher":"SEC EDGAR"},{"filed":"2026-07-29","form":"10-K","quote":"the continued construction and development of its Polaris Forge 1 and Polaris Forge 2 44 data centers in Ellendale and Harwood, North Dakota","url":"https://www.sec.gov/Archives/edgar/data/1144879/000114487926000048/apld-20260531.htm","publisher":"SEC EDGAR"},{"filed":"2026-07-29","form":"10-K","quote":"to deliver an additional 150 MW at Polaris Forge 1, bringing the total capacity under contract at Polaris Forge 1 to 400 MW","url":"https://www.sec.gov/Archives/edgar/data/1144879/000114487926000048/apld-20260531.htm","publisher":"SEC EDGAR"},{"filed":"2026-04-08","form":"10-Q","quote":"The first lease is for the full capacity of Building 2, our 100 MW data center, which was completed and became operational in November 2025.","url":"https://www.sec.gov/Archives/edgar/data/1144879/000114487926000030/apld-20260228.htm","publisher":"SEC EDGAR"},{"filed":"2026-04-08","form":"10-Q","quote":"The third lease is for the full capacity of Building 4, which is currently in the design phase and is expected to be service-ready in middle of calendar year 2027.","url":"https://www.sec.gov/Archives/edgar/data/1144879/000114487926000030/apld-20260228.htm","publisher":"SEC EDGAR"},{"filed":"2026-04-08","form":"10-Q","quote":"fund the continued construction and development of its Polaris Forge 1 and Polaris Forge 2 data centers in Ellendale and Harwood, North Dakota","url":"https://www.sec.gov/Archives/edgar/data/1144879/000114487926000030/apld-20260228.htm","publisher":"SEC EDGAR"},{"filed":"2026-04-08","form":"10-Q","quote":"its 100 MW and 150 MW data centers, ELN-02 and ELN-03, respectively (the \"Facilities\")","url":"https://www.sec.gov/Archives/edgar/data/1144879/000114487926000030/apld-20260228.htm","publisher":"SEC EDGAR"},{"filed":"2026-01-08","form":"10-Q","quote":"the construction and associated expenses of its 100 MW and 150 MW data centers, ELN-02 and ELN-03, respectively (the \"Facilities\")","url":"https://www.sec.gov/Archives/edgar/data/1144879/000114487926000006/apld-20251130.htm","publisher":"SEC EDGAR"}],"gate":{"passed":true,"hash_verified":true,"source":"intel pipeline gate"},"published":"2026-11-05"}