Seraphix SystemsCompany IntelligenceDashboardDossier pilot · In development

DASHBOARD SX 11 // PUBLIC RECORD ONLY

Dashboard

What the public record set holds right now: reviewed records, the companies and states covered, and SEC filings as SEC accepts them. Every number here is computed from the published data on each request.

Reviewed records
105
Companies covered
12
States
3
SEC filings · last 24 h
5
Records added or changed · 7 days
105
Last update
OBSERVED

SX 11-A // WIRE SX 03 // EDGAR // LATEST 25

Live filings

OBSERVED · LAST GOOD CHECK

LIVE · AS OF · TIMES ARE SEC ACCEPTANCE, ET

  1. 10-QFILING→ SEC
  2. 8-KItem 2.02 Results of Operations and Financial Condition · Item 9.01 Financial Statements and Exhibits→ SEC
  3. 10-QFILING→ SEC
  4. 8-KItem 2.02 Results of Operations and Financial Condition · Item 7.01 Regulation FD Disclosure · Item 9.01 Financial Statements and Exhibits→ SEC
  5. 8-KItem 2.01 Completion of Acquisition or Disposition of Assets · Item 2.03 Creation of a Direct Financial Obligation or an Obligation under an Off-Balance Sheet Arrangement of a Registrant · Item 3.02 Unregistered Sales of Equity Securities · Item 7.01 Regulation FD Disclosure · Item 9.01 Financial Statements and Exhibits→ SEC
  6. 424B2FILING→ SEC
  7. 8-KItem 8.01 Other Events · Item 9.01 Financial Statements and Exhibits→ SEC
  8. 424B5FILING→ SEC
  9. 424B2FILING→ SEC
  10. 424B5FILING→ SEC
  11. 10-QFILING→ SEC
  12. 424B5FILING→ SEC
  13. 424B2FILING→ SEC
  14. S-3ASRFILING→ SEC
  15. 8-KItem 2.02 Results of Operations and Financial Condition · Item 7.01 Regulation FD Disclosure · Item 9.01 Financial Statements and Exhibits→ SEC
  16. 8-KItem 8.01 Other Events · Item 9.01 Financial Statements and Exhibits→ SEC
  17. 424B7FILING→ SEC
  18. 10-QFILING→ SEC
  19. 8-KItem 2.02 Results of Operations and Financial Condition · Item 7.01 Regulation FD Disclosure · Item 9.01 Financial Statements and Exhibits→ SEC
  20. S-3ASRFILING→ SEC
  21. S-3ASRFILING→ SEC
  22. 10-QFILING→ SEC
  23. 10-QFILING→ SEC
  24. 8-KItem 2.02 Results of Operations and Financial Condition · Item 9.01 Financial Statements and Exhibits→ SEC
  25. 8-KItem 7.01 Regulation FD Disclosure · Item 9.01 Financial Statements and Exhibits→ SEC

All filings on the wire → · Atom · JSON Feed · JSON

SX 11-B // NEW RECORDS + NEW VERSIONS // SINCE 2026-10-31

What changed this week

OBSERVED · LAST GOOD CHECK

  1. NEW RECORDCOMPANY DISCLOSURE

    Black Pearl Facility -- 300 MW -- Wink, Texas -- bitcoin mining through February 2026; phased delivery to an HPC tenant commenced August 2026

    History →
  2. NEW RECORDCOMPANY DISCLOSURE

    Barber Lake Facility -- 300 MW -- for Fluidstack USA II Inc. -- company expects phased commencement in Q4 2026

    History →
  3. NEW RECORDCOMPANY DISCLOSURE

    Stingray Facility -- 100 MW -- company expects commencement in 2027

    History →
  4. NEW RECORDCOMPANY DISCLOSURE

    Odessa Facility -- 207 MW -- Odessa, Texas -- wholly owned bitcoin mining data center

    History →
  5. NEW RECORDCOMPANY DISCLOSURE

    Seven additional sites expected to be built out for HPC

  6. NEW RECORDCOMPANY DISCLOSURE

    Delta Forge 2 -- 210 MW -- its southern region -- under construction

    History →
  7. NEW RECORDCOMPANY DISCLOSURE

    Our two buildings at our Polaris Forge 2 campus -- 300 MW -- under construction

    History →
  8. NEW RECORDCOMPANY DISCLOSURE

    Our two buildings at our Polaris Forge 3 campus -- 300 MW -- under construction

    History →
  9. NEW RECORDCOMPANY DISCLOSURE

    Our two buildings at our Delta Forge 1 campus -- 300 MW -- under construction

    History →
  10. NEW RECORDCOMPANY DISCLOSURE

    Colchis Site -- Texas -- development (potential 1 GW site)

    History →
  11. NEW RECORDCOMPANY DISCLOSURE

    multi-phase data center campus -- Kenilworth, New Jersey -- development

    History →
  12. NEW RECORDCOMPANY DISCLOSURE

    Jamestown -- 106 MW -- North Dakota -- operating (hosting site)

    History →
  13. NEW RECORDCOMPANY DISCLOSURE

    Muskogee, Oklahoma data center -- Muskogee, Oklahoma -- operating

    History →
  14. NEW RECORDCOMPANY DISCLOSURE

    Pecos, TX -- Pecos, TX

  15. NEW RECORDCOMPANY DISCLOSURE

    Auburn, AL -- Auburn, AL

  16. NEW RECORDCOMPANY DISCLOSURE

    Hunt County, Texas -- 430 MW -- Hunt County, Texas -- development

    History →
  17. NEW RECORDCOMPANY DISCLOSURE

    Childress campus -- operating (currently supporting Bitcoin mining operations)

    History →
  18. NEW RECORDCOMPANY DISCLOSURE

    Denton, Texas -- Denton, Texas -- operating (data center)

    History →
  19. NEW RECORDCOMPANY DISCLOSURE

    Marble, North Carolina -- Marble, North Carolina -- operating (data center)

    History →
  20. NEW RECORDCOMPANY DISCLOSURE

    Austin, Texas -- Austin, Texas -- operating

    History →
  21. NEW RECORDCOMPANY DISCLOSURE

    Ulysses Site -- 200 MW -- Ohio -- development (acquired a 200 MW data center site in Ohio)

  22. NEW RECORDCOMPANY DISCLOSURE

    McLennan Site -- 500 MW -- central Texas -- development (estimated energization in 2028)

  23. NEW RECORDCOMPANY DISCLOSURE

    Mikeska Site -- 500 MW -- West Texas -- development (estimated energization in 2028)

  24. NEW RECORDCOMPANY DISCLOSURE

    Milsing Site -- 500 MW -- East Texas -- development (estimated energization between 2028 and 2029)

  25. NEW RECORDCOMPANY DISCLOSURE

    Canal Flats -- 30 MW -- operating

    History →
  26. NEW RECORDCOMPANY DISCLOSURE

    Mackenzie -- 80 MW -- operating (has been operating since April 2022)

    History →
  27. NEW RECORDCOMPANY DISCLOSURE

    Prince George -- 50 MW -- operating (has been operating since September 2022)

    History →
  28. NEW RECORDCOMPANY DISCLOSURE

    first HPC data center at Polaris Forge 1 campus -- 100 MW -- Ellendale, North Dakota -- commenced operations in the prior fiscal year

    History →
  29. NEW RECORDCOMPANY DISCLOSURE

    second HPC data center at Polaris Forge 1 campus -- 150 MW -- began commencing operations; reached full 150MW capacity as of the 10-Q filing date

    History →
  30. NEW RECORDCOMPANY DISCLOSURE

    third HPC building at Polaris Forge 1 campus -- 150 MW -- under construction; full ready for service anticipated in calendar year 2027

    History →
  31. NEW RECORDCOMPANY DISCLOSURE

    180 MW facility in Ellendale, North Dakota -- 180 MW -- continues to operate at full capacity as of August 31, 2026

    History →
  32. NEW RECORDCOMPANY DISCLOSURE

    1 additional HPC data center facility under a March 2026 hyperscaler lease at one of the Company's existing sites in Texas; phased delivery expected to begin in 2027 (10-Q Note 12, filed 2026-11-02)

    History →
  33. NEW RECORDCOMPANY DISCLOSURE

    Reveille Facility -- LaSalle, Texas -- land lease (up to 52 acres) assumed October 2024 for the purpose of constructing a data center

    History →
  34. NEW RECORDCOMPANY DISCLOSURE

    Currently developing 700 MW of HPC data center facilities across three sites for hyperscaler tenants (10-Q MD&A, filed 2026-11-02)

    History →
  35. NEW RECORDCOMPANY DISCLOSURE

    Grid pipeline of approximately 3.4 GW across six sites in Texas and one additional site in Ohio (10-Q MD&A, filed 2026-11-02)

    History →
  36. NEW RECORDCOMPANY DISCLOSURE

    August 2026 DCREIT agreements: DCREIT to acquire an additional 25% interest in a data center in Osaka, Japan and a 2.5% interest in a data center in Singapore from subsidiaries of the Company; subsidiaries of the Company to acquire DCREIT's 90% interest in data centers in Los Angeles and Toronto and a 39% interest in a data center in Northern Virginia; expected to close in the fourth quarter (10-Q, filed 2026-10-30)

    History →
  37. NEW RECORDCOMPANY DISCLOSURE

    Two data centers and associated land in Cyberjaya, Malaysia acquired for $137 million during the three months ended June 30, 2026 (10-Q, filed 2026-10-30)

    History →
  38. NEW RECORDCOMPANY DISCLOSURE

    Digital Dulles campus -- development projects contributed to the joint venture with Blackstone in April 2025 (gross proceeds approximately $77 million)

  39. NEW RECORDCOMPANY DISCLOSURE

    Asia-Pacific 4 Joint Venture (10% ownership interests) to purchase the assets and liabilities of two data centers in Greater Tokyo, Japan from the Asia-Pacific 1 Joint Venture; closed October 1, 2026 (10-Q, filed 2026-10-28)

  40. NEW RECORDCOMPANY DISCLOSURE

    Horizon 1 -- Childress, Texas -- delivered to, and accepted by, Microsoft in August 2026

    History →
  41. NEW RECORDCOMPANY DISCLOSURE

    Horizon 2 -- Childress, Texas -- targeted for delivery in phases in calendar Q4 2026

    History →
  42. NEW RECORDCOMPANY DISCLOSURE

    Horizon 3 -- Childress, Texas -- targeted for delivery in phases in calendar Q4 2026

    History →
  43. NEW RECORDCOMPANY DISCLOSURE

    Horizon 4 -- Childress, Texas -- targeted for delivery in phases in calendar Q4 2026

    History →
  44. NEW RECORDCOMPANY DISCLOSURE

    Lease for various buildings at a single unnamed site intended to be used as a data center; 393 MW of electrical power undelivered as of June 30, 2026, expected in phases in 2026 and 2028 (10-Q, filed 2026-08-12)

    History →
  45. NEW RECORDCOMPANY DISCLOSURE

    Data center to be designed, built and managed by a data center service provider, providing access to up to 78 MW of electrical power delivered in phases (DCSP Service Agreement; 10-Q, filed 2026-08-12)

  46. NEW RECORDCOMPANY DISCLOSURE

    Option agreement (July 23, 2026) to acquire a 900 MW site in Texas (10-Q, filed 2026-08-04)

    History →
  47. NEW RECORDCOMPANY DISCLOSURE

    Astra Enterprise Park -- near Kansas City -- approximately 1,440 acres of development land acquired in April 2026

  48. NEW RECORDCOMPANY DISCLOSURE

    Polaris Forge 1 -- Ellendale, North Dakota -- campus being developed in phases

    History →
  49. NEW RECORDCOMPANY DISCLOSURE

    Approximately 40-acre site adjacent to the Muskogee, Oklahoma data center (Polaris DS LLC, with electrical substation) -- Agreement and Plan of Merger to acquire, May 5, 2026; electric service agreements for up to 440 MW of gross utility power capacity

    History →
  50. NEW RECORDCOMPANY DISCLOSURE

    Dalton Phase 3 -- GA -- site under the Neocloud lease agreements (fifteen-year term, three five-year options; 152 MW of critical IT capacity across the Auburn, AL and Dalton Phase 3, GA sites)

  51. NEW RECORDCOMPANY DISCLOSURE

    Approximately 181 data center locations globally, substantially all leased, used to deliver Oracle Cloud offerings (10-K, filed 2026-06-22)

  52. NEW RECORDCOMPANY DISCLOSURE

    Horizons 5 and 6 at the Childress campus -- 150 MW -- development of additional direct-to-chip liquid cooling data centers

  53. NEW RECORDCOMPANY DISCLOSURE

    Agreement (May 7, 2026) to acquire Nostrum Group, a Spanish data center developer, adding approximately 490MW of power capacity in Spain (10-Q, filed 2026-05-08)

  54. NEW RECORDCOMPANY DISCLOSURE

    43 data centers supported by over 850 MW of active power as of December 31, 2025 (up from 10 data centers / 70 MW at end-2023 and 32 / more than 360 MW at end-2024) (10-K, filed 2026-03-02)

  55. NEW RECORDCOMPANY DISCLOSURE

    Cottonwood 1 facility -- Texas -- the Debtors' facility mortgaged to secure a promissory note

    History →
  56. NEW RECORDCOMPANY DISCLOSURE

    Cedarvale Facility -- Ward County, Texas -- bitcoin mining data center site of the Debtors; sale to Celsius of the site and certain related assets

    History →
  57. NEW RECORDCOMPANY DISCLOSURE

    Alborz Facility -- 40 MW bitcoin mining data center (WindHQ JV) -- 49% equity interest held from 2022; interest sold February 19, 2026

  58. NEW RECORDCOMPANY DISCLOSURE

    Bear Facility -- 40 MW bitcoin mining data center (WindHQ JV) -- 49% equity interest held from 2022; interest sold February 19, 2026

  59. NEW RECORDCOMPANY DISCLOSURE

    Chief Facility -- 40 MW bitcoin mining data center (WindHQ JV) -- 49% equity interest held from 2022; interest sold February 19, 2026

  60. NEW RECORDCOMPANY DISCLOSURE

    Teraco (majority interest acquired August 1, 2022): in-service portfolio of seven data centers in Johannesburg, Cape Town and Durban (10-K, filed 2026-02-13)

  61. NEW RECORDCOMPANY DISCLOSURE

    BDIA joint venture (formed March 2025, 50% interest): two land parcels and two buildings in Jakarta, Indonesia that can support up to approximately 32 megawatts of IT load (10-K, filed 2026-02-13)

  62. NEW RECORDCOMPANY DISCLOSURE

    Frankfurt, Germany data center: sale to DCREIT of an additional 15.1% interest closed December 2024 (approximately $77 million); facility derecognized (10-K, filed 2026-02-13)

    History →
  63. NEW RECORDCOMPANY DISCLOSURE

    Blackstone joint venture (formed January 11, 2024) to develop four hyperscale data center campuses across Frankfurt, Paris and Northern Virginia, planned to support 10 data centers with approximately 500 MW of potential IT load; first phase closed on campuses in Paris and Northern Virginia, second phase closed Q4 2024 (10-K, filed 2026-02-13)

    History →
  64. NEW RECORDCOMPANY DISCLOSURE

    Cyxtera leases (January 2024): leases bought out in three data centers in Singapore and Frankfurt; Brookfield assumed the leases on three facilities previously leased to Cyxtera and amended the leases on three additional data centers in North America (10-K, filed 2026-02-13)

    History →
  65. NEW RECORDCOMPANY DISCLOSURE

    16-acre site in Paris acquired January 2024 ($80 million); the land consisted of two completed data centers and two data centers under construction (10-K, filed 2026-02-13)

    History →
  66. NEW RECORDCOMPANY DISCLOSURE

    Two data centers in the Slough Trading Estate acquired July 2024 for $200 million, combined capacity of 15 MW (10-K, filed 2026-02-13)

  67. NEW RECORDCOMPANY DISCLOSURE

    TPG Real Estate joint venture (July 25, 2023): TPG acquired an 80% interest in three stabilized hyperscale data center buildings in Northern Virginia contributed by the company (10-K, filed 2026-02-13)

    History →
  68. NEW RECORDCOMPANY DISCLOSURE

    Realty Income joint venture (November 10, 2023) to support the development of two data centers in Northern Virginia, 100% pre-leased prior to construction (10-K, filed 2026-02-13)

  69. NEW RECORDCOMPANY DISCLOSURE

    Mitsubishi joint venture (March 2024) to support the development of two data centers in the Dallas metro area (10-K, filed 2026-02-13)

  70. NEW RECORDCOMPANY DISCLOSURE

    255 IBX data centers as of December 31, 2025 (Americas 109, EMEA 88, Asia-Pacific 58; excludes 25 unconsolidated data centers), located in the metros listed in the 10-K Item 2 locations table (10-K, filed 2026-02-11)

    History →
  71. NEW RECORDCOMPANY DISCLOSURE

    16 new data centers opened in 2025 (including sites added via joint ventures and acquisitions) in Chennai, Chicago, Dublin, Frankfurt, Jakarta, Lisbon, Madrid, Manila, Monterrey, Mumbai, Salalah, São Paulo and Washington, D.C.; total data center facilities 280 (10-K, filed 2026-02-11)

    History →
  72. NEW RECORDCOMPANY DISCLOSURE

    Acquisition of TIM NextGen DC Corporation, consisting of three data centers in the Philippines ($183 million) completed; entry into the Philippines market (10-K, filed 2026-02-11)

  73. NEW RECORDCOMPANY DISCLOSURE

    Hampton data center campus -- greater Atlanta metro area -- assets and liabilities sold to the AMER 3 Joint Venture on January 13, 2026; total 25% economic interest in the joint venture

  74. NEW RECORDCOMPANY DISCLOSURE

    Sweetwater 1 -- 1400 MW total planned power capacity (gross) -- Texas, United States -- listed among announced data center projects as of June 30, 2026

  75. NEW RECORDCOMPANY DISCLOSURE

    Sweetwater 2 -- 600 MW total planned power capacity (gross) -- Texas, United States -- listed among announced data center projects as of June 30, 2026

  76. NEW RECORDCOMPANY DISCLOSURE

    Kiowa -- 1600 MW total planned power capacity (gross) -- Oklahoma, United States -- listed among announced data center projects as of June 30, 2026

  77. NEW RECORDCOMPANY DISCLOSURE

    Bundey -- 800 MW total planned power capacity (gross) -- South Australia, Australia -- listed among announced data center projects as of June 30, 2026

  78. NEW RECORDCOMPANY DISCLOSURE

    Badajoz -- 300 MW total planned power capacity (gross) -- Extremadura, Spain -- listed among announced data center projects as of June 30, 2026

  79. NEW RECORDCOMPANY DISCLOSURE

    9905 Godwin Drive -- Northern Virginia -- data center site with LEED Gold level achieved in 2025 (10-K sustainability table)

  80. NEW RECORDCOMPANY DISCLOSURE

    805 E. Holford Road -- Dallas -- data center site with LEED Gold level achieved in 2025 (10-K sustainability table)

  81. NEW RECORDCOMPANY DISCLOSURE

    10051 Brickyard Way -- Northern Virginia -- data center site with LEED Gold level achieved in 2025 (10-K sustainability table)

  82. NEW RECORDCOMPANY DISCLOSURE

    2 Avenue Marcel Cachin (PAR10) -- Paris, France -- data center site with LEED Silver level achieved in 2025 (10-K sustainability table)

  83. NEW RECORDCOMPANY DISCLOSURE

    Mercuriusstraat 27 (BRU4) -- Brussels, Belgium -- data center site with LEED Silver level achieved in 2025 (10-K sustainability table)

  84. NEW RECORDCOMPANY DISCLOSURE

    2 Avenue Marcel Cachin (PAR11) -- Paris, France -- data center site with LEED Gold level achieved in 2025 (10-K sustainability table)

  85. NEW RECORDCOMPANY DISCLOSURE

    NY11 phase 5 -- New York -- IBX data center project under construction as of December 31, 2025; target open date Q1 2026 (10-K, filed 2026-02-11)

  86. NEW RECORDCOMPANY DISCLOSURE

    RJ3 phase 2 -- Rio de Janeiro -- IBX data center project under construction as of December 31, 2025; target open date Q4 2026 (10-K, filed 2026-02-11)

  87. NEW RECORDCOMPANY DISCLOSURE

    SP7 phase 1 -- São Paulo -- IBX data center project under construction as of December 31, 2025; target open date Q4 2026 (10-K, filed 2026-02-11)

  88. NEW RECORDCOMPANY DISCLOSURE

    SP4 phase 5 -- São Paulo -- IBX data center project under construction as of December 31, 2025; target open date Q2 2027 (10-K, filed 2026-02-11)

  89. NEW RECORDCOMPANY DISCLOSURE

    BG2 phase 2 -- Bogotá -- IBX data center project under construction as of December 31, 2025; target open date Q2 2026 (10-K, filed 2026-02-11)

  90. NEW RECORDCOMPANY DISCLOSURE

    SV18 phase 1 -- Silicon Valley -- IBX data center project under construction as of December 31, 2025; target open date Q2 2026 (10-K, filed 2026-02-11)

  91. NEW RECORDCOMPANY DISCLOSURE

    MI1 redevelopment -- Miami -- IBX data center project under construction as of December 31, 2025; target open date Q3 2026 (10-K, filed 2026-02-11)

  92. NEW RECORDCOMPANY DISCLOSURE

    DC17 phases 1 and 2 -- Washington, D.C. -- IBX data center project under construction as of December 31, 2025; target open date Q2 2027 (10-K, filed 2026-02-11)

  93. NEW RECORDCOMPANY DISCLOSURE

    DC22 phase 2 -- Washington, D.C. -- IBX data center project under construction as of December 31, 2025; target open date Q2 2027 (10-K, filed 2026-02-11)

  94. NEW RECORDCOMPANY DISCLOSURE

    Power Purchase Agreement (October 4, 2026) with Base Electron for capacity and energy from an approximately 1,200 MW natural gas-fired generation facility to be developed in Center, North Dakota, intended to provide dedicated generation for the Polaris Forge 3 campus

  95. NEW RECORDCOMPANY DISCLOSURE

    Energy services agreement for the Jamestown, North Dakota co-hosting facility (power commitment)

  96. NEW RECORDCOMPANY DISCLOSURE

    Energy forward purchase contract (October 2023) for forecasted energy purchases at the Pecos, Texas facility, November 1, 2023 through May 31, 2024 ('Energy Derivatives')

  97. NEW RECORDCOMPANY DISCLOSURE

    Luminant Power Agreement (power purchase agreement entered June 2021, amended and restated August 23, 2023) for the supply of electric power to the Odessa Facility: access until at least July 2027 at approximately 2.7 c/kWh (2.8 c/kWh from October 2025); take-or-pay for at least 66.7% of the full 207 MW capacity each year (10-K, filed 2026-02-24)

  98. NEW RECORDCOMPANY DISCLOSURE

    Odessa Facility -- supply of a fixed amount of electric power from Luminant under the Luminant Power Agreement (entered June 23, 2021; term of five years, subject to certain early termination exemptions)

  99. NEW RECORDCOMPANY DISCLOSURE

    Black Pearl Facility -- 300 MW data center in Wink, Texas -- draws power from the power grid

  100. NEW RECORDCOMPANY DISCLOSURE

    29 power purchase agreements executed in 12 countries, 1,472 MW of new wind and solar capacity in the portfolio (as of December 31, 2025)

  101. NEW RECORDCOMPANY DISCLOSURE

    20-year PPA (options to extend up to an additional 20 years) with Amazon Web Services to supply 1,200 MW of carbon-free power from the Comanche Peak Nuclear Power Plant (announced September 2025)

  102. NEW RECORDCOMPANY DISCLOSURE

    20-year PPAs with Meta Platforms to supply 2,609 MW of carbon-free power and capacity from PJM nuclear power plants (announced January 2026)

  103. NEW RECORDREPORTED · PRIMARY PENDING

    Governor vetoed HB 1192 (2024 session), listed as Veto 7 in the Governor's 2024 veto messages. Per the veto message, the bill would have imposed a two-year pause on issuing sales and use tax exemption certificates to high-technology data centers and data center customers, cutting off new certificates after July 1, 2024 for many customers of projects already in development. Stated reason: the legislature had extended these exemptions two years earlier through 2031, and the pause would undermine investments made in reliance on that extension.

  104. NEW RECORDENACTED

    SB 6 (89th Legislature) -- large-load interconnection standards; demand threshold of 75 MW in the ERCOT region

  105. NEW RECORDENACTED

    Sales and use tax exemption for computer equipment and enabling software purchased or leased for use in a qualifying data center, applying to the data center operator and the tenants of the data center collectively, running from July 1, 2010 to June 30, 2035, with extensions available under subdivision 19. Thresholds include $150 million of capital investment and 50 new jobs paying at least 1.5 times the local prevailing wage; lower thresholds apply in distressed localities.

Records Atom · Records JSON Feed

SX 11-D // INDEX SX 07 // COMPANIES

Companies

OBSERVED · LAST GOOD CHECK

Covered companies: role, dossier status, reviewed record count, last record date and last SEC filing on the wire
CompanyRoleStatusRecordsLast recordLast filing (wire)
Applied Digital
CIK 0001144879
HOSTSTUB12 10-Q
Cipher Digital
CIK 0001819989
HOSTFULL21 10-Q
Constellation Energy
CIK 0001868275
POWERSTUB0none on filenone in wire window
Core Scientific
CIK 0001839341
HOSTSTUB12 10-Q
CoreWeave
CIK 0001769628
HOSTSTUB4 8-K
Digital Realty
CIK 0001297996
LANDLORDSTUB20 8-K
Equinix
CIK 0001101239
LANDLORDSTUB15 424B2
IREN
CIK 0001878848
HOSTSTUB15 10-Q
NRG
CIK 0001013871
POWERSTUB0none on filenone in wire window
Oracle
CIK 0001341439
CLOUDSTUB1 8-K
Vertiv
CIK 0001674101
EQUIPMENTSTUB0none on file 10-Q
Vistra
CIK 0001692819
POWERSTUB2 8-K

FULL = reviewed source-linked sections on file. STUB = identity and filings only. Pilot 01 → · Entity index →

SX 11-E // STATE SX 09

States

SX 11-F // SOURCES

Coverage

OBSERVED · LAST GOOD CHECK

Source coverage and last good check
SourceCoverageLast good check
SEC EDGAR · filingsOBSERVED

Filings for every pilot entity

EIA-930 · hourly grid demandOBSERVED

ERCO, PJM, SOCO balancing areas

Statutes, codes + executive actionsOBSERVED · MANUAL

Primary text for ENACTED records in pilot states

Press · secondaryOBSERVED · MANUAL

Named outlets only; replaced when a primary is attached

State utility commission docketsNOT MONITORED

PUCT, Georgia PSC, Virginia SCC

Not stated in source
Large-load interconnection queuesNOT MONITORED

ERCOT, PJM, Georgia Power

Not stated in source
Environmental + local permitsNOT MONITORED

TCEQ, Georgia EPD, Virginia DEQ, local land use

Not stated in source
State + county incentive agreementsNOT MONITORED

Comptroller, revenue departments, county abatements

Not stated in source

SX 11-G // OPEN DATA · CC BY 4.0

Data and feeds