SX-07-A-0544

COMPANY DISCLOSURE

SP7 phase 1 -- São Paulo -- IBX data center project under construction as of December 31, 2025; target open date Q4 2026 (10-K, filed 2026-02-11)

Record

RECORD SX 07-A // SITES // FILED 2026-02-11

COMPANY DISCLOSURE

SP7 phase 1 -- São Paulo -- IBX data center project under construction as of December 31, 2025; target open date Q4 2026 (10-K, filed 2026-02-11)

EQUINIX INCBASIS · REGULATOR-HOSTED FILINGSOURCE · EQUINIX INC — 10-K Item 1B. ITEM (normalized-text offset 241519) · SEC EDGARRECORD DATE · v1
Verbatim quote and source
SP7 phase 1 São Paulo Q4 2026 600 35

10-K Item 1B. ITEM (normalized-text offset 241519) · Original source ↗

Supporting source

  1. The following table presents a summary of our significant IBX data center projects under construction as of December 31, 2025: Property Property Location Target Open Date Sellable Cabinets Total Capex (in millions) (1)

    table heading above this row · FILED · SEC EDGAR ↗

Cite: Seraphix Systems, “SX-07-A-0544”, v1, https://seraphixsystems.com/r/SX-07-A-0544, retrieved . · JSON

Basis
REGULATOR-HOSTED FILING
Primary document
EQUINIX INC — 10-K Item 1B. ITEM (normalized-text offset 241519)
occurred
Not stated in source
reported
Not stated in source
source published
first seen
Not stated in source
ingested
corrected
Not stated in source

Version history

  1. v1 (current) SP7 phase 1 -- São Paulo -- IBX data center project under construction as of December 31, 2025; target open date Q4 2026 (10-K, filed 2026-02-11)

Coverage

OBSERVED · LAST GOOD CHECK