Seraphix SystemsCompany IntelligenceDossier pilot · In development

INDEX SX 10 // COMPANY INTELLIGENCE

Company Intelligence

Source-linked public-record timelines. Every line is dated and links to its source.

OBSERVED · LAST GOOD CHECK

INDEX SX 10-A

Pilots

EXHIBIT SX 06-A // STATE RECORD GRID // 0° · 45° · 90°

State index

OBSERVED · LAST GOOD CHECK

  • GA →
    ENACTED 0 · STATED 0 · SITES 0 · GRID SOCO
  • TX →
    ENACTED 1 · STATED 0 · SITES 2 · GRID ERCO
  • VA →
    ENACTED 1 · STATED 0 · SITES 0 · GRID PJM

INDEX SX 07 // COMPANIES

Entity index

Entity index
Name (EDGAR)StatusRole
Applied Digital Corp.
CIK 0001144879
STUBHOST
Cipher Digital Inc.
CIK 0001819989
FULLHOST
Constellation Energy Corp
CIK 0001868275
STUBPOWER
Core Scientific, Inc./tx
CIK 0001839341
STUBHOST
CoreWeave, Inc.
CIK 0001769628
STUBHOST
DIGITAL REALTY TRUST, INC.
CIK 0001297996
STUBLANDLORD
EQUINIX INC
CIK 0001101239
STUBLANDLORD
IREN Ltd
CIK 0001878848
STUBHOST
NRG ENERGY, INC.
CIK 0001013871
STUBPOWER
ORACLE CORP
CIK 0001341439
STUBCLOUD
Vertiv Holdings Co
CIK 0001674101
STUBEQUIPMENT
Vistra Corp.
CIK 0001692819
STUBPOWER

FULL = reviewed source-linked sections on file. STUB = identity and filings only; sections appear after records pass review.

LATEST RECORDS // PASSED REVIEW

Latest gated records

OBSERVED · LAST GOOD CHECK

  1. RECORD SX 07-A // SITES // FILED 2026-11-02

    COMPANY DISCLOSURE

    Black Pearl Facility -- 300 MW -- Wink, Texas -- bitcoin mining through February 2026; phased delivery to an HPC tenant commenced August 2026

    Cipher Digital Inc.BASIS · REGULATOR-HOSTED FILINGSOURCE · Cipher Digital Inc. — 10-Q Note 1 · SEC EDGARRECORD DATE · v1
    Verbatim quote and source
    The Company has a 300 MW data center in Wink, Texas that draws power from the power grid (the “Black Pearl Facility”) that was used for bitcoin mining through February 2026, and in August 2026 commenced phased delivery to an HPC tenant.

    10-Q Note 1, Nature of operations · Original source ↗

    Cite: Seraphix Systems, “SX-07-A-0001”, v1, https://seraphixsystems.com/r/SX-07-A-0001, retrieved . · JSON

  2. RECORD SX 07-A // SITES // FILED 2026-11-02

    COMPANY DISCLOSURE

    Barber Lake Facility -- 300 MW -- for Fluidstack USA II Inc. -- company expects phased commencement in Q4 2026

    Cipher Digital Inc.BASIS · REGULATOR-HOSTED FILINGSOURCE · Cipher Digital Inc. — 10-Q Note 1 · SEC EDGARRECORD DATE · v1EXPECTATION · COMPANY-STATED
    Verbatim quote and source
    the 300 MW Barber Lake Facility for Fluidstack USA II Inc. (“Fluidstack”), expecting phased commencement in the fourth quarter of 2026

    10-Q Note 1, Nature of operations · Original source ↗

    Cite: Seraphix Systems, “SX-07-A-0002”, v1, https://seraphixsystems.com/r/SX-07-A-0002, retrieved . · JSON

  3. RECORD SX 07-A // SITES // FILED 2026-11-02

    COMPANY DISCLOSURE

    Stingray Facility -- 100 MW -- company expects commencement in 2027

    Cipher Digital Inc.BASIS · REGULATOR-HOSTED FILINGSOURCE · Cipher Digital Inc. — 10-Q Note 1 · SEC EDGARRECORD DATE · v1EXPECTATION · COMPANY-STATED
    Verbatim quote and source
    the 100 MW Stingray data center (the “Stingray Facility”) expecting commencement in 2027

    10-Q Note 1, Nature of operations · Original source ↗

    Cite: Seraphix Systems, “SX-07-A-0003”, v1, https://seraphixsystems.com/r/SX-07-A-0003, retrieved . · JSON

  4. RECORD SX 07-A // SITES // FILED 2026-11-02

    COMPANY DISCLOSURE

    Odessa Facility -- 207 MW -- Odessa, Texas -- wholly owned bitcoin mining data center

    Cipher Digital Inc.BASIS · REGULATOR-HOSTED FILINGSOURCE · Cipher Digital Inc. — 10-Q Note 1 · SEC EDGARRECORD DATE · v1
    Verbatim quote and source
    The Company also operates one wholly owned bitcoin mining data center, a 207 MW site located in Odessa, Texas that draws fixed priced power from a power purchase agreement with its electricity provider (the “Odessa Facility”).

    10-Q Note 1, Nature of operations · Original source ↗

    Cite: Seraphix Systems, “SX-07-A-0004”, v1, https://seraphixsystems.com/r/SX-07-A-0004, retrieved . · JSON

  5. RECORD SX 07-A // SITES // FILED 2026-11-02

    COMPANY DISCLOSURE

    Seven additional sites expected to be built out for HPC

    Cipher Digital Inc.BASIS · REGULATOR-HOSTED FILINGSOURCE · Cipher Digital Inc. — 10-Q Note 1 · SEC EDGARRECORD DATE · v1EXPECTATION · COMPANY-STATED
    Verbatim quote and source
    The Company’s portfolio as of September 30, 2026 also consists of seven additional sites expected to be built out for HPC.

    10-Q Note 1, Nature of operations · Original source ↗

    Cite: Seraphix Systems, “SX-07-A-0005”, v1, https://seraphixsystems.com/r/SX-07-A-0005, retrieved . · JSON

  6. RECORD SX 09-TX // STATUTE // SIGNED 2025-06-20

    ENACTED

    SB 6 (89th Legislature) -- large-load interconnection standards; demand threshold of 75 MW in the ERCOT region

    TXBASIS · STATUTE (ENROLLED TEXT + LEGISLATIVE HISTORY)SOURCE · SB 6 (89th Legislature), enrolled text · Texas Legislature OnlineRECORD DATE · v1
    Verbatim quote and source
    The commission shall establish a demand threshold of 75 megawatts unless the commission determines that a lower threshold is necessary to accomplish the purposes described by Subsection (b).

    SB 6 enrolled text, Sec. 37.0561(c) · Original source ↗

    Cite: Seraphix Systems, “SX-09-TX-0002”, v1, https://seraphixsystems.com/r/SX-09-TX-0002, retrieved . · JSON

  7. RECORD SX 09-GA // VETO // REPORTED 2024-05-11

    REPORTED · PRIMARY PENDING

    Governor vetoed HB 1192 (2024 session), listed as Veto 7 in the Governor's 2024 veto messages. Per the veto message, the bill would have imposed a two-year pause on issuing sales and use tax exemption certificates to high-technology data centers and data center customers, cutting off new certificates after July 1, 2024 for many customers of projects already in development. Stated reason: the legislature had extended these exemptions two years earlier through 2031, and the pause would undermine investments made in reliance on that extension.

    GABASIS · AGENCY RECORDSOURCE · Governor Brian P. Kemp · Office of the Governor of GeorgiaRECORD DATE · v1
    Verbatim quote and source
    House Bill 1192 would implement a two-year pause on the issuance of sales and use tax exemption certificates to high-technology data centers and data center customers. Only two years ago the legislature extended these tax exemptions for an additional three years, through 2031. The bill’s language would prevent the issuance of exemption certificates after an abrupt July 1, 2024 deadline for many customers of projects that are already in development—undermining the investments made by high-technology data center operators, customers, and other stakeholders in reliance on the recent extension, and inhibiting important infrastructure and job development. For the foregoing reasons, I VETO HOUSE BILL 1192.

    Governor Brian P. Kemp, 2024 Session of the Georgia General Assembly, Veto Messages (PDF), VETO 7, page 3 of 5 · Original source ↗

    Cite: Seraphix Systems, “SX-09-GA-01”, v1, https://seraphixsystems.com/r/SX-09-GA-01, retrieved . · JSON

  8. RECORD SX 09-VA // STATUTE // EFFECTIVE 2010-07-01

    ENACTED

    Sales and use tax exemption for computer equipment and enabling software purchased or leased for use in a qualifying data center, applying to the data center operator and the tenants of the data center collectively, running from July 1, 2010 to June 30, 2035, with extensions available under subdivision 19. Thresholds include $150 million of capital investment and 50 new jobs paying at least 1.5 times the local prevailing wage; lower thresholds apply in distressed localities.

    VABASIS · OFFICIAL CODESOURCE · Code of Virginia § 58.1-609.3 · Virginia Legislative Information System (Code of Virginia)RECORD DATE · v1
    Verbatim quote and source
    Beginning July 1, 2010, and ending June 30, 2035

    Code of Virginia § 58.1-609.3, subdivision 18 a · Original source ↗

    Cite: Seraphix Systems, “SX-09-VA-01”, v1, https://seraphixsystems.com/r/SX-09-VA-01, retrieved . · JSON

Coverage

OBSERVED · LAST GOOD CHECK

Source coverage and last good check
SourceCoverageLast good check
SEC EDGAR · filingsOBSERVED

Filings for every pilot entity

EIA-930 · hourly grid demandOBSERVED

ERCO, PJM, SOCO balancing areas

Statutes, codes + executive actionsOBSERVED · MANUAL

Primary text for ENACTED records in pilot states

Press · secondaryOBSERVED · MANUAL

Named outlets only; replaced when a primary is attached

State utility commission docketsNOT MONITORED

PUCT, Georgia PSC, Virginia SCC

Not stated in source
Large-load interconnection queuesNOT MONITORED

ERCOT, PJM, Georgia Power

Not stated in source
Environmental + local permitsNOT MONITORED

TCEQ, Georgia EPD, Virginia DEQ, local land use

Not stated in source
State + county incentive agreementsNOT MONITORED

Comptroller, revenue departments, county abatements

Not stated in source

Method

How a record ships →