Seraphix SystemsCompany IntelligenceDossier pilot · In development

DOSSIER SX 07 // HOST // FULL

Cipher Digital

Reviewed site records in the company’s own words.

EDGAR legal name
Cipher Digital Inc.
SEC CIK
0001819989
Incorporated
Delaware
Dossier version
1
Identity checked
Source
SEC EDGAR

OBSERVED · LAST GOOD CHECK

SX 01-C // Cipher Digital // RECORDS: LIVEEDGAR

SITE RECORDS
5
MW STATED
907
PROCEEDINGS
NOT MONITORED

FILINGS · TIME (ET)

  1. 10-QQUARTERLY REPORT ↗
  2. 8-KITEM 2.02 · ITEM 7.01 · ITEM 9.01 ↗
  3. 8-KITEM 1.01 · ITEM 2.03 · ITEM 3.02 · ITEM 7.01 · ITEM 9.01 ↗
  4. 8-KITEM 8.01 · ITEM 9.01 ↗
  5. 8-KITEM 7.01 · ITEM 8.01 · ITEM 9.01 ↗
  6. 8-KITEM 7.01 · ITEM 8.01 · ITEM 9.01 ↗

LAST GOOD CHECK

RECORD SX 07-A // SITES

Sites

Reviewed company site records
SiteLocationMWStatus as statedSource
Black Pearl Facility
Quote + record
The Company has a 300 MW data center in Wink, Texas that draws power from the power grid (the “Black Pearl Facility”) that was used for bitcoin mining through February 2026, and in August 2026 commenced phased delivery to an HPC tenant.

Wink, Texas · Cipher Digital Inc. — 10-Q Note 1 · SX-07-A-0001

Wink, Texas300operating (HPC phased delivery)10-Q Note 1, Nature of operations

Barber Lake Facility
Quote + record
the 300 MW Barber Lake Facility for Fluidstack USA II Inc. (“Fluidstack”), expecting phased commencement in the fourth quarter of 2026

not stated in source · Cipher Digital Inc. — 10-Q Note 1 · SX-07-A-0002

not stated in source300under construction

COMPANY-STATED

10-Q Note 1, Nature of operations

Stingray Facility
Quote + record
the 100 MW Stingray data center (the “Stingray Facility”) expecting commencement in 2027

not stated in source · Cipher Digital Inc. — 10-Q Note 1 · SX-07-A-0003

not stated in source100under construction

COMPANY-STATED

10-Q Note 1, Nature of operations

Odessa Facility
Quote + record
The Company also operates one wholly owned bitcoin mining data center, a 207 MW site located in Odessa, Texas that draws fixed priced power from a power purchase agreement with its electricity provider (the “Odessa Facility”).

Odessa, Texas · Cipher Digital Inc. — 10-Q Note 1 · SX-07-A-0004

Odessa, Texas207operating (bitcoin mining)10-Q Note 1, Nature of operations

7 additional sites
Quote + record
The Company’s portfolio as of September 30, 2026 also consists of seven additional sites expected to be built out for HPC.

not stated in source · Cipher Digital Inc. — 10-Q Note 1 · SX-07-A-0005

not stated in sourcenot stated in sourcedevelopment

COMPANY-STATED

10-Q Note 1, Nature of operations

RECORD SX 07-B // POWER

Power

NOT MONITORED No reviewed records supplied for this section. This is not a zero.

RECORD SX 07-C // INCENTIVES

Incentives

NOT MONITORED No reviewed records supplied for this section. This is not a zero.

RECORD SX 07-D // WATER + PERMITS

Water + permits

NOT MONITORED No reviewed records supplied for this section. This is not a zero.

RECORD SX 07-E // POLICY EXPOSURE

Policy exposure

NOT MONITORED No reviewed records supplied for this section. This is not a zero.

Timeline

  1. RECORD SX 07-A // SITES // FILED 2026-11-02

    COMPANY DISCLOSURE

    Black Pearl Facility -- 300 MW -- Wink, Texas -- bitcoin mining through February 2026; phased delivery to an HPC tenant commenced August 2026

    Cipher Digital Inc.BASIS · REGULATOR-HOSTED FILINGSOURCE · Cipher Digital Inc. — 10-Q Note 1 · SEC EDGARRECORD DATE · v1
    Verbatim quote and source
    The Company has a 300 MW data center in Wink, Texas that draws power from the power grid (the “Black Pearl Facility”) that was used for bitcoin mining through February 2026, and in August 2026 commenced phased delivery to an HPC tenant.

    10-Q Note 1, Nature of operations · Original source ↗

    Cite: Seraphix Systems, “SX-07-A-0001”, v1, https://seraphixsystems.com/r/SX-07-A-0001, retrieved . · JSON

  2. RECORD SX 07-A // SITES // FILED 2026-11-02

    COMPANY DISCLOSURE

    Barber Lake Facility -- 300 MW -- for Fluidstack USA II Inc. -- company expects phased commencement in Q4 2026

    Cipher Digital Inc.BASIS · REGULATOR-HOSTED FILINGSOURCE · Cipher Digital Inc. — 10-Q Note 1 · SEC EDGARRECORD DATE · v1EXPECTATION · COMPANY-STATED
    Verbatim quote and source
    the 300 MW Barber Lake Facility for Fluidstack USA II Inc. (“Fluidstack”), expecting phased commencement in the fourth quarter of 2026

    10-Q Note 1, Nature of operations · Original source ↗

    Cite: Seraphix Systems, “SX-07-A-0002”, v1, https://seraphixsystems.com/r/SX-07-A-0002, retrieved . · JSON

  3. RECORD SX 07-A // SITES // FILED 2026-11-02

    COMPANY DISCLOSURE

    Stingray Facility -- 100 MW -- company expects commencement in 2027

    Cipher Digital Inc.BASIS · REGULATOR-HOSTED FILINGSOURCE · Cipher Digital Inc. — 10-Q Note 1 · SEC EDGARRECORD DATE · v1EXPECTATION · COMPANY-STATED
    Verbatim quote and source
    the 100 MW Stingray data center (the “Stingray Facility”) expecting commencement in 2027

    10-Q Note 1, Nature of operations · Original source ↗

    Cite: Seraphix Systems, “SX-07-A-0003”, v1, https://seraphixsystems.com/r/SX-07-A-0003, retrieved . · JSON

  4. RECORD SX 07-A // SITES // FILED 2026-11-02

    COMPANY DISCLOSURE

    Odessa Facility -- 207 MW -- Odessa, Texas -- wholly owned bitcoin mining data center

    Cipher Digital Inc.BASIS · REGULATOR-HOSTED FILINGSOURCE · Cipher Digital Inc. — 10-Q Note 1 · SEC EDGARRECORD DATE · v1
    Verbatim quote and source
    The Company also operates one wholly owned bitcoin mining data center, a 207 MW site located in Odessa, Texas that draws fixed priced power from a power purchase agreement with its electricity provider (the “Odessa Facility”).

    10-Q Note 1, Nature of operations · Original source ↗

    Cite: Seraphix Systems, “SX-07-A-0004”, v1, https://seraphixsystems.com/r/SX-07-A-0004, retrieved . · JSON

  5. RECORD SX 07-A // SITES // FILED 2026-11-02

    COMPANY DISCLOSURE

    Seven additional sites expected to be built out for HPC

    Cipher Digital Inc.BASIS · REGULATOR-HOSTED FILINGSOURCE · Cipher Digital Inc. — 10-Q Note 1 · SEC EDGARRECORD DATE · v1EXPECTATION · COMPANY-STATED
    Verbatim quote and source
    The Company’s portfolio as of September 30, 2026 also consists of seven additional sites expected to be built out for HPC.

    10-Q Note 1, Nature of operations · Original source ↗

    Cite: Seraphix Systems, “SX-07-A-0005”, v1, https://seraphixsystems.com/r/SX-07-A-0005, retrieved . · JSON

Coverage

OBSERVED · LAST GOOD CHECK

Source coverage and last good check
SourceCoverageLast good check
SEC EDGAR · filingsOBSERVED

Filings for every pilot entity

EIA-930 · hourly grid demandOBSERVED

ERCO, PJM, SOCO balancing areas

Statutes, codes + executive actionsOBSERVED · MANUAL

Primary text for ENACTED records in pilot states

Press · secondaryOBSERVED · MANUAL

Named outlets only; replaced when a primary is attached

State utility commission docketsNOT MONITORED

PUCT, Georgia PSC, Virginia SCC

Not stated in source
Large-load interconnection queuesNOT MONITORED

ERCOT, PJM, Georgia Power

Not stated in source
Environmental + local permitsNOT MONITORED

TCEQ, Georgia EPD, Virginia DEQ, local land use

Not stated in source
State + county incentive agreementsNOT MONITORED

Comptroller, revenue departments, county abatements

Not stated in source

Corrections

No corrections supplied. Earlier versions remain visible when a correction is published.