In October 2026, we announced a 20-year PPA with Google that will enable more than $4.3 billion of investment across 11 of our nuclear units in Illinois, Pennsylvania, and New Jersey to add approximately 890 MW of incremental generation capacity to the PJM grid, with the first uprate expected in 2028.
10-Q Item 2. MANAGEMENT'S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS (normalized-text offset 240686) · Original source ↗
Seraphix Systems. “SX-07-B-0015” (version 2). RECORD SX 07-B // POWER // FILED 2026-11-09. Published by Seraphix 2026-11-13. Seraphix record: https://seraphixsystems.com/r/SX-07-B-0015. Primary document: https://www.sec.gov/Archives/edgar/data/1868275/000186827526000119/ceg-20260930.htm. Fetched date: not recorded.
BibTeX
@misc{seraphix-SX-07-B-0015-v2,
author = {{Seraphix Systems}},
title = {SX-07-B-0015: RECORD SX 07-B // POWER // FILED 2026-11-09},
howpublished = {\url{https://seraphixsystems.com/r/SX-07-B-0015}},
version = {2},
year = {2026},
date = {2026-11-13},
note = {Primary document: \url{https://www.sec.gov/Archives/edgar/data/1868275/000186827526000119/ceg-20260930.htm}. Fetched date not recorded.}
}
Dossier records do not store a document hash, a fetch time or a listing hash, so a download cannot be compared byte for byte. Check the quote on this page against the document at the link instead.
Seraphix does not fetch the document when you open this page.
The dates above are the ones stored with the record, unchanged.
Version history
v1PPA with Google -- 890 MW -- term 20-year -- October 2026 · SUPERSEDED · REASON Ingest date corrected: the source filing (accession 0001868275-26-000119, filed 2026-11-09) was first stored 2026-11-09T20:05:01Z; this record had shown the release-wide date 2026-11-04, before the filing existed (site QA 2026-11-13). Claim, quote and source are unchanged. Root cause fixed in the extract job the same night. · SOURCE Correction source
v2 (current) PPA with Google -- 890 MW -- term 20-year -- October 2026