SB 6 (89th Legislature) -- large-load interconnection standards; demand threshold of 75 MW in the ERCOT region

Record

RECORD SX 09-TX // STATUTE // SIGNED 2025-06-20

ENACTED

SB 6 (89th Legislature) -- large-load interconnection standards; demand threshold of 75 MW in the ERCOT region

TXBASIS · STATUTE (ENROLLED TEXT + LEGISLATIVE HISTORY)SOURCE · SB 6 (89th Legislature), enrolled text · Texas Legislature OnlineRECORD DATE · v1
Verbatim quote and source
The commission shall establish a demand threshold of 75 megawatts unless the commission determines that a lower threshold is necessary to accomplish the purposes described by Subsection (b).

SB 6 enrolled text, Sec. 37.0561(c) · Original source ↗

Cite: Seraphix Systems, “SX-09-TX-0002”, v1, https://seraphixsystems.com/r/SX-09-TX-0002, retrieved . · JSON

Basis
STATUTE (ENROLLED TEXT + LEGISLATIVE HISTORY)
Primary document
SB 6 (89th Legislature), enrolled text
occurred
reported
Not stated in source
source published
first seen
Not stated in source
ingested
corrected
Not stated in source

Version history

  1. v1 (current) SB 6 (89th Legislature) -- large-load interconnection standards; demand threshold of 75 MW in the ERCOT region

Coverage

OBSERVED · LAST GOOD CHECK