Seraphix SystemsCompany IntelligenceDashboardDossier pilot · In development

RECORD SX 07-B // POWER // FILED 2026-11-02

SX-07-B-0006

COMPANY DISCLOSURE

Black Pearl Facility -- 300 MW data center in Wink, Texas -- draws power from the power grid

Record

RECORD SX 07-B // POWER // FILED 2026-11-02

COMPANY DISCLOSURE

Black Pearl Facility -- 300 MW data center in Wink, Texas -- draws power from the power grid

Cipher Digital Inc.BASIS · REGULATOR-HOSTED FILINGSOURCE · Cipher Digital Inc. — 10-Q Note 1 · SEC EDGARRECORD DATE · v1
Verbatim quote and source
The Company has a 300 MW data center in Wink, Texas that draws power from the power grid (the “Black Pearl Facility”)

10-Q Note 1, Nature of operations · Original source ↗

Cite: Seraphix Systems, “SX-07-B-0006”, v1, https://seraphixsystems.com/r/SX-07-B-0006, retrieved . · JSON

Basis
REGULATOR-HOSTED FILING
Primary document
Cipher Digital Inc. — 10-Q Note 1
occurred
Not stated in source
reported
Not stated in source
source published
first seen
Not stated in source
ingested
corrected
Not stated in source

Version history

  1. v1 (current) Black Pearl Facility -- 300 MW data center in Wink, Texas -- draws power from the power grid

Coverage

OBSERVED · LAST GOOD CHECK