Grid demand EXHIBIT SX 05-A // U.S. GRID DEMAND, HOURLY // EIA-930 ERCO OBSERVED · LAST GOOD CHECK 2026-11-04, 20:07 ET
ERCO — 30 real calendar days of EIA-930 hourly demand. Gaps remain open. Regional demand is not data-center demand. SHAPE ONLY · SCALED PER REGION · Lines break at day boundaries and missing hours.
Grid strokes and counts use the gated record set. Other sourced policy records below are not added to that grid.
Enacted vs stated ENACTED Primary document attached
RECORD SX 09-TX // STATUTE // SIGNED 2025-06-20
ENACTED SB 6 (89th Legislature) -- large-load interconnection standards; demand threshold of 75 MW in the ERCOT region
Verbatim quote and source The commission shall establish a demand threshold of 75 megawatts unless the commission determines that a lower threshold is necessary to accomplish the purposes described by Subsection (b). SB 6 enrolled text, Sec. 37.0561(c) · Original source ↗
Cite: Seraphix Systems, “SX-09-TX-0002”, v1, https://seraphixsystems.com/r/SX-09-TX-0002 , retrieved 2026-11-05 . · JSON
REPORTED · PRIMARY PENDING
OBSERVED · LAST GOOD CHECK 2026-11-04, 20:27 ET
Open utility dockets NOT MONITORED Docket sources are not monitored. This is not a zero.
Who has sites here RECORD SX 07-A // SITES // FILED 2026-11-02
COMPANY DISCLOSURE Black Pearl Facility -- 300 MW -- Wink, Texas -- bitcoin mining through February 2026; phased delivery to an HPC tenant commenced August 2026
Verbatim quote and source The Company has a 300 MW data center in Wink, Texas that draws power from the power grid (the “Black Pearl Facility”) that was used for bitcoin mining through February 2026, and in August 2026 commenced phased delivery to an HPC tenant. 10-Q Note 1, Nature of operations · Original source ↗
Cite: Seraphix Systems, “SX-07-A-0001”, v1, https://seraphixsystems.com/r/SX-07-A-0001 , retrieved 2026-11-05 . · JSON
RECORD SX 07-A // SITES // FILED 2026-11-02
COMPANY DISCLOSURE Odessa Facility -- 207 MW -- Odessa, Texas -- wholly owned bitcoin mining data center
Verbatim quote and source The Company also operates one wholly owned bitcoin mining data center, a 207 MW site located in Odessa, Texas that draws fixed priced power from a power purchase agreement with its electricity provider (the “Odessa Facility”). 10-Q Note 1, Nature of operations · Original source ↗
Cite: Seraphix Systems, “SX-07-A-0004”, v1, https://seraphixsystems.com/r/SX-07-A-0004 , retrieved 2026-11-05 . · JSON
Coverage OBSERVED · LAST GOOD CHECK 2026-11-04, 20:45 ET
Source coverage and last good check Source Coverage Last good check SEC EDGAR · filings OBSERVED Filings for every pilot entity
2026-11-04, 20:45 ET EIA-930 · hourly grid demand OBSERVED ERCO, PJM, SOCO balancing areas
2026-11-04, 20:07 ET Statutes, codes + executive actions OBSERVED · MANUAL Primary text for ENACTED records in pilot states
2026-11-04 Press · secondary OBSERVED · MANUAL Named outlets only; replaced when a primary is attached
2026-11-04 State utility commission dockets NOT MONITORED PUCT, Georgia PSC, Virginia SCC
Not stated in source Large-load interconnection queues NOT MONITORED ERCOT, PJM, Georgia Power
Not stated in source Environmental + local permits NOT MONITORED TCEQ, Georgia EPD, Virginia DEQ, local land use
Not stated in source State + county incentive agreements NOT MONITORED Comptroller, revenue departments, county abatements
Not stated in source