As of September 30, 2026, we controlled approximately 2.6 GW of gross utility power capacity, or approximately 1.7 GW of total leasable customer power capacity across 11 data centers in seven U.S. states including Alabama (1), Georgia (2), Kentucky (1), North Carolina (1), North Dakota (1), Oklahoma (1), and Texas (4)
10-Q Item 2. Management's Discussion and Analysis of Financial Condition and Results of Operations Unless (normalized-text offset 129580) · Original source ↗
Dossier records do not store a document hash, a fetch time or a listing hash, so a download cannot be compared byte for byte. Check the quote on this page against the document at the link instead.
Seraphix does not fetch the document when you open this page.
The dates above are the ones stored with the record, unchanged.
Version history
v111 data centers -- seven U.S. states · SUPERSEDED · REASON Ingest date corrected: the source filing (accession 0001839341-26-000030, filed 2026-11-05) was first stored 2026-11-05T14:05:03Z; this record had shown the release-wide date 2026-11-04, before the filing existed (site QA 2026-11-12). Claim, quote and source are unchanged. Chairman approval 2026-11-12 18:58 ET. · SOURCE Correction source