STATE SX 09-TX · SITES

Texas site tracker

Permit, interconnection and energization for each tracked data-center site in Texas, each with its date, source link and the exact words or registry field behind it.

Texas site tracker

Live since 2026-11-13 -- each milestone shows only what a public record states. A milestone is shown only when its source links the site to the tracked company: the company's own SEC filing names the site, or the permit holder is the company's subsidiary listed in its Exhibit 21 (filing cited). A name match alone never counts. 'No public source found' means no checked source shows the milestone; 'Not confirmed' means a source exists but its link to the company is not yet proven, so nothing from it is shown. Nothing is inferred.

Texas · 20 sites

Sites

SiteCompany ▲County / MWPermitInterconnectionEnergized
Barber Lake Facility
SX-07-A-0002
Cipher DigitalMitchell
300 MW
air permit issued
2026-01-20
TCEQ public query
approved/executed (issuer statement)
SEC EDGAR filing
energized (issuer statement)
second quarter of 2025
SEC EDGAR filing
Black Pearl Facility
SX-07-A-0001 · SX-07-B-0006
Cipher Digitalnot stated
300 MW
Not confirmedapproved/executed (issuer statement)
SEC EDGAR filing
energized (issuer statement)
SEC EDGAR filing
Colchis Site
SX-07-A-0064
Cipher Digitalnot statedNo public source foundapproved/executed (issuer statement)
SEC EDGAR filing
targeted (issuer statement)
in 2028
SEC EDGAR filing
McLennan Site
SX-07-A-0319
Cipher Digitalnot stated
500 MW
No public source foundERCOT Batch Zero: conditional studied load classification (issuer statement)
SEC EDGAR filing
targeted (issuer statement)
in 2028
SEC EDGAR filing
Mikeska Site
SX-07-A-0320
Cipher Digitalnot stated
500 MW
No public source foundERCOT Batch Zero: conditional studied load classification with PCLR designation (issuer statement)
SEC EDGAR filing
targeted (issuer statement)
in 2028
SEC EDGAR filing
Milsing Site
SX-07-A-0321
Cipher Digitalnot stated
500 MW
No public source foundNo public source foundtargeted (issuer statement)
between 2028 and 2029
SEC EDGAR filing
Odessa Facility
SX-07-A-0004
Cipher Digitalnot stated
207 MW
No public source foundmentioned (issuer statement)
SEC EDGAR filing
energized (issuer statement)
SEC EDGAR filing
Reveille Facility
SX-07-A-0490
Cipher Digitalnot statedNo public source foundapproved/executed (issuer statement)
SEC EDGAR filing
targeted (issuer statement)
for 2027
SEC EDGAR filing
Austin, Texas
SX-07-A-0254
Core Scientificnot statedNo public source foundutility service in place: Austin Energy general tariff (issuer statement)
SEC EDGAR filing
energized (issuer statement)
second quarter of 2024
SEC EDGAR filing
Cedarvale Facility
SX-07-A-0513
Core ScientificWardNo public source foundNo public source foundNo public source found
Cottonwood 1 facility
SX-07-A-0512
Core Scientificnot statedNo public source foundutility contract in place: Texas-New Mexico Power, 253 MW contracted capacity (issuer statement; Cottonwood campus-level)
SEC EDGAR filing
energized: 50MW energized capacity at COT1 (issuer statement)
SEC EDGAR filing
Denton, Texas
SX-07-A-0217
Core Scientificnot statedNot confirmedERCOT conditional approval: Base Load, Pathway (a), 297 MW (issuer statement)
SEC EDGAR filing
energized (issuer statement)
prior to March 25, 2022
SEC EDGAR filing
Hunt County, Texas
SX-07-A-0179 · SX-07-A-0557
Core ScientificHunt
430 MW
Not confirmedapproved/executed (issuer statement)
SEC EDGAR filing
No public source found
Pecos, TX
SX-07-A-0172 · SX-07-B-0003
Core Scientificnot statedNot confirmedERCOT Batch Zero conditional approval: Base Load, Pathway (b), 300 MW (issuer statement)
SEC EDGAR filing
energized (issuer statement)
after March 25, 2022 and before July 10, 2026
SEC EDGAR filing
Horizon 1
SX-07-A-0497
IRENChildresshalted by state order
2026-09-21
SEC EDGAR filing
approved/executed: grid connection agreement for the Childress campus (issuer statement; campus-level)
SEC EDGAR filing
energized (issuer statement)
August 2026
SEC EDGAR filing
Horizon 2
SX-07-A-0498
IRENChildresshalted by state order
2026-09-21
SEC EDGAR filing
approved/executed: grid connection agreement for the Childress campus (issuer statement; campus-level)
SEC EDGAR filing
targeted (issuer statement)
calendar Q4 2026
SEC EDGAR filing
Horizon 3
SX-07-A-0499
IRENChildresshalted by state order
2026-09-21
SEC EDGAR filing
approved/executed: grid connection agreement for the Childress campus (issuer statement; campus-level)
SEC EDGAR filing
targeted (issuer statement)
calendar Q4 2026
SEC EDGAR filing
Horizon 4
SX-07-A-0500
IRENChildresshalted by state order
2026-09-21
SEC EDGAR filing
approved/executed: grid connection agreement for the Childress campus (issuer statement; campus-level)
SEC EDGAR filing
targeted (issuer statement)
calendar Q4 2026
SEC EDGAR filing
Sweetwater 1
SX-07-A-0531
IRENnot stated
1400 MW
No public source foundapproved/executed: grid connection agreement (issuer statement)
SEC EDGAR filing
substation energized (issuer statement)
SEC EDGAR filing
Sweetwater 2
SX-07-A-0532
IRENnot stated
600 MW
Not confirmedapproved/executed: 600MW grid connection agreement with AEP Texas Inc. (issuer statement)
March 17, 2025
SEC EDGAR filing
targeted: substation energization (issuer statement)
fourth quarter of calendar year 2027
SEC EDGAR filing

Counts are computed by Seraphix from the rows below; they are not source figures. 20 sites · 41 milestones shown · 14 with no public source · 5 not confirmed.

Quotes, fields and company links

Evidence by site

Barber Lake Facility · Cipher Digital

Records
SX-07-A-0002
County
Mitchell
TCEQ Central Registry RN112273891, held by the company's Exhibit 21 subsidiary CIPHER BARBER LAKE LLC
Location
near Colorado City, Texas
MW
300 · source
Permit
air permit issued · 2026-01-20
Date: TCEQ NSR project complete date (first registration of this permit number)
TCEQ NSR permit 182754 type PBR (30 TAC 106.511) status EFFECTIVE; project 403704 'PBR NEW REGISTRATION' INITIAL received 01/20/2026 complete 01/20/2026; customer CIPHER BARBER LAKE LLC; RN RN112273891 'BARBER LAKE DATA CENTER PROJECT', MITCHELL County
TCEQ public query · Source
Link to company: TCEQ customer 'CIPHER BARBER LAKE LLC' = Ex.21 subsidiary 'Cipher Barber Lake LLC' (https://www.sec.gov/Archives/edgar/data/1819989/000181998926000009/exh211subsidiariesasof1231.htm); site term 'Barber Lake' in RE name/location
Interconnection
approved/executed (issuer statement)
Cipher Barber Lake has received approvals for 300 MW of interconnection without any restrictions on the load profile and has entered into agreements necessary to participate in the Electric Reliability Council of Texas (“ERCOT”) market.
SEC EDGAR filing · 10-K filed 2026-02-24 · Source
Link to company: site name 'Barber Lake' in Cipher Digital's own filing (CIK 0001819989)
Energized
energized (issuer statement) · second quarter of 2025
Date: date phrase adjacent to the milestone phrase in the quote
The increase in the three months ended June 30, 2025 is driven primarily by additional power costs from the energization of the Black Pearl and Barber Lake facilities in the second quarter of 2025.
SEC EDGAR filing · 10-Q filed 2025-08-07 · Source
Link to company: site name 'Barber Lake' in Cipher Digital's own filing (CIK 0001819989)

Black Pearl Facility · Cipher Digital

Records
SX-07-A-0001 · SX-07-B-0006
County
not stated by a linked source
Location
Wink, Texas
MW
300 · source
Permit
Not confirmed: a source exists, but its link to the company is not proven
Interconnection
approved/executed (issuer statement)
The Black Pearl Facility has received approvals for 300 MW of interconnection and has entered into agreements necessary to participate in the ERCOT market.
SEC EDGAR filing · 10-K filed 2026-02-24 · Source
Link to company: site name 'Black Pearl' in Cipher Digital's own filing (CIK 0001819989)
Energized
energized (issuer statement)
Date: date phrase adjacent to the milestone phrase in the quote
The Company has a 300 MW data center in Wink, Texas that draws power from the power grid (the “Black Pearl Facility”) that was used for bitcoin mining through February 2026, and in August 2026 commenced phased delivery to an HPC tenant.
SEC EDGAR filing · 10-Q filed 2026-11-02 · Source
Link to company: site name 'Black Pearl' in Cipher Digital's own filing (CIK 0001819989)

Colchis Site · Cipher Digital

Records
SX-07-A-0064
County
not stated by a linked source
Location
Texas
Permit
No public source found
Interconnection
approved/executed (issuer statement)
The Colchis Site includes a fully executed direct interconnection agreement with American Electric Power (“AEP”) for a dual interconnection facility targeting energization in 2028 and options to buy approximately 620 acres of land adjacent to an existing substation.
SEC EDGAR filing · 10-K filed 2026-02-24 · Source
Link to company: site name 'Colchis' in Cipher Digital's own filing (CIK 0001819989)
Energized
targeted (issuer statement) · in 2028
Date: date phrase adjacent to the milestone phrase in the quote
The Colchis Site includes a fully executed direct interconnection agreement with American Electric Power (“AEP”) for a dual interconnection facility targeting energization in 2028 and options to buy approximately 620 acres of land adjacent to an existing substation.
SEC EDGAR filing · 10-K filed 2026-02-24 · Source
Link to company: site name 'Colchis' in Cipher Digital's own filing (CIK 0001819989)

McLennan Site · Cipher Digital

Records
SX-07-A-0319
County
not stated by a linked source
Location
central Texas
MW
500 · source
Permit
No public source found
Interconnection
ERCOT Batch Zero: conditional studied load classification (issuer statement)
Studied Load Conditional Classification : McLennan (500 MW (1))
SEC EDGAR filing · 8-K filed 2026-11-02 · Source
Link to company: site name 'McLennan' in Cipher Digital's own filing (CIK 0001819989)
Energized
targeted (issuer statement) · in 2028
Date: date phrase adjacent to the milestone phrase in the quote
The McLennan Site has targeted capacity of up to 500 MW and estimated energization in 2028.
SEC EDGAR filing · 10-K filed 2026-02-24 · Source
Link to company: site name 'McLennan Site' in Cipher Digital's own filing (CIK 0001819989)

Mikeska Site · Cipher Digital

Records
SX-07-A-0320
County
not stated by a linked source
Location
West Texas
MW
500 · source
Permit
No public source found
Interconnection
ERCOT Batch Zero: conditional studied load classification with PCLR designation (issuer statement)
Studied Load (PCLR (2)) Conditional Classification : Mikeska (500 MW (1))
SEC EDGAR filing · 8-K filed 2026-11-02 · Source
Link to company: site name 'Mikeska' in Cipher Digital's own filing (CIK 0001819989)
Energized
targeted (issuer statement) · in 2028
Date: date phrase adjacent to the milestone phrase in the quote
The Mikeska Site has targeted capacity of up to 500 MW and estimated energization in 2028.
SEC EDGAR filing · 10-K filed 2026-02-24 · Source
Link to company: site name 'Mikeska' in Cipher Digital's own filing (CIK 0001819989)

Milsing Site · Cipher Digital

Records
SX-07-A-0321
County
not stated by a linked source
Location
East Texas
MW
500 · source
Permit
No public source found
Interconnection
No public source found
Energized
targeted (issuer statement) · between 2028 and 2029
Date: date phrase adjacent to the milestone phrase in the quote
The Milsing Site has targeted capacity of up to 500 MW and estimated energization between 2028 and 2029.
SEC EDGAR filing · 10-K filed 2026-02-24 · Source
Link to company: site name 'Milsing' in Cipher Digital's own filing (CIK 0001819989)

Odessa Facility · Cipher Digital

Records
SX-07-A-0004
County
not stated by a linked source
Location
Odessa, Texas
MW
207 · source
Permit
No public source found
Interconnection
mentioned (issuer statement)
The Luminant Lease Agreement leases a plot of land to the Company for the data center, ancillary infrastructure and electrical system (the “Interconnection Electrical Facilities” or “substation”) of the Odessa Facility.
SEC EDGAR filing · 10-Q filed 2026-11-02 · Source
Link to company: site name 'Odessa Facility' in Cipher Digital's own filing (CIK 0001819989)
Energized
energized (issuer statement)
Date: date phrase adjacent to the milestone phrase in the quote
The Company also operates one wholly owned bitcoin mining data center, a 207 MW site located in Odessa, Texas that draws fixed priced power from a power purchase agreement with its electricity provider (the “Odessa Facility”).
SEC EDGAR filing · 10-Q filed 2026-11-02 · Source
Link to company: site name 'Odessa Facility' in Cipher Digital's own filing (CIK 0001819989)

Reveille Facility · Cipher Digital

Records
SX-07-A-0490
County
not stated by a linked source
Location
LaSalle, Texas
Permit
No public source found
Interconnection
approved/executed (issuer statement)
The Reveille Site has ERCOT interconnection approval of up to 70 MW, with the possibility for expansion.
SEC EDGAR filing · 10-K filed 2026-02-24 · Source
Link to company: site name 'Reveille' in Cipher Digital's own filing (CIK 0001819989)
Energized
targeted (issuer statement) · for 2027
Date: date phrase adjacent to the milestone phrase in the quote
Completed acquisition of Reveille data center site, which includes approvals for 70 MW and potential to expand to 200 MW, with energization targeted for 2027
SEC EDGAR filing · 8-K filed 2024-10-31 · Source
Link to company: site name 'Reveille' in Cipher Digital's own filing (CIK 0001819989)

Austin, Texas · Core Scientific

Records
SX-07-A-0254
County
not stated by a linked source
Location
Austin, Texas
Permit
No public source found
Interconnection
utility service in place: Austin Energy general tariff (issuer statement)
Power for the Austin Campus is supplied by Austin Energy under Austin Energy’s general tariff structure.
SEC EDGAR filing · 8-K filed 2026-04-21 · Source
Link to company: site name 'Austin' in Core Scientific's own filing (CIK 0001839341)
Energized
energized (issuer statement) · second quarter of 2024
Date: date phrase adjacent to the milestone phrase in the quote
In addition, lease operations at our Austin, Texas data center, which commenced in the second quarter of 2024, contributed to higher colocation revenue.
SEC EDGAR filing · record source · Source
Link to company: site name 'Austin, Texas' in Core Scientific's own filing (CIK 0001839341)

Cedarvale Facility · Core Scientific

Records
SX-07-A-0513
County
Ward
the record's own location text
Location
Ward County, Texas
Permit
No public source found
Interconnection
No public source found
Energized
No public source found

Cottonwood 1 facility · Core Scientific

Records
SX-07-A-0512
County
not stated by a linked source
Location
Texas
Permit
No public source found
Interconnection
utility contract in place: Texas-New Mexico Power, 253 MW contracted capacity (issuer statement; Cottonwood campus-level)
The table below summarizes the contracted capacity in megawatts (“MW”) by facility location and electric utility provider as of December 31, 2024: Electric Utility Providers Contracted Power Capacity (MW) Facility Location Tennessee Valley Authority 150 Calvert City, Kentucky ("Calvert") Murphy Electric Power Board 35 Marble, North Carolina ("Marble 1") Duke Energy 68 Marble, North Carolina ("Marble 2") Dalton Utilities 53 Dalton, Georgia ("Dalton 1 & 2") Dalton Utilities 142 Dalton, Georgia ("Dalton 3") Nodak Electric Cooperative, Inc. 100 Grand Forks, North Dakota ("Grand Forks") Denton Municipal Electric 391 Denton, Texas ("Denton") Texas New-Mexico Power 253 Pecos, Texas ("Cottonwood”)
SEC EDGAR filing · 10-K filed 2025-02-27 · Source
Link to company: site name 'Cottonwood' in Core Scientific's own filing (CIK 0001839341)
Energized
energized: 50MW energized capacity at COT1 (issuer statement)
Pecos, TX 250MW (Cottonwood 1 & 2) • Greenfield Buildout in 2022 • Campus has (2) phases – COT1 and COT2 • Core Scientific Leased • COT1 - (1) Operational Building totaling 50MW of energized capacity (~15k miners) with expansion capacity of additional 200MW
SEC EDGAR filing · 8-K filed 2024-06-12 · Source
Link to company: site name 'Cottonwood 1' in Core Scientific's own filing (CIK 0001839341)

Denton, Texas · Core Scientific

Records
SX-07-A-0217
County
not stated by a linked source
Location
Denton, Texas
Permit
Not confirmed: a source exists, but its link to the company is not proven
Interconnection
ERCOT conditional approval: Base Load, Pathway (a), 297 MW (issuer statement)
Denton, Texas: The site’s existing 297 Megawatts of electrical power has been conditionally approved by the Electric Reliability Council of Texas (“ERCOT”) as “Base Load, Pathway (a)” (“longstanding existing load”) based on its status as load energized prior to March 25, 2022 and is not subject to Batch Zero allocation process.
SEC EDGAR filing · 8-K filed 2026-09-10 · Source
Link to company: site name 'Denton' in Core Scientific's own filing (CIK 0001839341)
Energized
energized (issuer statement) · prior to March 25, 2022
Date: date phrase adjacent to the milestone phrase in the quote
Denton, Texas: The site’s existing 297 Megawatts of electrical power has been conditionally approved by the Electric Reliability Council of Texas (“ERCOT”) as “Base Load, Pathway (a)” (“longstanding existing load”) based on its status as load energized prior to March 25, 2022 and is not subject to Batch Zero allocation process.
SEC EDGAR filing · 8-K filed 2026-09-10 · Source
Link to company: site name 'Denton' in Core Scientific's own filing (CIK 0001839341)

Hunt County, Texas · Core Scientific

Records
SX-07-A-0179 · SX-07-A-0557
County
Hunt
named in the site name ('Hunt County, Texas')
Location
Hunt County, Texas; Texas
MW
430 · source
Permit
Not confirmed: a source exists, but its link to the company is not proven
Interconnection
approved/executed (issuer statement)
On May 5, 2026, we closed on the acquisition of land and related electrical power in Hunt County, Texas for approximately $233 million in cash, which is expected to support approximately 430 MW of gross power capacity, with an approved ERCOT interconnection ramp schedule.
SEC EDGAR filing · 10-Q filed 2026-11-05 · Source
Link to company: site name 'Hunt County' in Core Scientific's own filing (CIK 0001839341)
Energized
No public source found

Pecos, TX · Core Scientific

Records
SX-07-A-0172 · SX-07-B-0003
County
not stated by a linked source
Location
Pecos, TX; Pecos, Texas
Permit
Not confirmed: a source exists, but its link to the company is not proven
Interconnection
ERCOT Batch Zero conditional approval: Base Load, Pathway (b), 300 MW (issuer statement)
Pecos, Texas: The existing 300 Megawatts of electrical power has been conditionally approved in Batch Zero as “Base Load, Pathway (b)” (“existing load energized after March 25, 2022 and before July 10, 2026”).
SEC EDGAR filing · 8-K filed 2026-09-10 · Source
Link to company: site name 'Pecos' in Core Scientific's own filing (CIK 0001839341)
Energized
energized (issuer statement) · after March 25, 2022 and before July 10, 2026
Date: date phrase adjacent to the milestone phrase in the quote
Pecos, Texas: The existing 300 Megawatts of electrical power has been conditionally approved in Batch Zero as “Base Load, Pathway (b)” (“existing load energized after March 25, 2022 and before July 10, 2026”).
SEC EDGAR filing · 8-K filed 2026-09-10 · Source
Link to company: site name 'Pecos' in Core Scientific's own filing (CIK 0001839341)

Horizon 1 · IREN

Records
SX-07-A-0497
County
Childress
TCEQ Central Registry RN111563557, held by the company's Exhibit 21 subsidiary IE US DEVELOPMENT HOLDINGS 3 INC
Location
Childress, Texas
Permit
halted by state order · 2026-09-21
For example, on September 21, 2026, the Governor of Texas directed the Texas Commission on Environmental Quality (“TCEQ”) to halt all permits sought by data centers in Texas until completion of ERCOT’s audit of data centers in its interconnection queues.
SEC EDGAR filing · 10-Q filed 2026-11-02 · Source
Link to company: state order covers all permits sought by data centers in TX; this site's own evidence shows the permit sought and not granted
Permit sought: TCEQ Central Registry RN111563557 · AIROP 4951 PENDING (since 2022-08-31) · holder IE US DEVELOPMENT HOLDINGS 3 INC (Exhibit 21) · TCEQ record
Interconnection
approved/executed: grid connection agreement for the Childress campus (issuer statement; campus-level)
We have three data center sites in Texas, United States with executed grid connection agreements, namely Childress, Sweetwater 1 and Sweetwater 2.
SEC EDGAR filing · 10-K filed 2025-08-28 · Source
Link to company: site name 'Childress' in IREN's own filing (CIK 0001878848)
Energized
energized (issuer statement) · August 2026
Date: date phrase adjacent to the milestone phrase in the quote
Recent Developments Customer Delivery Horizon 1 was delivered to and accepted by Microsoft in August 2026 and remains in service.
SEC EDGAR filing · 10-Q filed 2026-11-05 · Source
Link to company: site name 'Horizon 1' in IREN's own filing (CIK 0001878848)

Horizon 2 · IREN

Records
SX-07-A-0498
County
Childress
TCEQ Central Registry RN111563557, held by the company's Exhibit 21 subsidiary IE US DEVELOPMENT HOLDINGS 3 INC
Location
Childress, Texas
Permit
halted by state order · 2026-09-21
For example, on September 21, 2026, the Governor of Texas directed the Texas Commission on Environmental Quality (“TCEQ”) to halt all permits sought by data centers in Texas until completion of ERCOT’s audit of data centers in its interconnection queues.
SEC EDGAR filing · 10-Q filed 2026-11-02 · Source
Link to company: state order covers all permits sought by data centers in TX; this site's own evidence shows the permit sought and not granted
Permit sought: TCEQ Central Registry RN111563557 · AIROP 4951 PENDING (since 2022-08-31) · holder IE US DEVELOPMENT HOLDINGS 3 INC (Exhibit 21) · TCEQ record
Interconnection
approved/executed: grid connection agreement for the Childress campus (issuer statement; campus-level)
We have three data center sites in Texas, United States with executed grid connection agreements, namely Childress, Sweetwater 1 and Sweetwater 2.
SEC EDGAR filing · 10-K filed 2025-08-28 · Source
Link to company: site name 'Childress' in IREN's own filing (CIK 0001878848)
Energized
targeted (issuer statement) · calendar Q4 2026
Date: date phrase adjacent to the milestone phrase in the quote
While Horizon 1 was delivered to, and accepted by, Microsoft in August 2026, Horizon 2-4 is targeted for delivery in phases in calendar Q4 2026, with grace periods under the Microsoft Agreement for delivery extending from mid-Q4 2026 to the beginning of Q2 2027.
SEC EDGAR filing · 10-K filed 2026-08-27 · Source
Link to company: site name 'Horizon 2' in IREN's own filing (CIK 0001878848)

Horizon 3 · IREN

Records
SX-07-A-0499
County
Childress
TCEQ Central Registry RN111563557, held by the company's Exhibit 21 subsidiary IE US DEVELOPMENT HOLDINGS 3 INC
Location
Childress, Texas
Permit
halted by state order · 2026-09-21
For example, on September 21, 2026, the Governor of Texas directed the Texas Commission on Environmental Quality (“TCEQ”) to halt all permits sought by data centers in Texas until completion of ERCOT’s audit of data centers in its interconnection queues.
SEC EDGAR filing · 10-Q filed 2026-11-02 · Source
Link to company: state order covers all permits sought by data centers in TX; this site's own evidence shows the permit sought and not granted
Permit sought: TCEQ Central Registry RN111563557 · AIROP 4951 PENDING (since 2022-08-31) · holder IE US DEVELOPMENT HOLDINGS 3 INC (Exhibit 21) · TCEQ record
Interconnection
approved/executed: grid connection agreement for the Childress campus (issuer statement; campus-level)
We have three data center sites in Texas, United States with executed grid connection agreements, namely Childress, Sweetwater 1 and Sweetwater 2.
SEC EDGAR filing · 10-K filed 2025-08-28 · Source
Link to company: site name 'Childress' in IREN's own filing (CIK 0001878848)
Energized
targeted (issuer statement) · calendar Q4 2026
Date: date phrase adjacent to the milestone phrase in the quote
While Horizon 1 was delivered to, and accepted by, Microsoft in August 2026, Horizon 2-4 is targeted for delivery in phases in calendar Q4 2026, with grace periods under the Microsoft Agreement for delivery extending from mid-Q4 2026 to the beginning of Q2 2027.
SEC EDGAR filing · 10-K filed 2026-08-27 · Source
Link to company: site name 'Horizon 2-4' in IREN's own filing (CIK 0001878848)

Horizon 4 · IREN

Records
SX-07-A-0500
County
Childress
TCEQ Central Registry RN111563557, held by the company's Exhibit 21 subsidiary IE US DEVELOPMENT HOLDINGS 3 INC
Location
Childress, Texas
Permit
halted by state order · 2026-09-21
For example, on September 21, 2026, the Governor of Texas directed the Texas Commission on Environmental Quality (“TCEQ”) to halt all permits sought by data centers in Texas until completion of ERCOT’s audit of data centers in its interconnection queues.
SEC EDGAR filing · 10-Q filed 2026-11-02 · Source
Link to company: state order covers all permits sought by data centers in TX; this site's own evidence shows the permit sought and not granted
Permit sought: TCEQ Central Registry RN111563557 · AIROP 4951 PENDING (since 2022-08-31) · holder IE US DEVELOPMENT HOLDINGS 3 INC (Exhibit 21) · TCEQ record
Interconnection
approved/executed: grid connection agreement for the Childress campus (issuer statement; campus-level)
We have three data center sites in Texas, United States with executed grid connection agreements, namely Childress, Sweetwater 1 and Sweetwater 2.
SEC EDGAR filing · 10-K filed 2025-08-28 · Source
Link to company: site name 'Childress' in IREN's own filing (CIK 0001878848)
Energized
targeted (issuer statement) · calendar Q4 2026
Date: date phrase adjacent to the milestone phrase in the quote
While Horizon 1 was delivered to, and accepted by, Microsoft in August 2026, Horizon 2-4 is targeted for delivery in phases in calendar Q4 2026, with grace periods under the Microsoft Agreement for delivery extending from mid-Q4 2026 to the beginning of Q2 2027.
SEC EDGAR filing · 10-K filed 2026-08-27 · Source
Link to company: site name 'Horizon 2-4' in IREN's own filing (CIK 0001878848)

Sweetwater 1 · IREN

Records
SX-07-A-0531
County
not stated by a linked source
Location
Texas, United States
MW
1400 · source
Permit
No public source found
Interconnection
approved/executed: grid connection agreement (issuer statement)
We have three data center sites in Texas, United States with executed grid connection agreements, namely Childress, Sweetwater 1 and Sweetwater 2.
SEC EDGAR filing · 10-K filed 2025-08-28 · Source
Link to company: site name 'Sweetwater 1' in IREN's own filing (CIK 0001878848)
Energized
substation energized (issuer statement)
We energized the Sweetwater 1 substation on schedule, advanced the Horizon 1-4 liquid-cooled data centers at Childress in support of our $9.7bn contract with Microsoft, and continued transitioning existing data centers from ASICs to GPUs for higher- value AI Cloud workloads.
SEC EDGAR filing · 8-K filed 2026-05-08 · Source
Link to company: site name 'Sweetwater 1' in IREN's own filing (CIK 0001878848)

Sweetwater 2 · IREN

Records
SX-07-A-0532
County
not stated by a linked source
Location
Texas, United States
MW
600 · source
Permit
Not confirmed: a source exists, but its link to the company is not proven
Interconnection
approved/executed: 600MW grid connection agreement with AEP Texas Inc. (issuer statement) · March 17, 2025
Date: date phrase adjacent to the milestone phrase in the quote
On March 17, 2025, IREN Limited (the “Company”) released a press release announcing the signing of a 600MW grid connection agreement with AEP Texas Inc. in relation to its Sweetwater 2 project in West Texas.
SEC EDGAR filing · 6-K filed 2025-03-17 · Source
Link to company: site name 'Sweetwater 2' in IREN's own filing (CIK 0001878848)
Energized
targeted: substation energization (issuer statement) · fourth quarter of calendar year 2027
Date: date phrase adjacent to the milestone phrase in the quote
We are targeting connection to the Electric Reliability Council of Texas (“ERCOT”) grid and a substation energization date in the second quarter of calendar year 2026 for Sweetwater 1 and the fourth quarter of calendar year 2027 for Sweetwater 2.
SEC EDGAR filing · 10-Q filed 2026-02-05 · Source
Link to company: site name 'Sweetwater 2' in IREN's own filing (CIK 0001878848)

Sources and terms

ERCOT public report (for planning purposes only)
ERCOT public report, website Terms of Use; ERCOT states it is for planning purposes only.
SEC EDGAR filing
U.S. SEC EDGAR, public domain; the company's own statement.
TCEQ public query
Texas Commission on Environmental Quality public queries (Central Registry, NSR Air Permits).