Seraphix SystemsCompany IntelligenceDashboardDossier pilot · In development

RECORD SX 07-A // SITES // FILED 2026-02-05

SX-07-A-0463

COMPANY DISCLOSURE

Canal Flats -- 30 MW -- operating

Record

RECORD SX 07-A // SITES // FILED 2026-02-05

COMPANY DISCLOSURE

Canal Flats -- 30 MW -- operating

IREN LtdBASIS · REGULATOR-HOSTED FILINGSOURCE · IREN Ltd — 10-Q Item 1A. Risk (normalized-text offset 144684) · SEC EDGARRECORD DATE · v1
Verbatim quote and source
Our 30MW Canal Flats site was acquired from PodTech Innovation Inc. and certain of its related parties in January 2020, and has been operating since 2019.

10-Q Item 1A. Risk (normalized-text offset 144684) · Original source ↗

Cite: Seraphix Systems, “SX-07-A-0463”, v1, https://seraphixsystems.com/r/SX-07-A-0463, retrieved . · JSON

Basis
REGULATOR-HOSTED FILING
Primary document
IREN Ltd — 10-Q Item 1A. Risk (normalized-text offset 144684)
occurred
Not stated in source
reported
Not stated in source
source published
first seen
Not stated in source
ingested
corrected
Not stated in source

History

Other dated filings stating this, newest first

  1. Canal Flats, British Columbia, Canada 30MW

    · 10-K · SEC EDGAR ↗

  2. We have seven data center sites with executed grid connection agreements, letters of agreement or equivalents, representing 4,510MW of total power capacity: three in Texas, United States, namely Childress (750MW), Sweetwater 1 (1,400MW) and Sweetwater 2 (600MW), one in Oklahoma (1,600MW), United States, and three in British Columbia, Canada, namely Canal Flats (30MW), Mackenzie (80MW) and Prince George (50MW)

    · 10-Q · SEC EDGAR ↗

Version history

  1. v1 (current) Canal Flats -- 30 MW -- operating

Coverage

OBSERVED · LAST GOOD CHECK