SX-07-A-0549

COMPANY DISCLOSURE

DC17 phases 1 and 2 -- Washington, D.C. -- IBX data center project under construction as of December 31, 2025; target open date Q2 2027 (10-K, filed 2026-02-11)

Record

RECORD SX 07-A // SITES // FILED 2026-02-11

COMPANY DISCLOSURE

DC17 phases 1 and 2 -- Washington, D.C. -- IBX data center project under construction as of December 31, 2025; target open date Q2 2027 (10-K, filed 2026-02-11)

EQUINIX INCBASIS · REGULATOR-HOSTED FILINGSOURCE · EQUINIX INC — 10-K Item 1B. ITEM (normalized-text offset 241593) · SEC EDGARRECORD DATE · v1
Verbatim quote and source
DC17 phases 1 and 2 Washington, D.C. Q2 2027 4,700 622

10-K Item 1B. ITEM (normalized-text offset 241593) · Original source ↗

Supporting source

  1. The following table presents a summary of our significant IBX data center projects under construction as of December 31, 2025: Property Property Location Target Open Date Sellable Cabinets Total Capex (in millions) (1)

    table heading above this row · FILED · SEC EDGAR ↗

Cite: Seraphix Systems, “SX-07-A-0549”, v1, https://seraphixsystems.com/r/SX-07-A-0549, retrieved . · JSON

Basis
REGULATOR-HOSTED FILING
Primary document
EQUINIX INC — 10-K Item 1B. ITEM (normalized-text offset 241593)
occurred
Not stated in source
reported
Not stated in source
source published
first seen
Not stated in source
ingested
corrected
Not stated in source

Version history

  1. v1 (current) DC17 phases 1 and 2 -- Washington, D.C. -- IBX data center project under construction as of December 31, 2025; target open date Q2 2027 (10-K, filed 2026-02-11)