What the public record set holds right now: reviewed records, the companies and states covered, and SEC filings as SEC accepts them. Every number here is computed from the published data on each request.
SX 11-A // WIRE SX 03 // EDGAR // LATEST 25
Live filings
OBSERVED · LAST GOOD CHECK
LIVE · AS OF · TIMES ARE SEC ACCEPTANCE, ET
- 10-QFILING→ SEC
- 8-KItem 2.02 Results of Operations and Financial Condition · Item 9.01 Financial Statements and Exhibits→ SEC
- 10-QFILING→ SEC
- 8-KItem 2.02 Results of Operations and Financial Condition · Item 7.01 Regulation FD Disclosure · Item 9.01 Financial Statements and Exhibits→ SEC
- 8-KItem 2.01 Completion of Acquisition or Disposition of Assets · Item 2.03 Creation of a Direct Financial Obligation or an Obligation under an Off-Balance Sheet Arrangement of a Registrant · Item 3.02 Unregistered Sales of Equity Securities · Item 7.01 Regulation FD Disclosure · Item 9.01 Financial Statements and Exhibits→ SEC
- 424B2FILING→ SEC
- 8-KItem 8.01 Other Events · Item 9.01 Financial Statements and Exhibits→ SEC
- 424B5FILING→ SEC
- 424B2FILING→ SEC
- 424B5FILING→ SEC
- 10-QFILING→ SEC
- 424B5FILING→ SEC
- 424B2FILING→ SEC
- S-3ASRFILING→ SEC
- 8-KItem 2.02 Results of Operations and Financial Condition · Item 7.01 Regulation FD Disclosure · Item 9.01 Financial Statements and Exhibits→ SEC
- 8-KItem 8.01 Other Events · Item 9.01 Financial Statements and Exhibits→ SEC
- 424B7FILING→ SEC
- 10-QFILING→ SEC
- 8-KItem 2.02 Results of Operations and Financial Condition · Item 7.01 Regulation FD Disclosure · Item 9.01 Financial Statements and Exhibits→ SEC
- S-3ASRFILING→ SEC
- S-3ASRFILING→ SEC
- 10-QFILING→ SEC
- 10-QFILING→ SEC
- 8-KItem 2.02 Results of Operations and Financial Condition · Item 9.01 Financial Statements and Exhibits→ SEC
- 8-KItem 7.01 Regulation FD Disclosure · Item 9.01 Financial Statements and Exhibits→ SEC
SX 11-B // NEW RECORDS + NEW VERSIONS // SINCE 2026-10-31
What changed this week
OBSERVED · LAST GOOD CHECK
- NEW RECORDSX-07-A-0001 · Seraphix record · Cipher DigitalCOMPANY DISCLOSURE
Black Pearl Facility -- 300 MW -- Wink, Texas -- bitcoin mining through February 2026; phased delivery to an HPC tenant commenced August 2026
History → - NEW RECORDSX-07-A-0002 · Seraphix record · Cipher DigitalCOMPANY DISCLOSURE
Barber Lake Facility -- 300 MW -- for Fluidstack USA II Inc. -- company expects phased commencement in Q4 2026
History → - NEW RECORDSX-07-A-0003 · Seraphix record · Cipher DigitalCOMPANY DISCLOSURE
Stingray Facility -- 100 MW -- company expects commencement in 2027
History → - NEW RECORDSX-07-A-0004 · Seraphix record · Cipher DigitalCOMPANY DISCLOSURE
Odessa Facility -- 207 MW -- Odessa, Texas -- wholly owned bitcoin mining data center
History → - NEW RECORDSX-07-A-0005 · Seraphix record · Cipher DigitalCOMPANY DISCLOSURE
Seven additional sites expected to be built out for HPC
- NEW RECORDSX-07-A-0049 · Seraphix record · Applied DigitalCOMPANY DISCLOSURE
Delta Forge 2 -- 210 MW -- its southern region -- under construction
History → - NEW RECORDSX-07-A-0055 · Seraphix record · Applied DigitalCOMPANY DISCLOSURE
Our two buildings at our Polaris Forge 2 campus -- 300 MW -- under construction
History → - NEW RECORDSX-07-A-0056 · Seraphix record · Applied DigitalCOMPANY DISCLOSURE
Our two buildings at our Polaris Forge 3 campus -- 300 MW -- under construction
History → - NEW RECORDSX-07-A-0057 · Seraphix record · Applied DigitalCOMPANY DISCLOSURE
Our two buildings at our Delta Forge 1 campus -- 300 MW -- under construction
History → - NEW RECORDSX-07-A-0064 · Seraphix record · Cipher DigitalCOMPANY DISCLOSURE
Colchis Site -- Texas -- development (potential 1 GW site)
History → - NEW RECORDSX-07-A-0110 · Seraphix record · CoreWeaveCOMPANY DISCLOSURE
multi-phase data center campus -- Kenilworth, New Jersey -- development
History → - NEW RECORDSX-07-A-0137 · Seraphix record · Applied DigitalCOMPANY DISCLOSURE
Jamestown -- 106 MW -- North Dakota -- operating (hosting site)
History → - NEW RECORDSX-07-A-0170 · Seraphix record · Core ScientificCOMPANY DISCLOSURE
Muskogee, Oklahoma data center -- Muskogee, Oklahoma -- operating
History → - NEW RECORDSX-07-A-0172 · Seraphix record · Core ScientificCOMPANY DISCLOSURE
Pecos, TX -- Pecos, TX
- NEW RECORDSX-07-A-0175 · Seraphix record · Core ScientificCOMPANY DISCLOSURE
Auburn, AL -- Auburn, AL
- NEW RECORDSX-07-A-0179 · Seraphix record · Core ScientificCOMPANY DISCLOSURE
Hunt County, Texas -- 430 MW -- Hunt County, Texas -- development
History → - NEW RECORDCOMPANY DISCLOSURE
Childress campus -- operating (currently supporting Bitcoin mining operations)
History → - NEW RECORDSX-07-A-0217 · Seraphix record · Core ScientificCOMPANY DISCLOSURE
Denton, Texas -- Denton, Texas -- operating (data center)
History → - NEW RECORDSX-07-A-0218 · Seraphix record · Core ScientificCOMPANY DISCLOSURE
Marble, North Carolina -- Marble, North Carolina -- operating (data center)
History → - NEW RECORDSX-07-A-0254 · Seraphix record · Core ScientificCOMPANY DISCLOSURE
Austin, Texas -- Austin, Texas -- operating
History → - NEW RECORDSX-07-A-0316 · Seraphix record · Cipher DigitalCOMPANY DISCLOSURE
Ulysses Site -- 200 MW -- Ohio -- development (acquired a 200 MW data center site in Ohio)
- NEW RECORDSX-07-A-0319 · Seraphix record · Cipher DigitalCOMPANY DISCLOSURE
McLennan Site -- 500 MW -- central Texas -- development (estimated energization in 2028)
- NEW RECORDSX-07-A-0320 · Seraphix record · Cipher DigitalCOMPANY DISCLOSURE
Mikeska Site -- 500 MW -- West Texas -- development (estimated energization in 2028)
- NEW RECORDSX-07-A-0321 · Seraphix record · Cipher DigitalCOMPANY DISCLOSURE
Milsing Site -- 500 MW -- East Texas -- development (estimated energization between 2028 and 2029)
- NEW RECORDCOMPANY DISCLOSURE
Canal Flats -- 30 MW -- operating
History → - NEW RECORDCOMPANY DISCLOSURE
Mackenzie -- 80 MW -- operating (has been operating since April 2022)
History → - NEW RECORDCOMPANY DISCLOSURE
Prince George -- 50 MW -- operating (has been operating since September 2022)
History → - NEW RECORDSX-07-A-0485 · Seraphix record · Applied DigitalCOMPANY DISCLOSURE
first HPC data center at Polaris Forge 1 campus -- 100 MW -- Ellendale, North Dakota -- commenced operations in the prior fiscal year
History → - NEW RECORDSX-07-A-0486 · Seraphix record · Applied DigitalCOMPANY DISCLOSURE
second HPC data center at Polaris Forge 1 campus -- 150 MW -- began commencing operations; reached full 150MW capacity as of the 10-Q filing date
History → - NEW RECORDSX-07-A-0487 · Seraphix record · Applied DigitalCOMPANY DISCLOSURE
third HPC building at Polaris Forge 1 campus -- 150 MW -- under construction; full ready for service anticipated in calendar year 2027
History → - NEW RECORDSX-07-A-0488 · Seraphix record · Applied DigitalCOMPANY DISCLOSURE
180 MW facility in Ellendale, North Dakota -- 180 MW -- continues to operate at full capacity as of August 31, 2026
History → - NEW RECORDSX-07-A-0489 · Seraphix record · Cipher DigitalCOMPANY DISCLOSURE
1 additional HPC data center facility under a March 2026 hyperscaler lease at one of the Company's existing sites in Texas; phased delivery expected to begin in 2027 (10-Q Note 12, filed 2026-11-02)
History → - NEW RECORDSX-07-A-0490 · Seraphix record · Cipher DigitalCOMPANY DISCLOSURE
Reveille Facility -- LaSalle, Texas -- land lease (up to 52 acres) assumed October 2024 for the purpose of constructing a data center
History → - NEW RECORDSX-07-A-0491 · Seraphix record · Cipher DigitalCOMPANY DISCLOSURE
Currently developing 700 MW of HPC data center facilities across three sites for hyperscaler tenants (10-Q MD&A, filed 2026-11-02)
History → - NEW RECORDSX-07-A-0492 · Seraphix record · Cipher DigitalCOMPANY DISCLOSURE
Grid pipeline of approximately 3.4 GW across six sites in Texas and one additional site in Ohio (10-Q MD&A, filed 2026-11-02)
History → - NEW RECORDSX-07-A-0493 · Seraphix record · Digital RealtyCOMPANY DISCLOSURE
August 2026 DCREIT agreements: DCREIT to acquire an additional 25% interest in a data center in Osaka, Japan and a 2.5% interest in a data center in Singapore from subsidiaries of the Company; subsidiaries of the Company to acquire DCREIT's 90% interest in data centers in Los Angeles and Toronto and a 39% interest in a data center in Northern Virginia; expected to close in the fourth quarter (10-Q, filed 2026-10-30)
History → - NEW RECORDSX-07-A-0494 · Seraphix record · Digital RealtyCOMPANY DISCLOSURE
Two data centers and associated land in Cyberjaya, Malaysia acquired for $137 million during the three months ended June 30, 2026 (10-Q, filed 2026-10-30)
History → - NEW RECORDSX-07-A-0495 · Seraphix record · Digital RealtyCOMPANY DISCLOSURE
Digital Dulles campus -- development projects contributed to the joint venture with Blackstone in April 2025 (gross proceeds approximately $77 million)
- NEW RECORDSX-07-A-0496 · Seraphix record · EquinixCOMPANY DISCLOSURE
Asia-Pacific 4 Joint Venture (10% ownership interests) to purchase the assets and liabilities of two data centers in Greater Tokyo, Japan from the Asia-Pacific 1 Joint Venture; closed October 1, 2026 (10-Q, filed 2026-10-28)
- NEW RECORDCOMPANY DISCLOSURE
Horizon 1 -- Childress, Texas -- delivered to, and accepted by, Microsoft in August 2026
History → - NEW RECORDCOMPANY DISCLOSURE
Horizon 2 -- Childress, Texas -- targeted for delivery in phases in calendar Q4 2026
History → - NEW RECORDCOMPANY DISCLOSURE
Horizon 3 -- Childress, Texas -- targeted for delivery in phases in calendar Q4 2026
History → - NEW RECORDCOMPANY DISCLOSURE
Horizon 4 -- Childress, Texas -- targeted for delivery in phases in calendar Q4 2026
History → - NEW RECORDSX-07-A-0501 · Seraphix record · CoreWeaveCOMPANY DISCLOSURE
Lease for various buildings at a single unnamed site intended to be used as a data center; 393 MW of electrical power undelivered as of June 30, 2026, expected in phases in 2026 and 2028 (10-Q, filed 2026-08-12)
History → - NEW RECORDSX-07-A-0502 · Seraphix record · CoreWeaveCOMPANY DISCLOSURE
Data center to be designed, built and managed by a data center service provider, providing access to up to 78 MW of electrical power delivered in phases (DCSP Service Agreement; 10-Q, filed 2026-08-12)
- NEW RECORDSX-07-A-0503 · Seraphix record · Cipher DigitalCOMPANY DISCLOSURE
Option agreement (July 23, 2026) to acquire a 900 MW site in Texas (10-Q, filed 2026-08-04)
History → - NEW RECORDSX-07-A-0504 · Seraphix record · Digital RealtyCOMPANY DISCLOSURE
Astra Enterprise Park -- near Kansas City -- approximately 1,440 acres of development land acquired in April 2026
- NEW RECORDSX-07-A-0505 · Seraphix record · Applied DigitalCOMPANY DISCLOSURE
Polaris Forge 1 -- Ellendale, North Dakota -- campus being developed in phases
History → - NEW RECORDSX-07-A-0506 · Seraphix record · Core ScientificCOMPANY DISCLOSURE
Approximately 40-acre site adjacent to the Muskogee, Oklahoma data center (Polaris DS LLC, with electrical substation) -- Agreement and Plan of Merger to acquire, May 5, 2026; electric service agreements for up to 440 MW of gross utility power capacity
History → - NEW RECORDSX-07-A-0507 · Seraphix record · Core ScientificCOMPANY DISCLOSURE
Dalton Phase 3 -- GA -- site under the Neocloud lease agreements (fifteen-year term, three five-year options; 152 MW of critical IT capacity across the Auburn, AL and Dalton Phase 3, GA sites)
- NEW RECORDSX-07-A-0508 · Seraphix record · OracleCOMPANY DISCLOSURE
Approximately 181 data center locations globally, substantially all leased, used to deliver Oracle Cloud offerings (10-K, filed 2026-06-22)
- NEW RECORDCOMPANY DISCLOSURE
Horizons 5 and 6 at the Childress campus -- 150 MW -- development of additional direct-to-chip liquid cooling data centers
- NEW RECORDCOMPANY DISCLOSURE
Agreement (May 7, 2026) to acquire Nostrum Group, a Spanish data center developer, adding approximately 490MW of power capacity in Spain (10-Q, filed 2026-05-08)
- NEW RECORDSX-07-A-0511 · Seraphix record · CoreWeaveCOMPANY DISCLOSURE
43 data centers supported by over 850 MW of active power as of December 31, 2025 (up from 10 data centers / 70 MW at end-2023 and 32 / more than 360 MW at end-2024) (10-K, filed 2026-03-02)
- NEW RECORDSX-07-A-0512 · Seraphix record · Core ScientificCOMPANY DISCLOSURE
Cottonwood 1 facility -- Texas -- the Debtors' facility mortgaged to secure a promissory note
History → - NEW RECORDSX-07-A-0513 · Seraphix record · Core ScientificCOMPANY DISCLOSURE
Cedarvale Facility -- Ward County, Texas -- bitcoin mining data center site of the Debtors; sale to Celsius of the site and certain related assets
History → - NEW RECORDSX-07-A-0514 · Seraphix record · Cipher DigitalCOMPANY DISCLOSURE
Alborz Facility -- 40 MW bitcoin mining data center (WindHQ JV) -- 49% equity interest held from 2022; interest sold February 19, 2026
- NEW RECORDSX-07-A-0515 · Seraphix record · Cipher DigitalCOMPANY DISCLOSURE
Bear Facility -- 40 MW bitcoin mining data center (WindHQ JV) -- 49% equity interest held from 2022; interest sold February 19, 2026
- NEW RECORDSX-07-A-0516 · Seraphix record · Cipher DigitalCOMPANY DISCLOSURE
Chief Facility -- 40 MW bitcoin mining data center (WindHQ JV) -- 49% equity interest held from 2022; interest sold February 19, 2026
- NEW RECORDSX-07-A-0517 · Seraphix record · Digital RealtyCOMPANY DISCLOSURE
Teraco (majority interest acquired August 1, 2022): in-service portfolio of seven data centers in Johannesburg, Cape Town and Durban (10-K, filed 2026-02-13)
- NEW RECORDSX-07-A-0518 · Seraphix record · Digital RealtyCOMPANY DISCLOSURE
BDIA joint venture (formed March 2025, 50% interest): two land parcels and two buildings in Jakarta, Indonesia that can support up to approximately 32 megawatts of IT load (10-K, filed 2026-02-13)
- NEW RECORDSX-07-A-0519 · Seraphix record · Digital RealtyCOMPANY DISCLOSURE
Frankfurt, Germany data center: sale to DCREIT of an additional 15.1% interest closed December 2024 (approximately $77 million); facility derecognized (10-K, filed 2026-02-13)
History → - NEW RECORDSX-07-A-0520 · Seraphix record · Digital RealtyCOMPANY DISCLOSURE
Blackstone joint venture (formed January 11, 2024) to develop four hyperscale data center campuses across Frankfurt, Paris and Northern Virginia, planned to support 10 data centers with approximately 500 MW of potential IT load; first phase closed on campuses in Paris and Northern Virginia, second phase closed Q4 2024 (10-K, filed 2026-02-13)
History → - NEW RECORDSX-07-A-0521 · Seraphix record · Digital RealtyCOMPANY DISCLOSURE
Cyxtera leases (January 2024): leases bought out in three data centers in Singapore and Frankfurt; Brookfield assumed the leases on three facilities previously leased to Cyxtera and amended the leases on three additional data centers in North America (10-K, filed 2026-02-13)
History → - NEW RECORDSX-07-A-0522 · Seraphix record · Digital RealtyCOMPANY DISCLOSURE
16-acre site in Paris acquired January 2024 ($80 million); the land consisted of two completed data centers and two data centers under construction (10-K, filed 2026-02-13)
History → - NEW RECORDSX-07-A-0523 · Seraphix record · Digital RealtyCOMPANY DISCLOSURE
Two data centers in the Slough Trading Estate acquired July 2024 for $200 million, combined capacity of 15 MW (10-K, filed 2026-02-13)
- NEW RECORDSX-07-A-0524 · Seraphix record · Digital RealtyCOMPANY DISCLOSURE
TPG Real Estate joint venture (July 25, 2023): TPG acquired an 80% interest in three stabilized hyperscale data center buildings in Northern Virginia contributed by the company (10-K, filed 2026-02-13)
History → - NEW RECORDSX-07-A-0525 · Seraphix record · Digital RealtyCOMPANY DISCLOSURE
Realty Income joint venture (November 10, 2023) to support the development of two data centers in Northern Virginia, 100% pre-leased prior to construction (10-K, filed 2026-02-13)
- NEW RECORDSX-07-A-0526 · Seraphix record · Digital RealtyCOMPANY DISCLOSURE
Mitsubishi joint venture (March 2024) to support the development of two data centers in the Dallas metro area (10-K, filed 2026-02-13)
- NEW RECORDSX-07-A-0527 · Seraphix record · EquinixCOMPANY DISCLOSURE
255 IBX data centers as of December 31, 2025 (Americas 109, EMEA 88, Asia-Pacific 58; excludes 25 unconsolidated data centers), located in the metros listed in the 10-K Item 2 locations table (10-K, filed 2026-02-11)
History → - NEW RECORDSX-07-A-0528 · Seraphix record · EquinixCOMPANY DISCLOSURE
16 new data centers opened in 2025 (including sites added via joint ventures and acquisitions) in Chennai, Chicago, Dublin, Frankfurt, Jakarta, Lisbon, Madrid, Manila, Monterrey, Mumbai, Salalah, São Paulo and Washington, D.C.; total data center facilities 280 (10-K, filed 2026-02-11)
History → - NEW RECORDSX-07-A-0529 · Seraphix record · EquinixCOMPANY DISCLOSURE
Acquisition of TIM NextGen DC Corporation, consisting of three data centers in the Philippines ($183 million) completed; entry into the Philippines market (10-K, filed 2026-02-11)
- NEW RECORDSX-07-A-0530 · Seraphix record · EquinixCOMPANY DISCLOSURE
Hampton data center campus -- greater Atlanta metro area -- assets and liabilities sold to the AMER 3 Joint Venture on January 13, 2026; total 25% economic interest in the joint venture
- NEW RECORDCOMPANY DISCLOSURE
Sweetwater 1 -- 1400 MW total planned power capacity (gross) -- Texas, United States -- listed among announced data center projects as of June 30, 2026
- NEW RECORDCOMPANY DISCLOSURE
Sweetwater 2 -- 600 MW total planned power capacity (gross) -- Texas, United States -- listed among announced data center projects as of June 30, 2026
- NEW RECORDCOMPANY DISCLOSURE
Kiowa -- 1600 MW total planned power capacity (gross) -- Oklahoma, United States -- listed among announced data center projects as of June 30, 2026
- NEW RECORDCOMPANY DISCLOSURE
Bundey -- 800 MW total planned power capacity (gross) -- South Australia, Australia -- listed among announced data center projects as of June 30, 2026
- NEW RECORDCOMPANY DISCLOSURE
Badajoz -- 300 MW total planned power capacity (gross) -- Extremadura, Spain -- listed among announced data center projects as of June 30, 2026
- NEW RECORDSX-07-A-0536 · Seraphix record · Digital RealtyCOMPANY DISCLOSURE
9905 Godwin Drive -- Northern Virginia -- data center site with LEED Gold level achieved in 2025 (10-K sustainability table)
- NEW RECORDSX-07-A-0537 · Seraphix record · Digital RealtyCOMPANY DISCLOSURE
805 E. Holford Road -- Dallas -- data center site with LEED Gold level achieved in 2025 (10-K sustainability table)
- NEW RECORDSX-07-A-0538 · Seraphix record · Digital RealtyCOMPANY DISCLOSURE
10051 Brickyard Way -- Northern Virginia -- data center site with LEED Gold level achieved in 2025 (10-K sustainability table)
- NEW RECORDSX-07-A-0539 · Seraphix record · Digital RealtyCOMPANY DISCLOSURE
2 Avenue Marcel Cachin (PAR10) -- Paris, France -- data center site with LEED Silver level achieved in 2025 (10-K sustainability table)
- NEW RECORDSX-07-A-0540 · Seraphix record · Digital RealtyCOMPANY DISCLOSURE
Mercuriusstraat 27 (BRU4) -- Brussels, Belgium -- data center site with LEED Silver level achieved in 2025 (10-K sustainability table)
- NEW RECORDSX-07-A-0541 · Seraphix record · Digital RealtyCOMPANY DISCLOSURE
2 Avenue Marcel Cachin (PAR11) -- Paris, France -- data center site with LEED Gold level achieved in 2025 (10-K sustainability table)
- NEW RECORDSX-07-A-0542 · Seraphix record · EquinixCOMPANY DISCLOSURE
NY11 phase 5 -- New York -- IBX data center project under construction as of December 31, 2025; target open date Q1 2026 (10-K, filed 2026-02-11)
- NEW RECORDSX-07-A-0543 · Seraphix record · EquinixCOMPANY DISCLOSURE
RJ3 phase 2 -- Rio de Janeiro -- IBX data center project under construction as of December 31, 2025; target open date Q4 2026 (10-K, filed 2026-02-11)
- NEW RECORDSX-07-A-0544 · Seraphix record · EquinixCOMPANY DISCLOSURE
SP7 phase 1 -- São Paulo -- IBX data center project under construction as of December 31, 2025; target open date Q4 2026 (10-K, filed 2026-02-11)
- NEW RECORDSX-07-A-0545 · Seraphix record · EquinixCOMPANY DISCLOSURE
SP4 phase 5 -- São Paulo -- IBX data center project under construction as of December 31, 2025; target open date Q2 2027 (10-K, filed 2026-02-11)
- NEW RECORDSX-07-A-0546 · Seraphix record · EquinixCOMPANY DISCLOSURE
BG2 phase 2 -- Bogotá -- IBX data center project under construction as of December 31, 2025; target open date Q2 2026 (10-K, filed 2026-02-11)
- NEW RECORDSX-07-A-0547 · Seraphix record · EquinixCOMPANY DISCLOSURE
SV18 phase 1 -- Silicon Valley -- IBX data center project under construction as of December 31, 2025; target open date Q2 2026 (10-K, filed 2026-02-11)
- NEW RECORDSX-07-A-0548 · Seraphix record · EquinixCOMPANY DISCLOSURE
MI1 redevelopment -- Miami -- IBX data center project under construction as of December 31, 2025; target open date Q3 2026 (10-K, filed 2026-02-11)
- NEW RECORDSX-07-A-0549 · Seraphix record · EquinixCOMPANY DISCLOSURE
DC17 phases 1 and 2 -- Washington, D.C. -- IBX data center project under construction as of December 31, 2025; target open date Q2 2027 (10-K, filed 2026-02-11)
- NEW RECORDSX-07-A-0550 · Seraphix record · EquinixCOMPANY DISCLOSURE
DC22 phase 2 -- Washington, D.C. -- IBX data center project under construction as of December 31, 2025; target open date Q2 2027 (10-K, filed 2026-02-11)
- NEW RECORDSX-07-B-0001 · Seraphix record · Applied DigitalCOMPANY DISCLOSURE
Power Purchase Agreement (October 4, 2026) with Base Electron for capacity and energy from an approximately 1,200 MW natural gas-fired generation facility to be developed in Center, North Dakota, intended to provide dedicated generation for the Polaris Forge 3 campus
- NEW RECORDSX-07-B-0002 · Seraphix record · Applied DigitalCOMPANY DISCLOSURE
Energy services agreement for the Jamestown, North Dakota co-hosting facility (power commitment)
- NEW RECORDSX-07-B-0003 · Seraphix record · Core ScientificCOMPANY DISCLOSURE
Energy forward purchase contract (October 2023) for forecasted energy purchases at the Pecos, Texas facility, November 1, 2023 through May 31, 2024 ('Energy Derivatives')
- NEW RECORDSX-07-B-0004 · Seraphix record · Cipher DigitalCOMPANY DISCLOSURE
Luminant Power Agreement (power purchase agreement entered June 2021, amended and restated August 23, 2023) for the supply of electric power to the Odessa Facility: access until at least July 2027 at approximately 2.7 c/kWh (2.8 c/kWh from October 2025); take-or-pay for at least 66.7% of the full 207 MW capacity each year (10-K, filed 2026-02-24)
- NEW RECORDSX-07-B-0005 · Seraphix record · Cipher DigitalCOMPANY DISCLOSURE
Odessa Facility -- supply of a fixed amount of electric power from Luminant under the Luminant Power Agreement (entered June 23, 2021; term of five years, subject to certain early termination exemptions)
- NEW RECORDSX-07-B-0006 · Seraphix record · Cipher DigitalCOMPANY DISCLOSURE
Black Pearl Facility -- 300 MW data center in Wink, Texas -- draws power from the power grid
- NEW RECORDSX-07-B-0007 · Seraphix record · EquinixCOMPANY DISCLOSURE
29 power purchase agreements executed in 12 countries, 1,472 MW of new wind and solar capacity in the portfolio (as of December 31, 2025)
- NEW RECORDSX-07-B-0008 · Seraphix record · VistraCOMPANY DISCLOSURE
20-year PPA (options to extend up to an additional 20 years) with Amazon Web Services to supply 1,200 MW of carbon-free power from the Comanche Peak Nuclear Power Plant (announced September 2025)
- NEW RECORDSX-07-B-0009 · Seraphix record · VistraCOMPANY DISCLOSURE
20-year PPAs with Meta Platforms to supply 2,609 MW of carbon-free power and capacity from PJM nuclear power plants (announced January 2026)
- NEW RECORDSX-09-GA-01 · Seraphix record · GeorgiaREPORTED · PRIMARY PENDING
Governor vetoed HB 1192 (2024 session), listed as Veto 7 in the Governor's 2024 veto messages. Per the veto message, the bill would have imposed a two-year pause on issuing sales and use tax exemption certificates to high-technology data centers and data center customers, cutting off new certificates after July 1, 2024 for many customers of projects already in development. Stated reason: the legislature had extended these exemptions two years earlier through 2031, and the pause would undermine investments made in reliance on that extension.
- NEW RECORDSX-09-TX-0002 · Seraphix record · TexasENACTED
SB 6 (89th Legislature) -- large-load interconnection standards; demand threshold of 75 MW in the ERCOT region
- NEW RECORDSX-09-VA-01 · Seraphix record · VirginiaENACTED
Sales and use tax exemption for computer equipment and enabling software purchased or leased for use in a qualifying data center, applying to the data center operator and the tenants of the data center collectively, running from July 1, 2010 to June 30, 2035, with extensions available under subdivision 19. Thresholds include $150 million of capital investment and 50 new jobs paying at least 1.5 times the local prevailing wage; lower thresholds apply in distressed localities.
SX 11-C // RECORDS ON THIS PAGE
Search
All reviewed records · 105 · newest record date first
- v1SX-07-A-0001 · Seraphix record · Cipher DigitalCOMPANY DISCLOSURE
Black Pearl Facility -- 300 MW -- Wink, Texas -- bitcoin mining through February 2026; phased delivery to an HPC tenant commenced August 2026
History → - v1SX-07-A-0002 · Seraphix record · Cipher DigitalCOMPANY DISCLOSURE
Barber Lake Facility -- 300 MW -- for Fluidstack USA II Inc. -- company expects phased commencement in Q4 2026
History → - v1SX-07-A-0003 · Seraphix record · Cipher DigitalCOMPANY DISCLOSURE
Stingray Facility -- 100 MW -- company expects commencement in 2027
History → - v1SX-07-A-0004 · Seraphix record · Cipher DigitalCOMPANY DISCLOSURE
Odessa Facility -- 207 MW -- Odessa, Texas -- wholly owned bitcoin mining data center
History → - v1SX-07-A-0005 · Seraphix record · Cipher DigitalCOMPANY DISCLOSURE
Seven additional sites expected to be built out for HPC
- v1SX-07-A-0064 · Seraphix record · Cipher DigitalCOMPANY DISCLOSURE
Colchis Site -- Texas -- development (potential 1 GW site)
History → - v1SX-07-A-0489 · Seraphix record · Cipher DigitalCOMPANY DISCLOSURE
1 additional HPC data center facility under a March 2026 hyperscaler lease at one of the Company's existing sites in Texas; phased delivery expected to begin in 2027 (10-Q Note 12, filed 2026-11-02)
History → - v1SX-07-A-0490 · Seraphix record · Cipher DigitalCOMPANY DISCLOSURE
Reveille Facility -- LaSalle, Texas -- land lease (up to 52 acres) assumed October 2024 for the purpose of constructing a data center
History → - v1SX-07-A-0491 · Seraphix record · Cipher DigitalCOMPANY DISCLOSURE
Currently developing 700 MW of HPC data center facilities across three sites for hyperscaler tenants (10-Q MD&A, filed 2026-11-02)
History → - v1SX-07-A-0492 · Seraphix record · Cipher DigitalCOMPANY DISCLOSURE
Grid pipeline of approximately 3.4 GW across six sites in Texas and one additional site in Ohio (10-Q MD&A, filed 2026-11-02)
History → - v1SX-07-B-0005 · Seraphix record · Cipher DigitalCOMPANY DISCLOSURE
Odessa Facility -- supply of a fixed amount of electric power from Luminant under the Luminant Power Agreement (entered June 23, 2021; term of five years, subject to certain early termination exemptions)
- v1SX-07-B-0006 · Seraphix record · Cipher DigitalCOMPANY DISCLOSURE
Black Pearl Facility -- 300 MW data center in Wink, Texas -- draws power from the power grid
- v1SX-07-A-0493 · Seraphix record · Digital RealtyCOMPANY DISCLOSURE
August 2026 DCREIT agreements: DCREIT to acquire an additional 25% interest in a data center in Osaka, Japan and a 2.5% interest in a data center in Singapore from subsidiaries of the Company; subsidiaries of the Company to acquire DCREIT's 90% interest in data centers in Los Angeles and Toronto and a 39% interest in a data center in Northern Virginia; expected to close in the fourth quarter (10-Q, filed 2026-10-30)
History → - v1SX-07-A-0494 · Seraphix record · Digital RealtyCOMPANY DISCLOSURE
Two data centers and associated land in Cyberjaya, Malaysia acquired for $137 million during the three months ended June 30, 2026 (10-Q, filed 2026-10-30)
History → - v1SX-07-A-0495 · Seraphix record · Digital RealtyCOMPANY DISCLOSURE
Digital Dulles campus -- development projects contributed to the joint venture with Blackstone in April 2025 (gross proceeds approximately $77 million)
- v1SX-07-A-0496 · Seraphix record · EquinixCOMPANY DISCLOSURE
Asia-Pacific 4 Joint Venture (10% ownership interests) to purchase the assets and liabilities of two data centers in Greater Tokyo, Japan from the Asia-Pacific 1 Joint Venture; closed October 1, 2026 (10-Q, filed 2026-10-28)
- v1SX-07-A-0049 · Seraphix record · Applied DigitalCOMPANY DISCLOSURE
Delta Forge 2 -- 210 MW -- its southern region -- under construction
History → - v1SX-07-A-0055 · Seraphix record · Applied DigitalCOMPANY DISCLOSURE
Our two buildings at our Polaris Forge 2 campus -- 300 MW -- under construction
History → - v1SX-07-A-0056 · Seraphix record · Applied DigitalCOMPANY DISCLOSURE
Our two buildings at our Polaris Forge 3 campus -- 300 MW -- under construction
History → - v1SX-07-A-0057 · Seraphix record · Applied DigitalCOMPANY DISCLOSURE
Our two buildings at our Delta Forge 1 campus -- 300 MW -- under construction
History → - v1SX-07-A-0485 · Seraphix record · Applied DigitalCOMPANY DISCLOSURE
first HPC data center at Polaris Forge 1 campus -- 100 MW -- Ellendale, North Dakota -- commenced operations in the prior fiscal year
History → - v1SX-07-A-0486 · Seraphix record · Applied DigitalCOMPANY DISCLOSURE
second HPC data center at Polaris Forge 1 campus -- 150 MW -- began commencing operations; reached full 150MW capacity as of the 10-Q filing date
History → - v1SX-07-A-0487 · Seraphix record · Applied DigitalCOMPANY DISCLOSURE
third HPC building at Polaris Forge 1 campus -- 150 MW -- under construction; full ready for service anticipated in calendar year 2027
History → - v1SX-07-A-0488 · Seraphix record · Applied DigitalCOMPANY DISCLOSURE
180 MW facility in Ellendale, North Dakota -- 180 MW -- continues to operate at full capacity as of August 31, 2026
History → - v1SX-07-B-0001 · Seraphix record · Applied DigitalCOMPANY DISCLOSURE
Power Purchase Agreement (October 4, 2026) with Base Electron for capacity and energy from an approximately 1,200 MW natural gas-fired generation facility to be developed in Center, North Dakota, intended to provide dedicated generation for the Polaris Forge 3 campus
- v1COMPANY DISCLOSURE
Horizon 1 -- Childress, Texas -- delivered to, and accepted by, Microsoft in August 2026
History → - v1COMPANY DISCLOSURE
Horizon 2 -- Childress, Texas -- targeted for delivery in phases in calendar Q4 2026
History → - v1COMPANY DISCLOSURE
Horizon 3 -- Childress, Texas -- targeted for delivery in phases in calendar Q4 2026
History → - v1COMPANY DISCLOSURE
Horizon 4 -- Childress, Texas -- targeted for delivery in phases in calendar Q4 2026
History → - v1COMPANY DISCLOSURE
Sweetwater 1 -- 1400 MW total planned power capacity (gross) -- Texas, United States -- listed among announced data center projects as of June 30, 2026
- v1COMPANY DISCLOSURE
Sweetwater 2 -- 600 MW total planned power capacity (gross) -- Texas, United States -- listed among announced data center projects as of June 30, 2026
- v1COMPANY DISCLOSURE
Kiowa -- 1600 MW total planned power capacity (gross) -- Oklahoma, United States -- listed among announced data center projects as of June 30, 2026
- v1COMPANY DISCLOSURE
Bundey -- 800 MW total planned power capacity (gross) -- South Australia, Australia -- listed among announced data center projects as of June 30, 2026
- v1COMPANY DISCLOSURE
Badajoz -- 300 MW total planned power capacity (gross) -- Extremadura, Spain -- listed among announced data center projects as of June 30, 2026
- v1SX-07-A-0110 · Seraphix record · CoreWeaveCOMPANY DISCLOSURE
multi-phase data center campus -- Kenilworth, New Jersey -- development
History → - v1SX-07-A-0501 · Seraphix record · CoreWeaveCOMPANY DISCLOSURE
Lease for various buildings at a single unnamed site intended to be used as a data center; 393 MW of electrical power undelivered as of June 30, 2026, expected in phases in 2026 and 2028 (10-Q, filed 2026-08-12)
History → - v1SX-07-A-0502 · Seraphix record · CoreWeaveCOMPANY DISCLOSURE
Data center to be designed, built and managed by a data center service provider, providing access to up to 78 MW of electrical power delivered in phases (DCSP Service Agreement; 10-Q, filed 2026-08-12)
- v1SX-07-B-0008 · Seraphix record · VistraCOMPANY DISCLOSURE
20-year PPA (options to extend up to an additional 20 years) with Amazon Web Services to supply 1,200 MW of carbon-free power from the Comanche Peak Nuclear Power Plant (announced September 2025)
- v1SX-07-A-0503 · Seraphix record · Cipher DigitalCOMPANY DISCLOSURE
Option agreement (July 23, 2026) to acquire a 900 MW site in Texas (10-Q, filed 2026-08-04)
History → - v1SX-07-A-0504 · Seraphix record · Digital RealtyCOMPANY DISCLOSURE
Astra Enterprise Park -- near Kansas City -- approximately 1,440 acres of development land acquired in April 2026
- v1SX-07-A-0137 · Seraphix record · Applied DigitalCOMPANY DISCLOSURE
Jamestown -- 106 MW -- North Dakota -- operating (hosting site)
History → - v1SX-07-A-0505 · Seraphix record · Applied DigitalCOMPANY DISCLOSURE
Polaris Forge 1 -- Ellendale, North Dakota -- campus being developed in phases
History → - v1SX-07-B-0002 · Seraphix record · Applied DigitalCOMPANY DISCLOSURE
Energy services agreement for the Jamestown, North Dakota co-hosting facility (power commitment)
- v1SX-07-A-0170 · Seraphix record · Core ScientificCOMPANY DISCLOSURE
Muskogee, Oklahoma data center -- Muskogee, Oklahoma -- operating
History → - v1SX-07-A-0172 · Seraphix record · Core ScientificCOMPANY DISCLOSURE
Pecos, TX -- Pecos, TX
- v1SX-07-A-0175 · Seraphix record · Core ScientificCOMPANY DISCLOSURE
Auburn, AL -- Auburn, AL
- v1SX-07-A-0179 · Seraphix record · Core ScientificCOMPANY DISCLOSURE
Hunt County, Texas -- 430 MW -- Hunt County, Texas -- development
History → - v1SX-07-A-0506 · Seraphix record · Core ScientificCOMPANY DISCLOSURE
Approximately 40-acre site adjacent to the Muskogee, Oklahoma data center (Polaris DS LLC, with electrical substation) -- Agreement and Plan of Merger to acquire, May 5, 2026; electric service agreements for up to 440 MW of gross utility power capacity
History → - v1SX-07-A-0507 · Seraphix record · Core ScientificCOMPANY DISCLOSURE
Dalton Phase 3 -- GA -- site under the Neocloud lease agreements (fifteen-year term, three five-year options; 152 MW of critical IT capacity across the Auburn, AL and Dalton Phase 3, GA sites)
- v1SX-07-A-0508 · Seraphix record · OracleCOMPANY DISCLOSURE
Approximately 181 data center locations globally, substantially all leased, used to deliver Oracle Cloud offerings (10-K, filed 2026-06-22)
- v1COMPANY DISCLOSURE
Childress campus -- operating (currently supporting Bitcoin mining operations)
History → - v1COMPANY DISCLOSURE
Horizons 5 and 6 at the Childress campus -- 150 MW -- development of additional direct-to-chip liquid cooling data centers
- v1COMPANY DISCLOSURE
Agreement (May 7, 2026) to acquire Nostrum Group, a Spanish data center developer, adding approximately 490MW of power capacity in Spain (10-Q, filed 2026-05-08)
- v1SX-07-A-0217 · Seraphix record · Core ScientificCOMPANY DISCLOSURE
Denton, Texas -- Denton, Texas -- operating (data center)
History → - v1SX-07-A-0218 · Seraphix record · Core ScientificCOMPANY DISCLOSURE
Marble, North Carolina -- Marble, North Carolina -- operating (data center)
History → - v1SX-07-A-0254 · Seraphix record · Core ScientificCOMPANY DISCLOSURE
Austin, Texas -- Austin, Texas -- operating
History → - v1SX-07-A-0511 · Seraphix record · CoreWeaveCOMPANY DISCLOSURE
43 data centers supported by over 850 MW of active power as of December 31, 2025 (up from 10 data centers / 70 MW at end-2023 and 32 / more than 360 MW at end-2024) (10-K, filed 2026-03-02)
- v1SX-07-A-0512 · Seraphix record · Core ScientificCOMPANY DISCLOSURE
Cottonwood 1 facility -- Texas -- the Debtors' facility mortgaged to secure a promissory note
History → - v1SX-07-A-0513 · Seraphix record · Core ScientificCOMPANY DISCLOSURE
Cedarvale Facility -- Ward County, Texas -- bitcoin mining data center site of the Debtors; sale to Celsius of the site and certain related assets
History → - v1SX-07-B-0003 · Seraphix record · Core ScientificCOMPANY DISCLOSURE
Energy forward purchase contract (October 2023) for forecasted energy purchases at the Pecos, Texas facility, November 1, 2023 through May 31, 2024 ('Energy Derivatives')
- v1SX-07-B-0009 · Seraphix record · VistraCOMPANY DISCLOSURE
20-year PPAs with Meta Platforms to supply 2,609 MW of carbon-free power and capacity from PJM nuclear power plants (announced January 2026)
- v1SX-07-A-0316 · Seraphix record · Cipher DigitalCOMPANY DISCLOSURE
Ulysses Site -- 200 MW -- Ohio -- development (acquired a 200 MW data center site in Ohio)
- v1SX-07-A-0319 · Seraphix record · Cipher DigitalCOMPANY DISCLOSURE
McLennan Site -- 500 MW -- central Texas -- development (estimated energization in 2028)
- v1SX-07-A-0320 · Seraphix record · Cipher DigitalCOMPANY DISCLOSURE
Mikeska Site -- 500 MW -- West Texas -- development (estimated energization in 2028)
- v1SX-07-A-0321 · Seraphix record · Cipher DigitalCOMPANY DISCLOSURE
Milsing Site -- 500 MW -- East Texas -- development (estimated energization between 2028 and 2029)
- v1SX-07-A-0514 · Seraphix record · Cipher DigitalCOMPANY DISCLOSURE
Alborz Facility -- 40 MW bitcoin mining data center (WindHQ JV) -- 49% equity interest held from 2022; interest sold February 19, 2026
- v1SX-07-A-0515 · Seraphix record · Cipher DigitalCOMPANY DISCLOSURE
Bear Facility -- 40 MW bitcoin mining data center (WindHQ JV) -- 49% equity interest held from 2022; interest sold February 19, 2026
- v1SX-07-A-0516 · Seraphix record · Cipher DigitalCOMPANY DISCLOSURE
Chief Facility -- 40 MW bitcoin mining data center (WindHQ JV) -- 49% equity interest held from 2022; interest sold February 19, 2026
- v1SX-07-B-0004 · Seraphix record · Cipher DigitalCOMPANY DISCLOSURE
Luminant Power Agreement (power purchase agreement entered June 2021, amended and restated August 23, 2023) for the supply of electric power to the Odessa Facility: access until at least July 2027 at approximately 2.7 c/kWh (2.8 c/kWh from October 2025); take-or-pay for at least 66.7% of the full 207 MW capacity each year (10-K, filed 2026-02-24)
- v1SX-07-A-0517 · Seraphix record · Digital RealtyCOMPANY DISCLOSURE
Teraco (majority interest acquired August 1, 2022): in-service portfolio of seven data centers in Johannesburg, Cape Town and Durban (10-K, filed 2026-02-13)
- v1SX-07-A-0518 · Seraphix record · Digital RealtyCOMPANY DISCLOSURE
BDIA joint venture (formed March 2025, 50% interest): two land parcels and two buildings in Jakarta, Indonesia that can support up to approximately 32 megawatts of IT load (10-K, filed 2026-02-13)
- v1SX-07-A-0519 · Seraphix record · Digital RealtyCOMPANY DISCLOSURE
Frankfurt, Germany data center: sale to DCREIT of an additional 15.1% interest closed December 2024 (approximately $77 million); facility derecognized (10-K, filed 2026-02-13)
History → - v1SX-07-A-0520 · Seraphix record · Digital RealtyCOMPANY DISCLOSURE
Blackstone joint venture (formed January 11, 2024) to develop four hyperscale data center campuses across Frankfurt, Paris and Northern Virginia, planned to support 10 data centers with approximately 500 MW of potential IT load; first phase closed on campuses in Paris and Northern Virginia, second phase closed Q4 2024 (10-K, filed 2026-02-13)
History → - v1SX-07-A-0521 · Seraphix record · Digital RealtyCOMPANY DISCLOSURE
Cyxtera leases (January 2024): leases bought out in three data centers in Singapore and Frankfurt; Brookfield assumed the leases on three facilities previously leased to Cyxtera and amended the leases on three additional data centers in North America (10-K, filed 2026-02-13)
History → - v1SX-07-A-0522 · Seraphix record · Digital RealtyCOMPANY DISCLOSURE
16-acre site in Paris acquired January 2024 ($80 million); the land consisted of two completed data centers and two data centers under construction (10-K, filed 2026-02-13)
History → - v1SX-07-A-0523 · Seraphix record · Digital RealtyCOMPANY DISCLOSURE
Two data centers in the Slough Trading Estate acquired July 2024 for $200 million, combined capacity of 15 MW (10-K, filed 2026-02-13)
- v1SX-07-A-0524 · Seraphix record · Digital RealtyCOMPANY DISCLOSURE
TPG Real Estate joint venture (July 25, 2023): TPG acquired an 80% interest in three stabilized hyperscale data center buildings in Northern Virginia contributed by the company (10-K, filed 2026-02-13)
History → - v1SX-07-A-0525 · Seraphix record · Digital RealtyCOMPANY DISCLOSURE
Realty Income joint venture (November 10, 2023) to support the development of two data centers in Northern Virginia, 100% pre-leased prior to construction (10-K, filed 2026-02-13)
- v1SX-07-A-0526 · Seraphix record · Digital RealtyCOMPANY DISCLOSURE
Mitsubishi joint venture (March 2024) to support the development of two data centers in the Dallas metro area (10-K, filed 2026-02-13)
- v1SX-07-A-0536 · Seraphix record · Digital RealtyCOMPANY DISCLOSURE
9905 Godwin Drive -- Northern Virginia -- data center site with LEED Gold level achieved in 2025 (10-K sustainability table)
- v1SX-07-A-0537 · Seraphix record · Digital RealtyCOMPANY DISCLOSURE
805 E. Holford Road -- Dallas -- data center site with LEED Gold level achieved in 2025 (10-K sustainability table)
- v1SX-07-A-0538 · Seraphix record · Digital RealtyCOMPANY DISCLOSURE
10051 Brickyard Way -- Northern Virginia -- data center site with LEED Gold level achieved in 2025 (10-K sustainability table)
- v1SX-07-A-0539 · Seraphix record · Digital RealtyCOMPANY DISCLOSURE
2 Avenue Marcel Cachin (PAR10) -- Paris, France -- data center site with LEED Silver level achieved in 2025 (10-K sustainability table)
- v1SX-07-A-0540 · Seraphix record · Digital RealtyCOMPANY DISCLOSURE
Mercuriusstraat 27 (BRU4) -- Brussels, Belgium -- data center site with LEED Silver level achieved in 2025 (10-K sustainability table)
- v1SX-07-A-0541 · Seraphix record · Digital RealtyCOMPANY DISCLOSURE
2 Avenue Marcel Cachin (PAR11) -- Paris, France -- data center site with LEED Gold level achieved in 2025 (10-K sustainability table)
- v1SX-07-A-0527 · Seraphix record · EquinixCOMPANY DISCLOSURE
255 IBX data centers as of December 31, 2025 (Americas 109, EMEA 88, Asia-Pacific 58; excludes 25 unconsolidated data centers), located in the metros listed in the 10-K Item 2 locations table (10-K, filed 2026-02-11)
History → - v1SX-07-A-0528 · Seraphix record · EquinixCOMPANY DISCLOSURE
16 new data centers opened in 2025 (including sites added via joint ventures and acquisitions) in Chennai, Chicago, Dublin, Frankfurt, Jakarta, Lisbon, Madrid, Manila, Monterrey, Mumbai, Salalah, São Paulo and Washington, D.C.; total data center facilities 280 (10-K, filed 2026-02-11)
History → - v1SX-07-A-0529 · Seraphix record · EquinixCOMPANY DISCLOSURE
Acquisition of TIM NextGen DC Corporation, consisting of three data centers in the Philippines ($183 million) completed; entry into the Philippines market (10-K, filed 2026-02-11)
- v1SX-07-A-0530 · Seraphix record · EquinixCOMPANY DISCLOSURE
Hampton data center campus -- greater Atlanta metro area -- assets and liabilities sold to the AMER 3 Joint Venture on January 13, 2026; total 25% economic interest in the joint venture
- v1SX-07-A-0542 · Seraphix record · EquinixCOMPANY DISCLOSURE
NY11 phase 5 -- New York -- IBX data center project under construction as of December 31, 2025; target open date Q1 2026 (10-K, filed 2026-02-11)
- v1SX-07-A-0543 · Seraphix record · EquinixCOMPANY DISCLOSURE
RJ3 phase 2 -- Rio de Janeiro -- IBX data center project under construction as of December 31, 2025; target open date Q4 2026 (10-K, filed 2026-02-11)
- v1SX-07-A-0544 · Seraphix record · EquinixCOMPANY DISCLOSURE
SP7 phase 1 -- São Paulo -- IBX data center project under construction as of December 31, 2025; target open date Q4 2026 (10-K, filed 2026-02-11)
- v1SX-07-A-0545 · Seraphix record · EquinixCOMPANY DISCLOSURE
SP4 phase 5 -- São Paulo -- IBX data center project under construction as of December 31, 2025; target open date Q2 2027 (10-K, filed 2026-02-11)
- v1SX-07-A-0546 · Seraphix record · EquinixCOMPANY DISCLOSURE
BG2 phase 2 -- Bogotá -- IBX data center project under construction as of December 31, 2025; target open date Q2 2026 (10-K, filed 2026-02-11)
- v1SX-07-A-0547 · Seraphix record · EquinixCOMPANY DISCLOSURE
SV18 phase 1 -- Silicon Valley -- IBX data center project under construction as of December 31, 2025; target open date Q2 2026 (10-K, filed 2026-02-11)
- v1SX-07-A-0548 · Seraphix record · EquinixCOMPANY DISCLOSURE
MI1 redevelopment -- Miami -- IBX data center project under construction as of December 31, 2025; target open date Q3 2026 (10-K, filed 2026-02-11)
- v1SX-07-A-0549 · Seraphix record · EquinixCOMPANY DISCLOSURE
DC17 phases 1 and 2 -- Washington, D.C. -- IBX data center project under construction as of December 31, 2025; target open date Q2 2027 (10-K, filed 2026-02-11)
- v1SX-07-A-0550 · Seraphix record · EquinixCOMPANY DISCLOSURE
DC22 phase 2 -- Washington, D.C. -- IBX data center project under construction as of December 31, 2025; target open date Q2 2027 (10-K, filed 2026-02-11)
- v1SX-07-B-0007 · Seraphix record · EquinixCOMPANY DISCLOSURE
29 power purchase agreements executed in 12 countries, 1,472 MW of new wind and solar capacity in the portfolio (as of December 31, 2025)
- v1COMPANY DISCLOSURE
Canal Flats -- 30 MW -- operating
History → - v1COMPANY DISCLOSURE
Mackenzie -- 80 MW -- operating (has been operating since April 2022)
History → - v1COMPANY DISCLOSURE
Prince George -- 50 MW -- operating (has been operating since September 2022)
History → - v1SX-09-TX-0002 · Seraphix record · TexasENACTED
SB 6 (89th Legislature) -- large-load interconnection standards; demand threshold of 75 MW in the ERCOT region
- v1SX-09-GA-01 · Seraphix record · GeorgiaREPORTED · PRIMARY PENDING
Governor vetoed HB 1192 (2024 session), listed as Veto 7 in the Governor's 2024 veto messages. Per the veto message, the bill would have imposed a two-year pause on issuing sales and use tax exemption certificates to high-technology data centers and data center customers, cutting off new certificates after July 1, 2024 for many customers of projects already in development. Stated reason: the legislature had extended these exemptions two years earlier through 2031, and the pause would undermine investments made in reliance on that extension.
- v1SX-09-VA-01 · Seraphix record · VirginiaENACTED
Sales and use tax exemption for computer equipment and enabling software purchased or leased for use in a qualifying data center, applying to the data center operator and the tenants of the data center collectively, running from July 1, 2010 to June 30, 2035, with extensions available under subdivision 19. Thresholds include $150 million of capital investment and 50 new jobs paying at least 1.5 times the local prevailing wage; lower thresholds apply in distressed localities.
SX 11-D // INDEX SX 07 // COMPANIES
Companies
OBSERVED · LAST GOOD CHECK
| Company | Role | Status | Records | Last record | Last filing (wire) |
|---|---|---|---|---|---|
| Applied Digital CIK 0001144879 | HOST | STUB | 12 | 10-Q | |
| Cipher Digital CIK 0001819989 | HOST | FULL | 21 | 10-Q | |
| Constellation Energy CIK 0001868275 | POWER | STUB | 0 | none on file | none in wire window |
| Core Scientific CIK 0001839341 | HOST | STUB | 12 | 10-Q | |
| CoreWeave CIK 0001769628 | HOST | STUB | 4 | 8-K | |
| Digital Realty CIK 0001297996 | LANDLORD | STUB | 20 | 8-K | |
| Equinix CIK 0001101239 | LANDLORD | STUB | 15 | 424B2 | |
| IREN CIK 0001878848 | HOST | STUB | 15 | 10-Q | |
| NRG CIK 0001013871 | POWER | STUB | 0 | none on file | none in wire window |
| Oracle CIK 0001341439 | CLOUD | STUB | 1 | 8-K | |
| Vertiv CIK 0001674101 | EQUIPMENT | STUB | 0 | none on file | 10-Q |
| Vistra CIK 0001692819 | POWER | STUB | 2 | 8-K |
FULL = reviewed source-linked sections on file. STUB = identity and filings only. Pilot 01 → · Entity index →
SX 11-E // STATE SX 09
States
- Georgia →GA · 2 RECORDS · GRID SOCO
- Texas →TX · 24 RECORDS · GRID ERCOT
- Virginia →VA · 1 RECORD · GRID PJM
SX 11-F // SOURCES
Coverage
OBSERVED · LAST GOOD CHECK
| Source | Coverage | Last good check |
|---|---|---|
| SEC EDGAR · filings | OBSERVED Filings for every pilot entity | |
| EIA-930 · hourly grid demand | OBSERVED ERCO, PJM, SOCO balancing areas | |
| Statutes, codes + executive actions | OBSERVED · MANUAL Primary text for ENACTED records in pilot states | |
| Press · secondary | OBSERVED · MANUAL Named outlets only; replaced when a primary is attached | |
| State utility commission dockets | NOT MONITORED PUCT, Georgia PSC, Virginia SCC | Not stated in source |
| Large-load interconnection queues | NOT MONITORED ERCOT, PJM, Georgia Power | Not stated in source |
| Environmental + local permits | NOT MONITORED TCEQ, Georgia EPD, Virginia DEQ, local land use | Not stated in source |
| State + county incentive agreements | NOT MONITORED Comptroller, revenue departments, county abatements | Not stated in source |
SX 11-G // OPEN DATA · CC BY 4.0